Slide 1 Improving International Collaboration and Teamwork Within the ARISS Working Group Frank H. Bauer, KA3HDO ARISS Chairman ARISS Meeting at ESA ESTEC.

Slides:



Advertisements
Similar presentations
AIAA Task Force on Earth Observations 2 October 2009 AIAA HQ Reston VA.
Advertisements

EuropeAid PARTICIPATORY SESSION 2: Managing contract/Managing project… Question 1 : What do you think are the expectations and concerns of the EC task.
Telebridge Network Status and Future
International Space Station. What is ARISS? The ARISS program is a cooperative venture of NASA, the ARRL and AMSAT and other international space agencies.
The ARISS S Band Beacon/Transponder Project. S Band Beacon There is a new S Band beacon and transponder being planned for the ISS-Ham station. This device.
Amateur Radio on the International Space Station (ARISS)
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
ARISS meeting ESTEC 2014 HAM Video ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC Ground Segment Some considerations about alternative.
 Owen Garriott, W5LFL was the first person to carry a ham radio into space.  He tried to get a ham radio on the earlier Skylab mission, but NASA rejected.
Series 2: Project Management Advanced Project Management for Behavioral Health Electronic Health Records (EHRs) 9/2013 From the CIHS Video Series “Ten.
Amateur Radio on the International Space Station (ARISS) ARISS Funding
Press Briefing 2 August 2000 Frank H. Bauer,
The Narrowband Transition A Primer. Narrowband Transition What is it? What is it? A nation-wide move to new VHF/FM frequencies A nation-wide move to new.
About the NMC About the NMC Updated June 18, 2012.
Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.
ARISS meeting ESTEC 2014 HAM Video Emanuele D’Andria - IØELE.
ISS-HAM Slow Scan Television (SSTV) Project A joint AMSAT-NA And MAREX-NA Project.
World Class Standards CCIF New York - April Grids, Clouds and Service Infrastructures ETSI Strategy & New Initiatives.
Robert Striemer, VE4SHSStefan Wagener, VE4NSA. * Introduction * Presentation on ARISS and SHS Telebridge Project, Timeline and Requirements * Q & A *
Before you begin. For additional assistance, contact your club’s Information Technology Chairperson or Electronic Learning at:
ARISS CANADA 2014 REPORT Daniel Lamoureux, VE2KA Maurice- André Vigneault, VE3VIG presented by Stefan Wagener, VE4NSA/VE4SW ARISS-I Delegates Meeting ESA.
ISS Ham common Interfaces. The problem The interfaces in the Russian and US segment are different for both Power and RF and probably other ways. The requirements.
IAEA Regulatory Cooperation Forum Programme and Activities RCF Plenary 18 th September 2015 Dr. Bismark Tyobeka RCF Vice Chairman.
ARISS meeting ESTEC 2014 ARISS Europe - Regional Scheduling Procedures Francesco De Paolis – IKØWGF.
Fall 2015ECEn 4901 Team work and Team Building. Fall 2015 ECEn Lecture 1 review Did you find the class website? Have you met with your team? Have.
January Software Research and Technology Infusion 14 January 2008 Presented by Lisa Montgomery, NASA Pavan Rajagopal,
ARISS meeting ESTEC 2014 ARISS Europe - Space Agency Support for Educational Outreach Francesco De Paolis – IKØWGF.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
CITEL Inter-American Telecommunication Commission Comisión Interamericana de Telecomunicaciones 28 April 2003GSC-8 Meeting, Ottawa, Canada CITEL Organization.
1 Guiding Principles for Nationwide Interoperability A Brief Overview of Recent Efforts and Progress.
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
Amateur Radio on the International Space Station Challenger Learning Center 2008 Annual Conference August 27, 2008 John Nickel, Keith D.
An Amateur Radio Station on Columbus the European Space Laboratory Presentation Gaston Bertels – ON4WF ARISS-Europe chairman.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
THE FINAL ACTS OF THE ITU PLENIPOTENTIARY CONFERENCE, MARRAKESH, MOROCCO 2002 PRESENTATION TO SELECT COMMITTEE ON LABOUR AND PUBLIC ENTERPRISES.
Fall 2002 Internet2 Member Meeting Remote Instrumentation WG T. Charles Yun Program Manager October 2002.
A GEO Label: Status, Issues, Next Steps Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
SuitSat-1 A Unique Satellite By Gould SmithWA4SXM By Gould Smith, WA4SXM.
Review on the Participation of Lithuanian Organizations in EU Funding Anzelma Useliene International programmes, MITA.
Social Studies The Station of Nations. Social Studies The Station of Nations Learn about: The history of space stations. Who is involved in the International.
Chapter 3 Rules and Regulations Regulatory Bodies Unlike VHF and UHF signals, HF signals can easily travel across international boundaries. The International.
Meeting of the UK Council of Research Repositories UKCoRR 2009 A professional body for repository managers.
Establishment of QIT and WIT 5S Training of Trainers for Training Institutions Training material No. 24.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
Use of CAP Radios on Federal Installations Produced by the Southeast Region Communications Team in cooperation with the AFAUX/CAP Spectrum Manager.
Team Assignment Importance of the assignment Assignment details Team Allocations Presentation details Submission Requirements Feed forward into Assignment.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Strategic Planning Roundtable for Economic Development.
FINAL (Living Charter)
ISACC Activities Since GSC-16
Welcome to CFMA’s Chapter PresidentS’ Orientation
Internship orientation: Research module basics
Succession Planning DGN Charles Johnson.
ETSI Standardization Activities on M2M communications
MAREX & ARISS-RUSSIA Personal Message System (PMS)
In what way does leadership play a role in your current position?
600 MHz – Proposed TV Transition Objectives and Methodology
CEOS Background & Mission
Overview of working draft v. 29 January 2018
Roles of NLO, CP and RDC’s
Strategic Framework (updated June 2018)
ISACC Activities Since GSC-16
GFOI and SDCG Update & CEOS Next Steps
VC Title Goes Here Name (s), Organization, CEOS Affiliation
WG Title Goes Here Name (s), Organization, CEOS Affiliation
ARIB Standards Development for Broadband Wireless Access systems
Research Community Forum
Individual vs. Teamwork
Presentation transcript:

Slide 1 Improving International Collaboration and Teamwork Within the ARISS Working Group Frank H. Bauer, KA3HDO ARISS Chairman ARISS Meeting at ESA ESTEC 3 April 2014

Slide 2 Observations ARISS has not had a face to face meeting since 2011 –In the past, ARISS held 1-2 meetings every 1.5 years –Face to face meetings foster information sharing, networking, strategic planning and serves as a major team milestone We have experienced many changes & issues since 2011 Change: ISS construction complete Change: US proposal process Change: New Ham TV Equipment Issue: Service Module and Columbus Module Hardware Issue: NASA Education Funding Losses To sustain ARISS, we need to work very close as a team –Shows the space agencies that we can be effective in an international forum –If NASA and the other space agencies sees ARISS as too much of a burden, they will ask us to stop ARISS operations –Teamwork minimizes overlap & maximizes volunteer support

Slide 3 What we Need We need to ensure, through processes and frameworks, that individuals can bring up new ideas early. We need to ensure that these ideas go through the committees and get approved or denied through the full set of international delegates. We need to ensure that these processes and frameworks catch this early enough, before individuals and organizations spend time and money We need to document the team roles and responsibilities and stick to them

Slide 4 Recent Examples Where Closer Coordination Could Have Helped (Page 1 of 3) US Examples Telebridge Station coordination –ARISS-USA assumed this exclusive role during SAREX and never modifed it Francescos concernUS/NASA proposal process Last minute postponement of Sergeys Technical Interchange Meeting at NASA JSC Europe Examples While successful, Ham TV could be even better if, early- on, design was internationally coordinated Canada Examples More international team collaboration beyond school operations

Slide 5 Recent Examples Where Closer Coordination Could Have Helped (Page 2 of 3) Russia Examples Russian MAI 75 SSTV experiment conflicted with the Greece school group contact, our first ever school contact conflict on ISS Closer coordination on development & installation of Kenwood D-710 Kenwood frequency reprogramming SSTV ops coordination would spread the word and improve educational benefit Japan Examples More international team collaboration beyond school operations

Slide 6 Recent Examples Where Closer Coordination Could Have Helped (Page 3 of 3) Overall Examples With station development complete, ISS crew members do not favor using equipment in other segments as they do not want to interfere with on-going work –Kenwood (Service Module) vs Ericsson (Columbus Module) –Concerns that crew member ham would be going into neighbors radio station, located in their bedroom, to make ARISS contacts Interoperable equipment across segments would improve coordination & could minimize school contact issues

Slide 7 Some Examples of Excellent International Cooperation Initial deployment of radio systems in service module Service module antennas AIS & ARISS VHF antennas L/S band antennas on Columbus S-Band beacon design HAM-TV Teleconference ARISS-I Teleconference School group mentoring Operations leadership

Slide 8 Actions to Improve Coordination Regular ARISS-I Face to Face meetings Revamp ARISS Terms of ReferencesAdministrative & Committeesand USE THEM Regular committee meetings by telecon and Goto Meeting –Excellent modelHam TV Telecon –Suggestions: School Selection, PS&U/Hardware planning, PR, Operations (outside weekly ops tagup) Committee face to face meetings, including ISS Ham Technical Interchange Meetings Fundraising Compile all existing agency agreements and work with agencies on new agreements, as needed Improve teamwork through international compromise