Operationalization of a Public Works AM Strategy

Slides:



Advertisements
Similar presentations
Managing Risk: A Framework and Reporting Cycle 2014.
Advertisements

An S-IAM Application ‘Road-maps’ and Observations towards Capacity Building By Nigel Lowe DBSA Technical Analyst Tel
October In May 2000, Walkerton’s drinking water system became contaminated with deadly bacteria, primarily Escherichia coli O157:H7.1 Seven people.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
London Streets...The Way Ahead Garrett Emmerson Chief Operating Officer: London Streets.
ITIL: Service Transition
UK WIR The UK Experience Christopher Royce Anglian Water Services.
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Aust. AM Collaborative Group (AAMCOG) An introduction to ISO “What to do” guide 20th October 2014.
Enterprise Risk Management in DHHS
Chapter 1 Infrastructure Management System. Managers and engineers need clear guidelines for life- cycle management of infrastructure systems for water,
© 2015 Water Research Foundation. ALL RIGHTS RESERVED. © 2015 Water Research Foundation. ALL RIGHTS RESERVED. No part of this presentation may be copied,
Ohio Transportation Planning Conference July 16, 2014.
Chapter © 2009 Pearson Education, Inc. Publishing as Prentice Hall.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Overview Asset Management (AM) is a systematic process of operating, maintaining, upgrading and disposing of assets cost- effectively while maintaining.
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel, Sligo, 3 rd. September 2015.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
AWWA Leadership Forum Learning Session: What is Asset Management? November 10, 2015.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Governance for SMEs Nigeria
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Asset Degradation Modelling at Townsville Water
Asset Management in the Arab Region and its Role in Improved Performance and Utility Efficiency Lina Sheqem Cowater International.
JMFIP Financial Management Conference
Procurement Development Programs
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Lecture (11): Water Distribution Systems
ITIL: Service Transition
Danube Water Conference 2017, Vienna
Ensuring Value for Money Asset Management Project at American Samoa Power Authority By William Spitzenberg (ASPA) and Richard Taylor (Thomas Civil.
An Overview on Risk Management
Level of Service and Risk: What’s the Connection?
ISO 14001: 2004 Environmental Management Review Presentation
Overview of the CoJ Water & Sanitation Master Plan
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
City of Vaughan | Corporate Asset Management Strategy
Preventing Medical Device Recalls
Duffin Creek WPCP Optimized Renewal Planning & Decision-Making
100% Exam Passing Guarantee & Money Back Assurance
WaterRF Workshop on EUM Benchmarking
Municipal Association of Victoria Rate Cap Forum 25th November 2015
KEYNOTE STAGE SPONSOR.
Project Risk Management
Asset Governance – Integrated Strategic Asset Management
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
Across the entire value chain
AWWA Leadership Forum ASSET MANAGEMENT November 14, 2017.
Historical problems Tasks being done; just not coordinated and effective. No clear line of sight to client (Highways England) objectives. No defined asset.
Using Risk to Help Define Your Capital Plan
Municipal Association of Victoria Rate Cap Forum 25th November 2015
Managing Assets vs. Asset Management The City of Calgary’s Approach Steve Wyton, P.Eng., MBA, FIAM Manager, Corporate Project & Asset Management.
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Cybersecurity ATD technical
Challenges and Innovations in Municipal Asset Management Presented by: Bhupesh Sakalley, Project Manager Zimran Khokhar, Project Manager February 7th,
Linking AMPs to Short-Term and Long-Term Investment Plans
Project Risk Management
One City, One Voice, a Few Pumps and Lots of Fire Stations
Vikki Kwan TransLink’s CAPITAL-M Program
Strategic Decision Making And Resiliency
KEY INITIATIVE Shared Services Function Management
Internal controls Project support overview.
Impact of quality on day-to-day efforts of PHC
Presentation transcript:

Operationalization of a Public Works AM Strategy Pious Maposa Senior Advisor – Asset Management, Halton Region Pious.Maposa@halton.ca Dan Olsen CH2M, AM Consultant Daniel.Olsen@ch2m.com

Presentation Objectives Understand how we developed a line of sight between AM objectives and the 2018 capital plan Understand our approach to fostering a culture of AM across the organisation

Our Customers The Public Works department is responsible for delivering water, wastewater, waste, and road services to approx. 530,000 customers across 4 municipalities Describe the customers and the system (i.e. assets)

Our Assets To delivery services to customers, Halton Region owns and operates: Water Wastewater Roads Waste 12 water purification plants 15 booster stations 22 reservoirs 2,218 km of water main 7 wastewater treatment plants 88 pump stations 1,806 km of sewer main 1,013 lane km of roads 225 bridges and major culverts 1 open landfill 11 closed landfills Describe the customers and the system (i.e. assets)

Our AM Strategy Framework

Building the Line of Sight

Line of Sight Monitor Customer LOS Monitor Technical LOS Update 10-year Capital Plan Update Life Cycle Models (LCMs) Perform Risk Assessment

Line of Sight Monitor Customer LOS Monitor Technical LOS Technical LOS used as early warning mechanism for customers impacts Monitor Technical LOS Update 10-year Capital Plan Update Life Cycle Models (LCMs) Perform Risk Assessment

Levels of Service (LOS) Customer LOS objectives were developed for each service area that aligned to 8 customer values: Availability Cost Effectiveness Reliability Responsiveness Safety Suitability Sustainability Technical LOS key performance indicators were selected that measure asset and operational factors needed to achieve each customer objective.

Levels of Service (LOS) – Water Example % of trunk mains that have system redundancy or emergency SOP # of hours of treated water storage capacity at average summer day demand # of main breaks/100km # of inoperable or leaking critical valves Reliability (e.g. unplanned service interruptions are minor) Asset factors Operational factors % compliance with valve preventative maintenance program of critical valves % compliance with Condition Needs Assessment Plan

Line of Sight Monitor Customer LOS Monitor Technical LOS Technical LOS used as early warning mechanism for customers impacts Monitor Technical LOS Technical LOS data used as input for LCMs Update 10-year Capital Plan Update Life Cycle Models (LCMs) Perform Risk Assessment

Lifecycle Management 8 Life cycle models were developed for different asset types across the four service areas. Life cycle models used to forecast long-term asset renewal needs to maintain service to customers.

Lifecycle Management – Water Example Water mains - based on historical break data and a target # of breaks per 100km per year, statistical model was developed.

Line of Sight Monitor Customer LOS Monitor Technical LOS Technical LOS used as early warning mechanism for customers impacts Monitor Technical LOS Technical LOS data used as input for LCMs Update 10-year Capital Plan Update Life Cycle Models (LCMs) LCM used to identify asset issues for Risk Assessment Perform Risk Assessment

Asset Risk Management Consequence of Failure on Customers Customer LOS Attributes include: Cost Effectiveness Safety Availability/Reliability Suitability Sustainability Responsiveness Consequence Categories include: Cost Health & Safety Availability/Reliability Legislation Environment Technical LOS Likelihood of Asset Failure Factors include: Asset factors Operational factors Root causes of failure include: Asset factors – e.g. main breaks Operational factors – e.g. inadequate preventative maintenance

Asset Risk Management – Water Example Failure Mode break in a 350mm DI main under a major highway. Consequences Cost - Highway could wash out which would have significant repair costs and traffic diversion. Availability/Reliability - Loss of supply to 500 properties and service would be out for 2 months. Some redundancy in system. Safety - 407 has high volume so potential for serious injury. Likelihood 50 year old pipe, no recorded breaks, moderate likelihood

Line of Sight Monitor Customer LOS Monitor Technical LOS Technical LOS used as early warning mechanism for customers impacts Monitor Technical LOS Technical LOS data used as input for LCMs Capital Plans are validated by monitoring Technical and Customer LOS LCM informs Years 5 to 10 of plan Update 10-year Capital Plan Update Life Cycle Models (LCMs) Asset issues that have highest risk (based on likelihood of asset failure and consequences to customers) are prioritized in Years 1 to 4 of plan LCM used to identify asset issues for Risk Assessment Perform Risk Assessment

Results - 2018 Capital Plan

Fostering an AM Culture in Halton

AM System - Stakeholders I want a capital plan with no surprises. Finance I want planners and management to listen to my concerns about the asset base. O&M Stake-holders Senior Mngt. I want to be confident in the decisions being made on assets. I want the AM processes to not create additional work for me and that will add value to me role. Asset Planners

Steps Taken to Gain Internal Stakeholder Buy-In Build Team Assembled an AM Team, comprised of champions within each internal stakeholder group Train Conducted an AM training session to create common language around AM Develop Developed the Tools/Processes with the Team Implement Implemented the Tools/Process to develop the 2018 capital plan Sustain Embedded the Tools/Framework within Halton

Stakeholder Buy-in Finance O&M Stake-holders Senior Mngt. I now see how the AM processes can enhance the transparency of the capital plan and manage unknowns. I now see how the risk process will enable my voice to be heard and my concerns to be documented. Finance O&M Stake-holders Senior Mngt. I now see how I can align my current approach to the AM system to enable better decision making without additional work. I now see how the risk process can be a strong tool to support my decision making. Asset Planners

Look Ahead

Look Ahead Sustain existing momentum Continue to develop components of the AM Framework Optimized Decision Making Asset Information Strategy

Questions? Contact Us: Pious Maposa Senior Advisor – Asset Management, Halton Region Pious.Maposa@halton.ca Dan Olsen CH2M, AM Consultant Daniel.Olsen@ch2m.com