Experimental Areas – LS2 planning

Slides:



Advertisements
Similar presentations
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Advertisements

TDC2-TCC2 consolidation status report to EATM EDMS October 7 th, 2014 S. EVRARD, EN-MEF, on behalf of the TDC2/TCC2 WG.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
NA YETS: schedule week by week S. Evrard.
Update on the Laser Beam Line
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
I. Bergevoet - Training preparation
NA CONSOLIDATION & SAFETY SYSTEMS
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
SPS Winter stop Planning meeting (N06) 05/01/2011
YETS & LS2 Works EN-El on LHC / Power distribution
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
Injector De-cabling Project
AD consolidation activities in LS2
NA CONSOLIDATION & SAFETY SYSTEMS
EN 4946 – Refurbishment of Electrical Substations
n_TOF “Draft” plans for YETS and LS2
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Installations, modifications, consolidation in 2005:
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
NA CONSOLIDATION & SAFETY SYSTEMS
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-CV interventions during EYETS for PS and PSB
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
East Hall under construction
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
K. Foraz on behalf of OSS members
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Present and Future test facilities for High-intensity Targetry CERN
North Area Safety Review 2019
Access Control for CERN Experimental Areas
Aziz AMAMOU EACM – 21th May 2019
East Hall under construction
East Hall under construction
Comments on the North Experimental Area Consolidation Request Form
Presentation transcript:

Experimental Areas – LS2 planning Erwan Harrouch, EN-EA

Summary General LS2 planning in Exp. Areas Cooling needs in experimental areas Link to EA LS2 Planning (Access given upon request at the moment)

PS Complex PS&TT2

SPS Complex Experimental areas

Cooling needs in Exp. Areas during LS2 PS Complex : East Area : Demineralized water : Stop on the 03/12/2018 – Back on the 07/08/2020 (For F61 Hardware tests) CLOUD : Which water circuits are needed during 2019 RUN? Ntof : Demineralized water stop ok for the whole LS2 (From the 28/11/2018 – to the 18/12/2020) Cooling of the target to be kept? AD : Demineralized water stops : 2019 : 20/12/2018 – 06/02/2019 2020 : 19/12/2019 – 05/02/2020 2021 : 17/12/2020 – 03/02/2021

Cooling needs in Exp. Areas during LS2 SPS Complex North Area : BA80/81/82 : Demineralized water stopped from the 19/12/2018 to the 11/01/2021 (Magnet patrol to be done before the 19/12/2018 except in TDC2/TCC2, 1-2 day of demineralized water on in June 2019 for magnet patrol in TDC2/TCC2, EHN2 : Chilled water needed until the 7/12/2018 and then needed from the 14/12/2020. AWAKE : Needs all the CV services during LS2. Maintenance periods are being discussed between Ans. Pardons and EN-CV

Spare slides

Injector schedule https://edms.cern.ch/document/1687788/1.0 : Released

Booster Experimental Areas

PS Experimental Areas

East Area East Area Renovation Project Dismantling activities Installation activities Resource availability is the constraint for having physics back in the East Area https://edms.cern.ch/document/1771976/4

Ntof EAR2 Main works : EAR1 EAR2 EAR1 Target replacement Target shielding replacement with a mobile one EAR1 Sweeping magnet replacement New collimator installation EAR2 Removal EAR2 beamline for Target exchange EAR1 Target Beam from PS Planning in production (Aymeric Bouvard EAR1 / Sylvain Girod EAR2) 1st version available upon request PS Restart is the constraint for having physics back in Ntof

AD Main works : Refurbishment of AD ring magnets : Jan 2019 – Nov. 2020 ELENA transfer line reinstallation : Nov. 2018 – Mar. 2021 AEGIS Relocation (To be confirmed) Vacuum, RF consolidation, … Planning in production (Aymeric Bouvard / Francois Butin) (1st version available upon request) Workload is the constraint for having physics back in AD

SPS Experimental Areas

North Area Main works during LS2: More information in Y. Kadi slides from IEFC 232 Main works during LS2: General : Global maintenance (Beam equipment, Magnets, power converters, CV …) Magnets : Hoses and electrical interconnections renovation TCC2 Access control system upgrade TCSC repairs (water piping to be redone) BDF Target removal TCC8

Planning in production (Sylvain Girod) North Area More information in Y. Kadi slides from IEFC 232 EHN1 Flammable gas detection renovation (Salève Side) Gas Network consolidation (Salève side) New RP buffer zone 3 New power converters (NA61 & ATLAS Morpugo) Extension GIF (Not approved yet) New user area PPE144 for NA64 (Not approved yet) ECN3 New RP Buffer zone in b.911 Planning in production (Sylvain Girod) SPS Restart is the constraint for having physics back in the North Area

HiRadMat Main Work : cabling + patch panel installation (TNC) Renovation of TT61 area Beam Instrumentation: assembly of smaller “giraffe” Update of layout New surface lab (Not approved yet) Upgrade of Beam Windows & Dump (Not approved yet) Planning in production (Aymeric Bouvard) SPS Restart is the constraint for having physics back in HiRadMat

Awake Operation without proton until the end of December Operation during LS2 (Priority) : AWAKE request several months of laser-electron-plasma run BUT Access maintenance in the SPS (No access system in AWAKE from Jan.19 - Apr.19) 400kV maintenance in the SPS (No power for AWAKE from May 19 - May 20) Cabling activities in BB4 (lock out required, Not yet planned accurately) Future work : Dismantling of the CNGS Target Cavern (Scope and planning not validated yet, could be done during LS2 or at a later stage)

AWAKE Run 1 during LS2 Courtesy to Ans Pardons SPS BE-CO BE-ICS EN-EL No controls available BE-ICS No access system Power limited to 90 MVA Maintenance 400kV, need alternative power source EN-EL Cabling in the false floors of BB4 mean no power to AWAKE. EN-EL should release a planning mid-June, identifying when AWAKE can perform measures for run 1.Several periods of at least one month have been requested. AWAKE Run 1 No run1 possible Run 1 when power available (i.e. no cabling in BB4) Run 1 and/or run 2 with laser, electrons and plasma Run 2 Can remove shielding and install equipment for run 2 when cabling in BB4 or other works block run 1 (~2months of work)