Current Necessary for CMN Problem

Slides:



Advertisements
Similar presentations
US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
Advertisements

MEG Review at Brookhaven, Feb 5, 2004 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
MEG Review at BNL, Jan. 18, 2006 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
Slide 1PMG Jan CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues Perspective from a large scale production project Anthony Affolder.
US CMS Silicon Tracker : Overview J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
US CMS Si Tracker Project presentation to the Program Management Group at Fermilab; 22 October 2004, J. Incandela (UCSB) 1 US CMS Silicon Tracker Project.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Comprehensive Review June 28,
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
MEG Review at FNAL, Jan. 28, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
DOE, July 23, 2003, R. Demina1 DØ and CMS physics program Regina Demina July 23, 2003.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Annual Review June 15, 2004.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Electrical Testing at UCSB: Hybrids, Modules, & Rods Anthony Affolder On.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
CMS at UCSB Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara Status and schedule CMS Weekly Meeting Fermilab May 14, 2004.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the illustrious and colorful TOB Group Tracker General Meeting.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 1 UCSB in CMS.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager DOE/NSF Review of CMS Detector.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 1 UC Riverside Testing Facilities Patrick Gartung University of California, Riverside.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Joe Incandela University of California Santa Barbara DOE Site Visit Jan 17, 2008 Joe Incandela University of California Santa Barbara DOE Site Visit Jan.
CMS Module Testing & Quality Assurance
APV Lectures APV FE Basic Building Blocks How Our Testing Works
On behalf of the US TOB testing group
Update of US Testing Status
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Review of CMN Problem/Studies
CMS Module Testing Issues
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
Unexpected Failures of Modules on Rods
Recent TOB Developments
Module Failures on RODs
Module Failures on RODs
On behalf of the US TOB testing group
US Testing Mailing List
US Testing Update Anthony Affolder (On behalf of the US testing group)
The measurement set-up
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Hybrid Status/Deliveries
Sensor probing (Summary)
Modules Produced With Low Rint Sensors
BEAN!.
Electrical Testing at UCSB: Hybrids & Modules
Noise in TOB modules and sensor quality
Production Status 39 modules produced
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Is Increased Bias Current and CMN Correlated?
Wirebonding UCSB FNAL Machines
Recent TOB Developments
Recent TOB Developments
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Presentation transcript:

Current Necessary for CMN Problem A small increase in bias current may cause CMN problem For CMN modules built prior to re-probing, the difference between the module current and sum of the QTC sensor measurement used as the DI of sensor

New Combination Results Added 98 sensors from UR reprobing (2001-2002) Added 93 sensors from UCSB reprobing (2003) Waiting on FNAL info Sensor Quarter Number Tested >1.5 mA >5 mA % >1.5 mA % >5 mA 2001-4 140 17 14 12.1% 10.0% 2002-1 202 19 15 9.4% 7.4% 2002-2 156 9.6% 9.0% 2002-3 49 3 6.1% 0.0% 2002-4 41 1 7.3% 2.4% 2003-1 86 6 7.0% 3.5% 2003-2 95 2 3.2% 2.1% 2003-3 20

Fit to Rate of Change R(t)=A*(1-exp(-t/B)) A=0.125 B=1.5 Years

US Testing Mailing List USCMS-SILICON-TESTING@fnal.gov UC-Riverside Gale Hanson Patrick Gartung UCSB Joe Incandela Claudio Campagnari Anthony Affolder Russell Taylor Jim Lamb Brad Patterson Sam Burke Derek Barge Chris McGuinness Lance Simms UIC Elizabeta Chabalina Timour Ten KU Alice Bean Don Coppage Len Chistofek FNAL Lenny Spiegel Nicola Bacchetta Slawek Tkaczyk Anatoly Ronzhin Kenan Sogut UR Paul Tipton Regina Demina Sergey Korjenevski Ricardo Eusebi Thomas Ferbel Elisabeth Groves