EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Hazards Of Electricity
Electrical Safety 1926 Subpart K ‑ Electrical
Presented by: Guy Prescott Common Sense Safety, Inc. (530)
Basic safety rules and procedures for controlling hazardous energy
Call Before you dig Safe digging is no accident. Alberta Damage Prevention Council.
MABAS Division 10 - Com Ed Program1 Electrical Safety Reference: The Power of Training Electrical Safety Commonwealth Edison Company.
Electrical Safety 29 CFR I. Background for the Trainer:
Two-mode Safety and Battery System Service
ELECTRICAL SAFETY-RELATED WORK PRACTICES Qualified Persons Those people that have training in avoiding electrical hazards while working on or near exposed.
OSHA Office of Training and Education
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Proper Use of Extension Cords Proper Use and Electrical Hazard Awareness for Extension Cord Users Module 2.
Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck.
| Part 1: Background About Georgia 811 Georgia Dig Law Notification requirements Penalties Hours of operation Positive Response.
Module 4: Overhead and Underground Power Lines. Overview of Module 4 Background on power lines Hazards of overhead and underground power lines Injury.
Qualified Electrical Worker
LABORATORY ELECTRICAL SAFETY Discussion topics: Electrical shock hazards Identifying hazards Research apparatus/ systems Proper emergency procedures Electricalfor.
Construction Hazards Safety Training Presentations Institute of Occupational Safety and Health.
Electrical Safety 29 CFR Concerned About Electricity? How many sets of Christmas lights do you plug into one extension cord? Do you still use.
Hazard - Inadequate Wiring
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
BUILDING TRADE SAFETY ELECTRICAL SAFETY.
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
Establishing an Electrically Safe Work Condition May is Electrical Safety Month Training A product of the EFCOG Electrical Safety Task Group.
Electrical Safety INSTRUCTOR’S NOTES:
Electrical Safety. Defective Insulation To protect you, electrical wires are insulated by a plastic.
Copyright  Business & Legal Reports, Inc. Electrical Safety 29 CFR BLR’s Safety Training Presentations.
Electrical Safety INSTRUCTOR’S NOTES:
Safety in the numbers Working Safely Around Pipelines Dig Safe BC! Workshop: March 2010.
Safety Inspections & Hazard Recognition. Importance of Jobsite Safety Inspections Jobsite Inspections are a method of evaluating the implementation and.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Copyright  Progressive Business Publications Electrical Safety.
Electricity.
Unit 4: General Safety Practices
Proper Use of Extension Cords
Nearmiss Presentation
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Electrical Safety, Subpart K
Safety Talk 21 / 1 Safety Talk 21 Cranes and their Safe Operation.
MNM Fatal Electrical Electrical October 16, 2004 (Missouri) October 16, 2004 (Missouri) Crushed Stone Operation Crushed Stone Operation Laborer.
Core Drilling into an Energized 13.2 kv Manhole Near Miss Los Alamos National Laboratory, TA-55 Plutonium Facility Presented by Dan Carter, Facility Representative.
Working On or Near Energized Conductors and FR Clothing.
Working Safely Near Power Lines NOVA SCOTIA ASPHALT USER PRODUCER ASSOCIATION.
Chicago Area Facilities (CAF) Ground Disturbance and Excavation Procedure.
Excavation & Trenching Awareness Plus
Contractor Utility Coordination WisDOT Projects February 18 th, 2016.
Global Marketing © Chevron 2009 Rev. 1 Electrical Safety Awareness Plus.
Overhead and Underground Power Line Safety 1 Quentin Baker Director of Safety
Site Safety.
Objectives Upon completion of this module you should be able to:
Leica Detection UK Detecting and Avoiding Buring Services for
Electrical Safety Equipment
Qualified Electrical Worker
Michigan’s Utility Notification
Personal Protective Equipment
Cutting an In-Line Dead-end Single Phase
Murray State University
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Emergency Action Plans
Line Clearance Tree Trimming Operations
C3 Insulator Changeout With Hoists
Cutting an In-Line Dead-end Single Phase
Cutting an In-Line Dead-end Single Phase
Protective Grounding Single Phase Tangent
Presentation transcript:

EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5

EFCOG Electrical Improvement Project These tools must be used with care!

EFCOG Electrical Improvement Project Serious Injury at DOE Site when 13.2kV Cable Struck A laborer was burned and rendered unconscious when his jackhammer hit a buried 13,200 volt electrical power cable.

EFCOG Electrical Improvement Project Typical Tasks That Expose Personnel to Underground Power Lines Construction site excavation Jack-hammering Well drilling Landscaping Trenching for piping Fence installation

EFCOG Electrical Improvement Project Excavation Program Elements Designate a Competent Person to oversee all excavation jobs and train to understand the electrical hazard Use written excavation procedure and excavation permit Require an excavation/trenching checklist to be used in job planning Require non-intrusive surveys of areas and develop an interference map of area Ensure excavation planning requirements flow down to subcontractors

EFCOG Electrical Improvement Project Electrical Hazard Identification Perform detailed drawing and map review including original site drawings and recent project drawings Understand that drawings and maps, however, may not be up to date or indicate all field routings correctly Perform walk-down of site surrounding the excavation area and look for conduits and raceways that extend underground and could cross into the excavation work zone Discuss excavation area with facility site knowledge Look for new asphalt, manholes not marked on prints or disturbed soil to identify potential for unmarked interferences

EFCOG Electrical Improvement Project Field Investigation Perform non-intrusive surveys of excavation area using trained and certified utility locators Mark surface with interferences and verify immediately prior to start of excavation Know limitations of non-intrusive equipment –GPR has been off target by 3 feet and may not identify some interferences –Voltage proximity detectors are shielded by ground wire or conduit –Current proximity detectors will not detect if electrical load is turned off

EFCOG Electrical Improvement Project Identifying Interferences De-energize and lockout known electrical hazards-Dont let schedule and convenience take precedent. Hand excavate interferences within excavation limits –Look for different types of soil in the excavation area or for colored concrete that may indicate presence of underground electrical line Consider use of vacuum excavation technology for uncovering interferences Use caution when hand digging-even shovels and post hole diggers can damage direct burial cables

EFCOG Electrical Improvement Project Identifying Interferences Use appropriate PPE (voltage rated gloves and footwear) when identifying electrical interferences –PPE is important since detection of hidden utilities can not always be guaranteed Use double-insulated electrical tools Use fiberglass-insulated shovels and picks when excavating by hand Use rubber mats as appropriate

EFCOG Electrical Improvement Project Other Safe Practices Stop work and call a time out if an unidentified obstruction is found during excavation Revise maps and drawings to reflect actual found field conditions before closing excavation permit Consider use of electronic drill stops when drilling in concrete (DOE Electrical Safety Handbook Section 11) Observe all Power Line Right of Ways and notify power company prior to excavation

EFCOG Electrical Improvement Project Conclusion Remember, you can avoid the pain and suffering that can happen when you contact an underground energized electrical power line Implement and follow the practices in this module Stop work when in doubt