Balancing and Managing Risk From the Design Builder’s Point of View

Slides:



Advertisements
Similar presentations
Managing Construction Risks
Advertisements

Schwabe, Williamson & Wyatts Real Estate and Business Seminar Series Risk Management Strategies For Multi-Family And Mixed Use Development May 10, 2006.
Overview Surety 101 State of the Industry
CARLIN LAW GROUP, APC (619) Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ.
Presented by BUSINESS INSURANCE FOR CONTRACTOR CANDIDATES EXPERTS IN FREELANCER & CONTRACTOR INSURANCE Tania Bowers.
Presented By: John D. Miller
JOINT VENTURES General Contractors’ Risk Management Perspective.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
Your Deliver Method... …Pick it Early
Liabilities and Risk Sharing RA Dirk Hoffmann MBA all rights reserved Best practices – a European perspective Dirk Hoffmann, MBA, Lawyer (Germany)
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
M&A & Insurance Mergers & Acquisitions Capabilities Presentation RIMS Fairfield/Westchester Chapter May 14 th, 2013.
1 Construction Engineering 221 Construction Insurance.
Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.
Chapter 4 Risk Management BCN 4772 Summer Risk Management What is Risk? What is Risk? Specific types of Risk Specific types of Risk Inflation Inflation.
Insurances. Insurance Insurance, is a form of risk management primarily used to hedge against the risk of a contingent loss. Insurance is defined as the.
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
Risk Management Construction Engineering 380. Risk Management Three types of risk need to be managed on construction/engineering projects –Financial or.
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Contract Pricing Methods Ch 2. Lump Sum –Contractor bids 1 price for entire project –Estimate needs to be detailed –Design needs to be finished before.
Financial Close The Insurance Review Process 6 th November 2014 Eoin Greene Irish Wind Farmers Association Annual Conference th November 2014 – Hotel.
Captive Considerations What to know, What to avoid #[insert hashtag here]
Local Government Forum, 15 September 2010 Tender Negotiations, Indemnity and Exclusion of Liability Kathryn Walker Senior Associate (08)
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Aon Limited is authorised and regulated by the Financial Services Authority in respect of insurance mediation activities only PPP in Baltic States Mitigating.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
How RISKY Is This??. How RISKY is This?? Buy a lottery ticket Only 3 will be sold Cost for a ticket $80 million Jackpot $2,000,000,000 Where is the
Manager and Service Provider Liability – Where are we now? World Alternative Investment Summit Canada 2010 Ingrid Pierce, Walkers.
John S. Albert, CFA Vice President John G. Russon, CFA Managing Director November 16, 2004 Annuities and Funding Agreements Discussion 7700 Bonhomme Ave.,
Why Bond Forms Matter… A Practical Guide to Better Bonding Presenters: Joanne S. Brooks, Esq., Vice President and Counsel, The Surety and Fidelity Association.
BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"
JEFFREY L. HUNTER SR RISK ANALYST County of Riverside Human Resource Dept. Risk Management Div. Insurance Requirements In Contracts.
Partnering our Business with Management & Service Solutions Why MXM Property Solutions Ltd? To date all our management commissions have been by referral,
Digital Fault Recorders CORP 3386 By Dhevlen Bisetty 16 February 2016.
The Basics of Self Funding
Click here to advance to the next slide.
CHANGING PROJECT DELIVERY SYSTEMS
Contracts A contract is an agreement between two or more parties which creates an obligation to do or not to do a particular thing. The document containing.
What Small and Emerging Contractors Need to Know Understanding Selected Key Provisions of Construction Contracts © Copyright 2017 NASBP.
Indemnification 101 February 24, 2017
Insurance in Construction
Presented by Henriott Group
Chapter 9 Impairment of Assets.
Profession Practices (ECIV-5105)
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
Things to look for in owner contracts
Introduction to Corporate Finance
Managing Your Personal Finance
Pension Reform Presentation
INSURANCE & BONDING REQUIREMENTS
Brian Bries, Area V.P.-Construction Practice Arthur J. Gallagher & Co.
The Basics of Self Funding
RISK ASSESSMENT TOOL PREVIEW
CHANGING PROJECT DELIVERY SYSTEMS
Retirement Plans and Mutual Funds
Quality Management Systems – Requirements
AGA RISK MANAGEMENT COMMITTEE Business Interruption Due to Fires, Storms, and Other Extreme Conditions Presented by: Kurt Tentinger, Managing.
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Building completion insurance
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
Pension Reform Presentation
ARCH 435 PROJECT MANAGEMENT
Find the Problems with the Provisions May 11, 2016 Presented By:
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Construction Insurance
3 questions = 4% of the exam
Unique General Conditions of the Alabama Building Commission (ABC)
Allocation of Risk Arising from Subsurface Conditions
“Bankable” Construction Contracts
Presentation transcript:

Balancing and Managing Risk From the Design Builder’s Point of View P3C Balancing and Managing Risk From the Design Builder’s Point of View February 26, 2018 February 3, 2017

Panel Moderator Panel Paul Monte, Partner, Peckar & Abramson Daniel Filer, Vice President of Business Development, Ferrovial David Boss, Project Director, Skanska Infrastructure Development Carol Stark, Director, Construction Services Group, Aon Jack Callahan, Partner, Construction Practice Leader, CohnReznick Karla Pascarella, Partner, Peckar & Abramson

Value for Money PM intro point: Gov’t retained risk drops by 13 but the concessionaire and DB risk doesn’t seem to be fully captured in the costs they are carrying. Are DBs fully pricing and managing the risk? Carol Jack

Risk Transfer This slide shows the types of risk that Gov’t wants shift to the private partner. Question to Dan and David: When choosing a P3 to pursue, how does a DB (contractor) examine the risk profile? Dan David

Flow Down Or FLUSH Down? The contracting model in P3 has always been to transfer risk to the private partner, and within the developer team to transfer risk from the SPV to the design-build team. Karla Is there a breaking point? Describe Are DBs pushing that risk to their designers, subs and suppliers?

Latent Defects in Existing Structures "Concessionaire shall be solely responsible for all costs, including Extra Work Costs and Delay Costs, associated with Structural Latent Defects in Pre-existing Bridges, except that … - the first $2M of Extra Work Costs ("Structural Latent Defects Deductible" directly attributable to repairing physical damage to Pre-existing Bridges caused by Structural Latent Defects shall be borne by Concessionaire … - Owner shall compensate Concessionaire for 100% of Extra Work Costs attributable to Structural Latent Defects in excess of the Structural Latent Defects Deductible … - Concessionaire shall not be entitled to Extra Work Costs covered by insurance … nor for Delay Costs of any kind …" This is a standard clause a private party will see, asking the private partner to take a set dollar risk for latent defects in an existing structure, without compensation for the Delay Costs Is that fair? Who wants to take this? Carol Dan David

Delay costs “… the risk of financial loss to the Developer arising out of a delay between the Baseline Substantial Completion Target Date and the Substantial Completion Date should be borne by the Construction Contractor …” Within the private team, the SPV typically doesn’t retain the full risk of Delay Costs Why Jack can you speak to this point? Dan? David?

What's the warranty and indemnity period? Defect in DB Work "DB Work Defect means any Defect with respect to the DB D&C Work attributable to the Design-Builder, except a Defect a Defect due to improper O&M Work" "Defect means a defect or deficiency in the condition or performance of any component of the Construction Project, whether by design, construction…" What's the warranty and indemnity period? This is another typical clause – the design builder is responsible for all Defects in its work – that seems like a fair point the DB designed and build it. But for how long? Karla Carol – for how long is the risk insurable?

Design & construction oversight culture There are several points of tension in a design – build relationship, including The reluctance of the public owner’s designer to give up control and limit oversight to checks The reluctance of the private partner’s designer to take on risks that are not insurable. When deciding what projects to pursue, how does the constructor evaluate the risk? Dan David

Professional Liability Insurance "For a total period of [___] years from the Financial Close Date … professional liability insurance, which may be written on a claims made form, with limits of liability not less than $[____] per claim and $[____] annual aggregate for engineering and design …" This is a standard flow down clause, requiring the private partner to secure professional liability insurance. Carol – what’s the current standard in the market? Is it fully covering the design risk?

Designer Limit of Liability "Designer's total aggregate liability to DB arising under this agreement … shall not exceed the maximum sum of [$___] …" What is the current market with respect to the Designer’s cap? Limits of Liability in the Concession Agreement Don’t Match On I-69, in the agreement between IFA and the concessionaire, there was a 50% liability cap (with 35% more common) and a 10% cap on liquidated damages, did that have an impact? Karla

Index Insurance? "All Dollar figures in the Insurance Policy requirements … shall be indexed annually …" Carol This is a clause that was used on a recent P3 Is it standard to Index Insurance? How can that be priced by the private party?

Who carries the cost of the risk? Differing Site Conditions Type 1 - Conditions different than indicated (in plans, geotechnical documents, and specifications) or anticipate based on local experience. Type 2 - Conditions different than normally encountered in the type of environment and work under consideration. Type P3 – Who carries the cost of the risk? Karla On I-69, you learned about Karst sinkholes in Indiana How did it impact the project? Did subs share the risk? Dan David

3. Utility Owner Delays that could have been mitigated" Utility Delays "Concessionaire shall be entitled to seek compensation and a time extension under the Contract Documents for a Utility Owner Delay, provided that … Notwithstanding, Concessionaire shall not be entitled to any relief relating to a Utility Owner Delay for the following: 1. Extra Work Costs 2. Delay Costs of any kind 3. Utility Owner Delays that could have been mitigated" Utility Owner Delay means a Delay directly attributable to a Qualifying Utility Owner in performing its obligations …” David Dan Karla Who bore the utility risk on i-69? Was there any obligation on the part of IFA to control?

DBE Safety Local Hires Prevailing Wage Community Benefits Don’t forget you’re other responsibilities DBE Safety Local Hires Prevailing Wage Community Benefits Jack

Choices This chart is a standard risk analysis How do DB’s analyze Entire Panel

Risky Business Questions