Edit this text for your title

Slides:



Advertisements
Similar presentations
________________________________________________________________ What price do you put on pump run rate and production efficiency on your horizontal wells?
Advertisements

September Wood to Warmth – Fuel Delivery and Storage Michael Beech TV Energy.
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Control calculations Heat Engines & Boilers.
Construction Surveys
Edit this text for your title
INTRODUCTION TO PRESSURE VESSELS
Introduction to Structural Design
Spring 2007 Dr. D. M. McStravick Rice University
Basic Refrigeration Cycle
Pipe Supports and Hangers
BEDRE GJENNOM KUNNSKAPSDELING SHARING TO BE BETTER CAKE Q2 LIFTING INCIDENT.
Advanced Flexure Design COMPOSITE BEAM THEORY SLIDES
Installation. Indoor Unit Installation Typical Installation.
WEDGES AND FRICTIONAL FORCES ON FLAT BELTS
ENG-1010 Lecture 16 Bridge Design.
The Evolution of a New Mooring System for Ultra-Deep Waters By Charles N. White Strategic Offshore Solutions – Houston Fall.
1 Westinghouse Non-Proprietary Class 3© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Structural Analysis of a Nuclear Fuel Handling Machine.
Bridge Engineering: Lessons from Rome to Tacoma
Crane Operations Objective
CTC 422 Design of Steel Structures
Design of Tension Members
Rolling element bearings A. Lozzi 2012
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Pipe Supports and Restraints
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
SHIP STRUCTURES Unique Structures (6.1) What are they optimized for?
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine operations Kværner ASA, UiO, Oct
Installation. Indoor Unit Installation Typical Installation.
PIPE FEA USING ANSYS.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
There are many types of bridges including:
Lecture on CE 4014 Design of Concrete Structures
Group N Chris Jones Ella Feekins Nikoline Hong
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. Planer for MEK 4450 Marine operasjoner Kværner ASA,
Installation. Indoor Unit Installation Typical Installation.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
BRIDGES Greenwood Lake Middle School TECHNOLOGY. History of Bridge DevelopmentHistory of Bridge Development How Bridges Work Basic Concepts Types of Bridges.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
POWER SAWS Two main categories of power saws: Portable & Stationary. Work is fed into a stationary saw. Saws that are fed into the work are portable. Smaller.
Introduction to Structural Design © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Architecture has recorded the great ideas of the.
WP F/L A mechanical design for a detection unit for a deep- sea neutrino telescope VLVnT11 - Edward Berbee - Nikhef.
One of the most important fields in engineering Mechanics.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, UiO,
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Session 15 – 16 SHEET PILE STRUCTURES
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Moment Connection Requires Bolts Outside the Flanges
INTRODUCTION SUPPORT STRUCTURSE FORCE - LONGITUDINAL FORCE - TRANSVERS
IN MODULAR CONSTRUCTIONS
Lecture 2: Ship structural components
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, Fall.
A View of NCSX Structural System and Load Path for the Base Support Structure.
Topic: Conveyor belt Name: Enrollment no.: Aftab Ajmeri Harsh Bhatt Akshay Bhut Paras Boricha Rathva.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
1 George Washington Bridge 本章简要介绍索的特性和分析方法,主要包括索的特征、 索内力的变化、重力(竖向荷载作用下索的分析、广义索定 理以及确定索状拱的方法。与桁架相比,索只能承受轴向拉 力,内力单一,但必须形成一定的曲线才能承受不与索轴重 合的荷载,使其构成和分析独具特色。将索变形限定在较小.
Structural Technology Foundations of Technology Standard 20: Students will develop an understanding of and be able to select and use construction technologies.
Building Construction
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
Bridges Mr. Ruddle.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Types of material handling equipment
SBN Far Detector Installation & Integration
OFFSHORE CONSTRUCTION
INTRODUCTION TO PRESSURE VESSELS
Introduction to Structural Design
Introduction to Structural Design
Engineering Technology Program
Bunker Wall Design Wall ESS
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Presentation transcript:

Edit this text for your title MEK 4450 Marine Operations Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2012

Installation of flexibles and cables Typical products Rigid pipes Flexible pipes Cables and umbilicals Installation and installation analyses Installation of end terminations Regular laying Special challenges: shallow water, deep water, slopes, turns etc Waiting on weather

Typical product categories Pipe Rigid Flexible Cable Electric Umbilicals Beam theory. Axial load Compression Bedning moment Courtesy: Nexans Courtesy: NKT Flexibles Courtesy: Bredero Shaw Courtesy: Nexans

Rigid pipe Large diameter High bending radius Heavy High laying tension High bending radius Large deck space Expensive equipment Some plastic deformation acceptable Straightening before over-boarding Avoid repeated plastic bending Thermal insulation (wax formation) Concrete weight layers (gas pipes) Courtesy: Bredero Shaw

Flexible pipes Low elastic bending radius Separate layers for Less expensive laying vessels / equipment More competition Separate layers for Axial load Outer pressure Inner pressure Courtesy: NKT Flexibles

Cables Power cables and umbilicals Smaller bending radius, lower unit weight Less expensive vessels / equipment High density Heavy load on a fully loaded vessel Structural capacity and vessel stability Limited plastic bending Courtesy: Nexans

Theory slide. Installation aids Flexible products are installed with various types of vessels with equipment for storage and controlled over-boarding of the products. Typically, the installation of rigid steel pipes requires bigger and more expensive vessels due to the large space and high tension capacity required during deck handling and installation. In the following slides some typical examples are given. The first example shows a laying vessels for electrical cables, where the cables are stored in a horizontal carousel. A horizontal tensioner is used that carries the weight of the cable during laying. The chute over the side of the vessel provides support and prevents damage to the cable as it is over-boarded. We notice that the vessel is equipped with a big crane and a large open deck space. This means that the vessel may be used for other types of marine operations such as installation of subsea modules. Separate slides display the installation equipment used by this vessel. We notice the belt with the orange pads forming the tensioner. The pads are pushed toward the cable to ensure sufficient friction. By running the belt the cable may be pulled in or out. The other slide shows the chute. The next slide shows an alternative configuration, where the cable is routed via a vertical laying tower during installation. The tensioners are vertically mounted in the laying tower. The third slide shows a vessel for installation of small diameter rigid pipe (typically < 12” or 16”). Steel pipes are spooled (and deformed plastically) on the large vertical drum in the center of the vessel and installed over a lay ramp. The ramp may be tilted, typically to support a pipe lay angle of 30-60 degrees. A tensioner that supports pipe lay tension is positioned on the lay ramp, while the reel ensures back-tension. The lay ramp also includes a straightener and a welding/x-ray station. The next two slides show installation vessels with stingers, typically used for installation of large diameter rigid pipes (> 16” or 20”). Pipe sections (typically 12 m long) are continuously welded to the pipe string during laying. The large stinger at the stern of the vessel ensures that the pipe is not plastically deformed as straightening is not possible. The last slide displays a typical J-lay vessel for installation of large diameter rigid pipe in deep water. Pipe segments are lifted into the vertical “J-lay tower” by use of specialized cranes, and then welded to the pipe string during laying.

Typical installation vessels Installation vessel with horizontal tensioner and chute Installation vessel with lay tower Pipe lay vessel with reel and lay ramp Pipe lay vessel with stinger DP vessel Anchor vessel Pipe lay vessel with J-lay tower

Installation vessel with horizontal tensioner and chute Aker Connector

Tensioner / Caterpillar Used to pay in / out product, and to maintain/ support cable tension Belts with pads press against the product Sufficient force to Pull in and overcome friction over chute Support maximum cable tension (e.g. storm) High tension + low radial load capacity => long tensioner / many pads Internal friction in the cable may be lower than friction between cable and pads!

Chute Cable installation Provides continuous support Introduces vessel heading restrictions At maximum design tension Chute structural capacity Product integrity (bending + tension) Over-bending at tip of chute (top angle from analyses)

Installation vessel with lay tower Seven Seas Scandi Neptune Pertinacia

Pipe lay vessel with reel and lay ramp

Pipe lay vessel with stinger

Stinger Provides support for pipes Rollers to reduce friction (=> point loads) Stinger radius above elastic bending radius of pipe Departure angle high enough to prevent over-bending Avoid lift-up of pipe in stinger Will impact vessel motion characteristics NOTE: picture shows stinger in elevated, not operational mode

Pipe lay vessel with J-lay tower Pipe sections raised into vertical Vertical welding of pipe sections Pipe tension supported by clamps

Installation analyses Establish weather criteria and a plan for laying (laying tables) Ensure robust and safe operations for personnel, equipment and flexible product Low tension: over bending, axial compression, loop formation High tension: rupture, tensioner capacity, free spans Ensure that all tolerances are accounted for Determine and verify survival conditions

Installation analyses Shore landing Pull-in to shore Shallow lay

Installation analyses Uphill vs downhill lay Downhill lay More flexible catenary (reduced risk of cable over-bending/compression) May cause high seabed tension and free spans Uphill lay Less flexible catenary (due to geometry) => reduced weather criteria Risk of cable sliding downhill

Installation analyses Laying in steep slopes Difficulty in assessing where actual touchdown point is => step-by-step analyses as input to operational procedures

Installation analyses General considerations (analyses) Deep water High top tension, tensioner capacity Combined tension and bending at vessel interface Curve lay Sliding of product Low lay tension (risk of over-bending/compression) Possible solution: Laying around preinstalled piles etc

Installation analyses Installation of buoyancy elements Step-by step analyses to Determine vessel movements vs. pay-out of pipe/cable Establish procedure for attachment/lowering of clump weight Main challenges Over-bending/compression at vessel interface due to buoyancy

Installation analyses Pull-in to platform Step-by step analyses to Determine lowering of pipe/cable from vessel vs pull-in to platform Main challenges Vessel positioning (available space) Seabed clearance Over-bending at I-tube inlet

Survival condition Cutting of product More critical for power cables and umbilicals Installation of buoyancy elements Establish flexible ”S”- shaped configuration Step by step analysis to ensure product capacity while over boarding buoyancy Analysis gives guidance in when to pay in / pay out after installation Analyses: can the vessel maintain heading and position?