DELPHI Packard Electric Systems Metri-pack Cable Seal Processing Change Background: DPES is continuing to transition the application of cable seals on.

Slides:



Advertisements
Similar presentations
Toll-Free Component Relationships Resp Orgs 33 Resp Orgs 22 Resp Org 11 Carrier ACarrier BCarrier DCarrier C SMS 800SMS 800 Help Desk Toll-Free Customer.
Advertisements

UNITED NATIONS Konstantin Glukhenkiy TIR Secretary United Nations Economic Commission for Europe Regional TIR Seminar (Tunis, 3 and 4 June 2009) Secure.
© Paradigm Publishing, Inc Access 2010 Level 1 Unit 1Creating Tables and Queries Chapter 2Creating Relationships between Tables.
Writing a Method Section
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
NDDOT/LTAP Assistance Conference Mandan, North Dakota November 30, 2011.
MIS 2000 Class 20 System Development Process Updated 2014.
© 2014 wheresjenny.com Dock management DOCK MANAGEMENT.
IEC Substation Configuration Language and Its Impact on the Engineering of Distribution Substation Systems Notes Dr. Alexander Apostolov.
Replacing Arch Beams: Your Plant’s Safety Depends On It!
MAE 552 Heuristic Optimization Instructor: John Eddy Lecture #16 3/1/02 Taguchi’s Orthogonal Arrays.
Sell More TWS AutoSys to TWS Conversion Service
Activity 82 Braking Distance
SQA Architecture Software Quality.
CS405 Systems Development Life Cycle 1. Traditional Project Phases Wild Enthusiasm Growing Concern Mounting Terror Resigned Fatalism Persecution of the.
David Warne Independent Manufacturing Consultant.
Project co- financed by Asean European Committee for Standardization Implementing Agency Project co-financed by European Union Module 7 GMP Workshop Kuala.
North American Automotive Original Equipment (OE) Wire Harness and Connector Markets Focus on Product Innovation Essential for Industry Winners "Wire harnesses.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Systems Life Cycle A summary of what needs to be done.
An Introduction to AlarmInsight
MethodGXP The Solution for the Confusion.
SQA Architecture Software Quality By: MSMZ.
Workshop: Measurement Points and Permits
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
Detail and Assembly Drawing
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
BondChem TECHNICAL DATA Roll-a-crete ( Three Component Cementitious Waterproof Coating ) Page 1 / 2. DESCRIPTION BondChem’s Roll-a-crete is a three component.
Injectable Packing Injectable packing is not a new concept, however Utex has developed a new means of containment that has revolutionized injectable packing.
Unclassified U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Reverse Engineering Re-defined Requirements TARDEC 25 AUG Presented.
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
What does it mean? What is it used for? S. Greubel.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
WYMAN GORDON ROCHESTER INSTITUTE OF TECHNOLOGY Multi-Disciplinary Senior Design Team Nick Perrotte (ME)Lead Mechanical Engineer John Knight (ME)Project.
Chapter – 9 Checkpoints of the process
Unit 201: Health and safety in building services engineering
LESSON 4 COMPUTER MAINTENANCE BY: Morgan Bradley.
Copyright 2010, The World Bank Group. All Rights Reserved. International trade statistics Demarcation, principles and methods, 1 1 Business Statistics.
CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.
API 18LCM (Life Cycle Management) Report back to SC17 August 27, 2015 Review Team: Dave Wilkinson, John Strut, Smarty John, David Saul, Peter Moles.
Business to Business Customers, Marketing and Environment
1 Criteria for a Successful FMEA Design & Process.
XMA Connector Purpose: Objectives: Content:
TURN YOUR POWERPOINT INTO A MOVIE USING PHOTOSTORY.
Requirements Engineering Requirements Validation and Management Lecture-24.
INTELLIGENT NETWORKS YOUR COMMUNITY OUR COMMITMENT.
 Today's vehicles are much more complex and complicated than the cars of the 1960s, '70s, '80s, incorporating more computer electronics, silicon chips,
Supplier Corrective Action Request (SCAR) Supplier Training
Competitive Advantages. Every Auto Door Project Should Use LazerPoint RF™ Wireless Example Cost to Install 2 Wired Switches (Surface Mount) Equipment:
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
Using the My EBSCOhost Folder Tutorial support.ebsco.com.
GRRF Ad-Hoc Working Group
Lean Manufacturing Series
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
Global Core List survey materials for regional PPP updates
BUSINESS PROCESSES MAP
(Additional materials)
ISCOM 383 Education for Service- -tutorialrank.com
The Advantages of a Flat Cable
Technip USA – Prophix story
Basic Electrical Circuits
NPA 450/579 (Area Code) Relief in Quebec
NPA 403/587/780/825 (Area Code) Relief in Alberta
IPP Reprint Password Use Cases
Legal Issues Facing Start-Ups
QMS Deployment Kickoff Meeting
ELECTRICAL DISCHARGE MACHINING Special Process Instruction
Custom Switch and Value Added Capabilities
Workshop: Equipment June 29, 2006.
Presentation transcript:

DELPHI Packard Electric Systems Metri-pack Cable Seal Processing Change Background: DPES is continuing to transition the application of cable seals on automatic wire processing equipment from Mylar strip to loose piece application. This processing change eliminates the need for the non-value add Mylar carrier strip. Same exact product design as exists today, but needed to incorporate non-functional changes in order to process by loose piece application. The new seals are Design validated and Product validation will be complete by about 11/30/00. Controls are in place such that implementation of new seals cannot proceed until Product validation is complete. Lowered silicone oil content from 4% to 2%, to be consistent with the industry standard. DPES originally increased oil content in order to improve the process for loading seals to the Mylar strip. Addition of a textured surface to the flat (rear) end of the seal to prevent sticking in the Loose Piece Seal Applicators. This surface is a non-sealing surface and does not affect fit or function. Is this type of seal processing change something new to DPES? No In 1999, DPES started the transition of the GT connection system cable seals from Mylar to loose piece application. DPES is simply continuing this transition with other DPES seals that are currently on Mylar. Globally, Delphi-Europe and other DPES operations have been processing by loose piece application for more than 5 years. Competitors also utilize loose piece seals. New part numbers have been created for the loose piece application seals for the control of internal DPES processing.

Recommendation: Approve Delphi-P Component level PTRs to allow this transition in seal processing to proceed. Per the responsible Component Engineer, this is a Zero risk change at the vehicle level. Note: The 1999 GT seal transition to loose piece has presented Zero problems or concerns. The same exact transition is planned for the Metri-pack seals. PTR Numbers: 2174 through There are 22 PTRs, one for each seal part number. DPES needs the support from ALL of its customers for this transition to occur along with the seal part number changes. Where the Design Record is 3D: No customer EWO or drafting effort is required. The seal part numbers are not specified in the 3D Design Record. Where the Design Record is 2D print: Need a customer EWO to authorize 2D print changes. The seal part numbers are specified on the 2D Design Record DELPHI Packard Electric Systems Metri-pack Cable Seal Processing Change

Details: Note: Once approved, DPES will change product prints to specify the new loose piece seals. An equivalent construction note will be added to the component design print to allow usage of old part numbers to exhaust stock and to control interchangeability between Mylar and loose piece seals. DELPHI Packard Electric Systems Metri-pack Cable Seal Processing Change