Regional Transmission Network Development:

Slides:



Advertisements
Similar presentations
Unconventional Gas and EU Energy Policy
Advertisements

A 2030 framework for climate and energy policies Marten Westrup
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
OECD International Futures Programme 1 OECD Futures Project The Commercialisation of Space and the Development of Space Infrastructure: The Role of Public.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
BlackSea Region Meeting Varna National Reports on Spatial Planning for Coastal Zones and Maritimes Areas Terms of Reference.
Seminar on European Territorial Co-operation – Brussels - 21 February 2005 Cross border co- operation at the EU external borders Seminar on Territorial.
SETSO Task Force Network Access and Congestion Management for the south-eastern European region SETSO Task Force Network Access and Congestion Management.
Evaluation Plan in Hungary Dr. Tamás Tétényi Head of Department for Strategy and Evaluation National Development Agency.
Bosnia and Herzegovina
Vision for the internal electricity market
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
Estonian Road Administration overview of tasks related to public transport management 6 May 2013.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
1 Wyoming Infrastructure Authority November 10, 2009 Superconductor Electricity Pipelines.
Black Sea Energy Conference Bucharest April 3-5 Bo Normark
UMC for Consulting & Services. UMC UMC for Consulting & Services UMC Profile UMC Profile UMC Range of Consulting Services UMC Range of Consulting Services.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
TRANSITION TO THE DIGITAL TERRESTRIAL TELEVISION BROADCASTING IN TURKEY 05 NOVEMBER 2012, BUDAPEST Information and Communication Technologies Authority.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence.
Strictly Private & Confidential 1 Tunis, 21 October 2009 Nur Energie Solar Development in the Mediterranean Basin.
Brief on HVDC 2015 Brief on HVDC 2015
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Commercial Frameworks for Energy Investment Regional Issues and Cooperation Mahama Kappiah ECOWAS Commission May 2008.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
BALTIC RING STUDY From the beginning of 1996 to early 1998, 18 power companies and utility organizations from the 11 countries around the Baltic Sea have.
Mohamed Al-Shaikh, BSc MSc CEng MIET Manager, Maintenance - GCCIA
Bulgartransgaz EAD: Perspectives for Investments and Developing of the Gas Infrastructure Southeast Europe Business Forum; 22 – 23 November 2012, Istanbul.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
1 Electrical Energy Transmission by High-voltage Direct Current (HVDC) and Prospects for an Electrical Market Mohamed Lakhdar HABIB and Rime BOUAROUDJ.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Turkish Power System Overview March 2012
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
March, 2007 Slide no. 1 HVDC Link Romania – Turkey Short presentation George VISAN Director, Investment Projects Management Direction.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
Energy Agency of the Republic of Serbia
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
Stabilisation & Association Process: the EU Policy for South East Europe Brussels December 2004.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
Benefits of the East West Interconnector
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
Goran Majstrovic Davor Bajs Energy Institute HRVOJE POŽAR Croatia PREPARATION FOR LARGE SCALE WIND INTEGRATION IN SOUTH EAST EUROPE Joint TSO.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
“HVDC TRANSMISSION” SUNIT KUMAR SAHOO REG NO-S BRANCH-EEE PREPARED BY.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
HVDC Transmission.
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
GRI-S : Infrastructures The Union list of projects of common interest
Zahrani & Selaata IPP Projects
Preparations for post-2020 Impact Assessment European Commission Directorate General for Regional and Urban Policy Unit DGA Policy.
HVDC Transmission Systems:
Term Project: Challenges in supplying Energy to Central Region
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Presentation transcript:

Regional Transmission Network Development: Regional Transmission Network Development: Implications for Trade and Investment   Turkey – Romania Undersea Cable (Feasibility Study Support) Razvan Purdila, Director Corporate Strategy, Capital Market, Communication and International Relationships, Transelectrica November 11-12, 2009

Romania – Turkey 400 kV HVDC link, undersea cable project USAID USEA WORKSHOP REGIONAL TRANSMISSION NETWORK DEVELOPMENT: IMPLICATIONS FOR TRADE AND INVESTMENT Istanbul, November 2009 Romania – Turkey 400 kV HVDC link, undersea cable project Razvan Purdila, Transelectrica

PART 1 Why HVDC ? – an introduction with technical considerations

Why HVDC systems ?

Advantages for HVDC transmission The HVDC transmission has the major advantage of flexibility in power exchange in comparison with HVAC. Moreover, in case of transmission of bulk electrical energy over long distances (more than 50 km) by submarine cable, the only applicable technology is the HVDC transmission. HVDC is an “intelligent link”. The power flow can be controlled and changed very quickly practically independently from frequency at the terminal busses, voltage or power angle at the terminal busses like in HVAC transmission. Due to the inherent properties of the electronic equipment which forms the converter bridges, the direction of the transmitted power may be also changed very quickly.

HVDC transmission – principles and characteristics In a HVDC system, the electricity is: - Taken from a 3-phase AC network - Converted to DC in a converter station - Transmitted by DC OHL or cable (underground or sub sea) - Converted back to AC in another converter station - Injected into AC network Controllable – power injected where needed, supplemental control, frequency control - Bypass congested circuits – no inadvertent flow - Higher power, fewer lines, no intermediate S/S needed - Lower losses - Facilitates integration of remote diverse resources with less impact on existing grid - Low expensive transmission line - Reactive power demand limited to terminals independent of distances - Narrower ROW, no EMF constraints - No limit to underground or submarine cable length

Cable laying

PART 2 Project scope and premises, short history

Project scope The scope of this project is to install a submarine cable between the Romanian and Turkish TSO’s, Transelectrica and TEIAS respectively. Business concept : commercial interconnector, separately regulated The Project is in line with the policies of both Romanian and Turkish Governments and fits well into the EU Green Paper on Energy and EU strategy of Priority Network Projects. The project also brings a significant contribution and stability to the regional electricity market in South-East Europe. The Project is “on going”, in the Feasibility Study phase

Short history of the project 2004 – April – energy cooperation protocol between Romania and Turkey at ministries level The first mentioning of the cable project 2005 - June – MOU between Transelectrica and TEIAS for the HVDC link project Main scope : to prepare the oportunity study by a joint project team 2006 – November - JPP ( joint position paper ) between Transelectrica and TEIAS Approval of the opportunity study; Decision to continue the study at feasibility study level 2007 – first attempt to launch the feasibility study with minority financing of private investors ( 50 % Swedish grant available ) No success; replacement of the private investor with Nuclearelectrica 2008 – first tender for the FS in new financing conditions; Incompatibility of the grant with open tender requirements 2009 – secont tender; contract signature in June

ROMANIA TURKEY BLACK SEA Romania – Turkey HVDC interconector overview ROMANIA TURKEY BLACK SEA ELEMENT 01 TEL Constanţa Nord Substation ELEMENT 02 TEL Converter station and link to Constanţa Nord substation ELEMENT 03 TEL Underground cable between converter station and HVDC cable connection ELEMENT 04 HVDC cable ELEMENT 05 TEIAS Underground cable between converter station and HVDC cable connection ELEMENT 06 TEIAS Converter station and link to Alibeyköy substation ELEMENT 07 TEIAS Alibeyköy Substation

Part 3 The feasibility study

Connection point with Romanian Power System: 400kV S/S Constanţa Nord; Connection point with Turkish Power System: 400kV S/S Alybeiköy, in Asia; The cables voltage level: 400 kV; The capacity: 600MW; The length: about 400 km; Losses on the cable:- in 600MW transfer: ~ 12MW; in 500MW transfer: ~ 9MW

Feasibility Study (final), including the approvals and advices Deliverables The nominated Designer will submit the following documents: Inception Report Terms of Reference – Objectives for procuring the services and works required for the seabed survey and Geological Study EIA – Environmental Impact Assessment Study, including environmental approval Feasibility Study (draft), including the necessary documentation for approvals and advices Feasibility Study (final), including the approvals and advices Documentation for urbanism certificates in Romania and Turkey Technical Specifications Progress Reports Final Report

NUCLEARELECTRICA VATTENFALL Project team members and their responsibilities Client TRANSELECTRICA & NUCLEARELECTRICA Romania Client Designer VATTENFALL Sweden Client Consultant FICHTNER ENGINEERING Romania Technical Consultant TEIAŞ Turkey

EXPERT TEAMS Economical, institutional and legal, commercial and financial team Electricity market team Technical team Environmental team Procurement team Contract legislation expert Price electricity forecasting expert Electricity market expert Environment expert See bead expert Overhead transmission line expert Electrical substation expert Converter expert HVDC submarine cable expert Permits and approvals expert - Macroeconomic modeling expert - Financial analyze expert - Investment analyze expert - Contract legislation expert - Romanian & international legislation expert Environment expert Romanian & international legislation expert Permits and approvals expert Commercial expert Overhead transmission line expert Electrical substation expert Converter expert HVDC submarine cable expert Environment expert

The Feasibility Study will: Establish the design parameters, capacity and cost estimation for the HVDC link including the most suitable routing, based on previous studies and existing data which include geological, morphological and seabed structure analyze and initial sea depth survey as well as on its own investigations; Assess the legal and environmental impediments and propose the most appropriate and viable way forward for the Project from an operational and legal framework point of view, including also the EIA Study with the afferent approvals, in accordance with legal stipulations from both countries and from EU; (Transelectrica, Nuclearelectrica and TEIAŞ will in this respect support the Designer in this process);

Contain the necessary documentation for obtaining permits and approvals in accordance with existing legislation in Romania and in Turkey, as applicable at the date of project elaboration and corresponding to this phase of the engineering; Contain the necessary documentation to obtain the urbanism certificate; Analyse the financial and economical feasibility of the interconnection project considering private benefits and costs and external effects such as public benefits and costs; Assess suitable possibilities to finance the Project; Propose a time schedule for project implementation and operation; Highlight the commercial, environmental and technical conditions of direct interconnection of the national grids of Turkey and Romania through a submarine cable across the Black Sea, through system studies performed in both countries.

Technical Specifications for procurement and execution will include, at least, a minimal content as follows: - Scope; - Definitions; - Standard and recommendations; - Functional and technical requirements - Testing and inspections - Execution - Provision of information 􀂃 Terms of Reference for procuring the services and work required for the seabed survey and geological study will be established based on our experience in similar projects. For the feasibility study we will perform a study based on existing materials/documentation related to Black Sea seabed survey and geological studies. 􀂃

DELIVERABLES 1. Inception report (within 6 weeks of commencement of the project). 2. Terms of Reference for the Seabed survey and Geological Study. (The draft issue to be submitted within 6 weeks of commencement of the assignment). 3. Plans and Terms of Reference for the Environmental Impact assessment. (To be submitted as an annex to the first Progress report). 4. Environmental Impact Assessment (EIA), incl. environmental approvals. (The draft issue within 8 months and the final issue within 10 months after the commencement of the assignment.) 5. Feasibility Study – draft, incl. the necessary documents for approvals and advices. (8 months after commencement of the assignment). 6. Feasibility Study – final, incl. approvals and advices. (10 months after commencement of the assignment). 7. Documentation for urbanism certificates, in Romania and Turkey (10 months after commencement of the assignment.) 8. Technical Specifications. (Within 14 months after the commencement of the project.) 9. Progress Reports. (To be reported quarterly, no later than the 10th working day after the reporting period.) 10. Final Report. (The final report shall be submitted upon finalisation of the assignement

Investment needs - Investments in the HVDC Link - Costs for Submarine cables - material and installation; - Costs for HVDC land cables and/or HVDC OHTLs and/or HVAC – type overhead electric lines, as applicable in Romania – material and installations; lines, as applicable in Turkey – material and installations; - Costs for converter station, including the A.C. connection in Romania; - Costs for converter station, including the A.C. connection in Turkey; - Telecommunication equipment based on optical fibers - Site costs in Romania; - Site costs in Turkey; - Engineering, project management, project control and commissioning; - Other investments, if any; - Interest rates during construction calculated separately for each of the above mentioned parts of the HVDC link; - Total investment costs for the HVDC link. - Payment for provisional and final expropriations.

Investment needs - Investments in the Romanian and Turkish AC grids Investments in the Romanian AC Grid - AC grid investments exclusive the breaker bay for the HVDC link; - Telecommunication and remote control equipment; - Interest rates calculated separately for each part; - Total investments due to the HVDC link in the Romanian A.C. grid Investments in the Turkish AC Grid - Interest rates during construction calculated separately for each part; - Total investments due to the HVDC link in the Turkish A.C. grid

COMMERCIAL and FINANCIAL ANALYSIS “The price forecast has to be calculated from different perspectives • Long term off-take contract 60 % and 80 %; • Market price for the remaining 40 % and 20 %; • Sufficient Average Price Level (SAPL). “Based on the recommended investment and operational plan the Designer shall establish a financial model and analyse the investment over a time horizon of both 20 years operation and 30 years operation. The output of the model shall be presented in nominal terms

PART 4 Business and regulatory model. Trade and investment roadmap

1000 MW from Romania to Turkey Tranzit scenarios 1000 MW from Romania to Turkey

1000 MW from UCTE (Poland&Slovakia) to Turkey Tranzit scenarios

1000 MW from Russia (IPS/UPS) to Turkey Tranzit scenarios

1000 MW from Turkey to Romania Tranzit scenarios 1000 MW from Turkey to Romania budget

1000 MW from Turkey to UCTE (Serbia and Austria) Tranzit scenarios

1000 MW from Turkey to UCTE (Poland and Slovakia) Tranzit scenarios

Activities to be done in parallel with the feasibilty study Preliminary business model List of main commercial, regulatory and financial hypothesys Documentation on the business experience of existing commercial interconnectors in EU Discussions and clarifications with the regulatory authorities Legal due diligence for the preliminary business model TOR for the complete business study Exploration and identification of potential private partners Letters of intent Develop procedure for the selection of the private investors Full clarifications on TEIAS participation in the project, including Turkish applicable legislation Preliminary legal preparations for the project company ( SPV )

Selection of private investors SPV – the project company First tentative road map Opportunity Study Joint Position Paper MOU -1 2005 MOU -2 Feasibility Study ( 75 % TEL- 25% NE ) Business Study 2008 - 2009 02.2009 Joint Position Paper - Final 2009 International Agreement between Romania and Turkey Selection of private investors SPV – the project company 2010 Project implementation Financing, contracting, supply and instalation 2010 - 2013

THANK YOU FOR YOUR ATTENTION ! e-mail: relatii.investitori@transelectrica.ro razvan.purdila@transelectrica.ro phone: +40213035923 fax: +40213035880 web-site: www.transelectrica.ro