Ang Tide Right Vessel for Complex Diving Operations.

Slides:



Advertisements
Similar presentations
John A. Orcutt Deputy Director, SIO Ocean Observations Initiative NSF MREFC Chair, NSF/CORE DEOS Comm.
Advertisements

Evolution of Optical Fibre Types and Cables
Draw and Label the Parts of a Wave
Company Profile 1.
2012 Desert Hills PolyPatch Fiber Optic Cable Installation Desert Hills, Carefree Arizona Cable Trench Sealing and Waterproofing With PolyPatch.
Gas Meter Proximity to Electrical Equipment, Apparatus and Cables. To be applied by PNG Sales, Engineering and Installation operatives when locating 6m3/hr.
Tonga Cable Submarine Fiber Optic Cable System
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
Review of Underwater Vehicles Module 1, Section 1.
Windows IT Pro magazine Datacenter solution with lower infrastructure costs and OPEX savings from increased operational efficiencies. Datacenter.
Symon PerrimanSenior Technical Evangelist Kenon OwensSenior Product Marketing Manager.
PGS Introduction "Value Series" : Best VALUE gaming cases with the highest C/P Ratio (Cost to Performance ratio). "Professional Series – Red label" :
Antoine Lecroart Alcatel-Lucent
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Presentation to 2007 Tidal Energy Conference Ketchikan, AK January 24, 2007 Providing Diversity for Alaska’s Energy Future A New Source of Emission-Free.
Load the Crimp into the jaws of the Crimper/Tensioner instrument.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
OSHA Office of Training and Education1 Excavations – Subpart P.
BCT 104 Construction Math Stair Calculations. Stair Codes Important Residential Stair Codes 1. The maximum stair riser is 8". The minimum is 4". 2. The.
Extreme Environments The Atlantic Ocean By: Katrina Ting.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Experimenting with Buoyancy Buoyancy (boy-an-see) is the upward force that a liquid exerts on an object. If the downward force (weight) of the object.
Basic Coring Device: Components: Head Tube Cable Piston The Head attaches to the top of the tube. The piston is inside the tube and attaches to the cable.
Presented by:- SWAPNIL S. CHILLE TE-Mechanical Exam no:-
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Opportunities to Innovate in Aquaculture with Composite Materials Presentation at 1 st Annual Maine Aquaculture R&D Forum January 14, 2015 Stephen Von.
Pipeline Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 Introduction MCS Pipeline Commander is an application.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Aquatic Renewable Energy Technologies (Aqua-RET) 2 Workshop Vocational Training in Marine Renewable Energy Technologies 3 rd International Conference on.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
Barry's Advanced Construction of Buildings, Second Edition, by Stephen Emmitt and Christopher A. Gorse. © 2006, 2010 by Stephen Emmitt and Christopher.
Rapid Prototyping & Model Making within the Oil & Gas/Subsea/Energy Sectors.
Labeled Test-site of the European projects ESONET & EMSO Dr. Juanjo Dañobeitia UTM – CSIC & SARTI (UPC) SPAIN.
By Melissa Glaser (amended by S. Mercier).  Henry Fleuss invents a self contained underwater breathing unit.  Yves Le Prieur releases a.
T +44 (0) W insensys Intelligent Sensing Solutions LIFE OF FIELD INTEGRITY MONITORING FOR SUBSEA ASSETS Lenny Sutherland Director,
1 Marine Biology Chapter 1. 2 Why We Study The Ocean Scientists study and try conserve the ocean for several reasons. Some are positive and some negative.
June 2011_ M. DEL BRENNAProperty of Prysmian SUBMARINE CABLE INSTALLATION Data required for effective design 13° Meeting of Marine Observation and Data.
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
What does this… have to do with this? Diffusion Human Body.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
An Overview of the Technology and Economics of Offshore Wind Farms
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Outside Plant Fiber Optics
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Installation of the T600 at Fermilab CSN2, September 22,
OSHA Office of Training and Education
1 Figure 2-6: Building Security Building Security Basics  Single point of (normal) entry to building  Fire doors, etc.: use closed-circuit television.
Undersea cables and cable maintenance in the Mediterranean Sea
JIFMAR YOUR PARTNER FOR SOLVING MARINE PROBLEMS ONE STOP SOLUTION.
Company Presentation. Join the discussion on LinkedIn: Follow DeepOcean Group on
Excavation & Trench Safety
KM3NeT deployment aspects Transportation – Deployment – Connection - Calibration Spyridon Koutsoukos.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
Marseille 30 Dec ’13 KM3NET Marine Operations Catania - Status Klaus Leismüller.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
1. Okeanos -word ocean derived from oceanus. 1. Okeanos -word ocean derived from oceanus.
OFFSHORE CONSTRUCTION
Detector hall in mountain regions
How to use DCIEM dive tables
The cost for conduit or cable tray is NOT included
SUBMERSIBLES With Robert Ballard Deep floor exploration.

Submersibles and Sonar
Pressure in a liquid low pressure high pressure
Detector hall in mountain regions
Robotic Vessels ROVs (robotically operated vehicles) help explore areas too difficult for man to reach For example: trenches, deep water Un-manned underwater.
Second Meeting of the Material Budget & Engineering Working Group
Presentation transcript:

Ang Tide Right Vessel for Complex Diving Operations

Right Vessel - Right Time Configured for Multi-Purpose Diving Ops –Close In Around the Clock Platform Operations Submarine Cable Installation –Cable Lay Survey & Monitoring –Riser Assembly & Construction Trenching Operations –Diver Hand Held Trenching Capability –Deep Power Trenching ROV Operations –Mini-Survey Operations –Cable Lay In Trench Assessment

No Off Shore Complex too Tight Superb DP2 Positioning – Diving Operation, In, Under & Over – 24 Hr Operations – 26 Divers on Multiple Shifts – Three Decompression Chambers – 12 Helium Bottle Assembly – 12 Oxygen Bottle Assembly

Trenching / Mat Laying Operations –Monitor Cable –Pipe Line Depth –Pipe Line Crossings –Bottom Mat Lay Downs –Cable Uroduct Application – Top Mat Lay Downs

Extreme In Close Support Close In Positioning Allowing Diving Operation Penetration Any Where a Diver Needs to Go

Submarine Cable Operations Power & Fiber Optics Extensive Experience in: Submarine Cable Laying Riser Construction Platform Termination Complex Infrastructure Pipe Crossing Protection Mat Positioning & Uroduct Protection

And Occasional Toast

Pattarozzi Tide Dp Work Horse