Cable selection project

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
Fill in missing numbers or operations
AP STUDY SESSION 2.
Reflection nurulquran.com.
1
Worksheets.
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Sequential Logic Design
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Motor Installation By Bill Lee Article 430. NF 15HP NF 25HP NF 30HP NF 50HP NF 75HP D.E.T.D. Fuse Feeder O.C. Feeder Conductors N.T.D IV. Time D.E.T.D.
David Burdett May 11, 2004 Package Binding for WS CDL.
We need a common denominator to add these fractions.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
The 5S numbers game..
LSEGG307A 9080F. Describe the acceptable methods for determining the maximum demand on an installations consumers mains. Calculate the maximum demand.
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
An Application of Linear Programming Lesson 12 The Transportation Model.
Chapter 11 AC Power Analysis
Welcome to PHOENIX CONTACT Masterversion 13 Electromagnetic and electronic circuit-breaker CLIPLINE complete.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Progressive Aerobic Cardiovascular Endurance Run
1..
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Static Equilibrium; Elasticity and Fracture
Essential Cell Biology
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
PSSA Preparation.
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
FIGURE 3-1 Basic parts of a computer. Dale R. Patrick Electricity and Electronics: A Survey, 5e Copyright ©2002 by Pearson Education, Inc. Upper Saddle.
BS7671 Formula and Tips.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
ELECTRICAL INSTALLATION PLANNING
Electrical Contractor
LSEGG307A 9080F. Describe the acceptable methods for determining the maximum demand on an installation’s consumer’s mains. Calculate the maximum demand.
Testing of Low Voltage Installations
Engineering Project Cable Management.
Presentation transcript:

Cable selection project Factory office installation

maximum demand sub- mains cable Each factory/warehouse consists of the following loads 8- 250W mercury vapour lamps 4-60watt incandescent lamps 3-18watt fluorescent. External 1-500watt sodium vapour lamp. External 6-10A double single phase outlets 3-20A 3 phase outlets 1- 15A three phase storage hot water

Office Lighting 8-double 36 watt fluorescent lights Power 8- double10A single phase outlets 1- single 10A single phase outlet

Step 1 Divide the installation into circuits and distribute these circuits across the three phases Calculate the maximum demand of the installation The maximum demand of the sub- mains is the load on the heaviest loaded phase

Arrange into circuits Factory Office Circuit 1 (4-250W) lamps (R ) Circuit 2 (4-250W) lamps (W) Circuit 3 (4-60watt) + 2 EF 60W (B) Circuit 4 (3-18watt) F/lamps (W) Circuit 5 (1x500watt SV lamps) (B) Circuit 6 (2 double 10A) outlets (R) Circuit 7 (2 double 10A) outlets (W) Circuit 8 (2 double 10A) outlets (B) Circuit 9 (20A 3 phase) outlet Circuit 10 (20A 3 phase) outlet Circuit 11(20A 3 phase) outlet Circuit 12 (15A 3 phase) HWS Office Circuit13 (8 double36 watt fluorescent) (B) Circuit14 (3 double 10A outlets) (R) Circuit15 (3 double 10A outlets) (W) Circuit16 (2 double 1 single 10A outlet) (B)

MD Sub-mains using table C2 Factory Circuit no Load group Load calculation R W B 1 A (4-250W)MV lamps 1.5A each 4 x 1.5 = 6 6 2 (4-250W) MV lamps 1.5A each 3 (4-18W) energy saver 0. 05A each 2x60w exhaust fans at 0.3A each 0.8 4 (3-18W) fluorescent 0.12A each 0.36 5 1-500w sodium vapour lamps 0.8 pf 2.72 B i 2-10A double 1Phase outlets = 4 14.14 7 2-10A double 1Phase outlets =4 8

Maximum demand Sub-mains Circuit no Load group Load calculation R W B 9 B (iii) 20A three phase outlet Full load 20 10 75% Full load 15 11 12 G 15A three phase HWS office 13 A 8-twin 36w fluorescent 6.24 14 B (i) 3-10A double outlets single phase 19.56 16 2-10A double 1-10A single Outlets single phase 16.3 Maximum D 104.7 105.6

Cable size for sub-main to factory/warehouse unit1 The Maximum demand is 106A Mains Sub-mains X90 SDI Cables double insulated buried in separate U/G conduit Current carrying capacity T7/18 25mm² = 135A Voltage drop T41 Vc =1.62mV/Am So 25mm² X90 SDI Cables in separate conduits will satisfy both current and voltage drop requirements. Unit 1 has the longest run (38 metres) so 25mm² will satisfy units 2 and 3

Installation load The installation consists of the following loads. Lighting 24 – 250W mercury vapour Lamps 24 – 2x36W Fluorescent Luminaires 0.78A each 12 – 18W fluorescent to replace 60W 8 – 18W Fluorescent 6 – 60W exhaust fans 0.3A each 3 – 500W

Installation load Power 42 – double 10A single phase outlets 3 – single 10A single phase outlets 9 – 20A three phase outlets 3 – 3 phase HWS

Consumers Mains maximum demand Load Group load Calculation R W B 24 – 250W mercury vapour Lamps (8 per phase) 8 x 1.5 = 12 12 24 – 2x36W Fluorescent Luminaires (8 per phase) 6.24 12 – 18W fluorescent (0.05A) to replace 60W 4 x 0.05 = 0.2 0.2 6 – 60W exhaust fans (0.3A each) 2 x 0.3 = 0.6 0.6 8 – 18W Fluorescent (0.12A) 3,3,2 per phase 0.12 x 3 =.36 0.12 x 2 = .24 0.36 0.24 3 – 500W 2.71 14 Double +1 single 10A single outlets per phase (29 per phase) 87 outlets total 95.65 9 – 20A three phase outlets 20 + 8 x 15 =140 140 3 - 15A 3phase HWS 3 x 15 = 45 45 MD 302.8 302.7

Cable Size consumers mains The consumer mains are X90 SDI cables installed in conduit U/G for a length of 40 metres Determine the cable size to suit current and voltage drop requirements Table 2.4 item 2 refers to Table 7/16 150mm² = 330A The cable can carry the MD current Check for voltage drop. Table 41 Vc for 150mm² conductors = 0.309mV/Am (60ºC) The cable is rated at 90ºC and by choosing a Vc value at 60ºC this allows for temperature rise under Short circuit conditions

Progressive Voltage drop Consumers main Volt drop 3.745 volts 10 metres DB unit3 40 metres MSB Turret 20 metres DB Unit 2 38 metres DB Unit 1 Sub-main voltage drop 6.52 volts 3.745 Volts 6.52 Volts

Progressive Voltage drop distribution board unit 1 Consumers mains Final sub-circuits Sub-main 5.57 volts allowed in all single phase circuits 9.735 Volts allowed in all 3 phase circuits 3.745 volts 3 phase Value 6.52 volts 3 phase value 3.745+6.52 = 10.265 volts 3 phase Therefore the 3 phase voltage drop allowed in all 3 phase circuits supplied from the DB Unit1 is 20 – 10.265 = 9.735 V To determine the single phase voltage allowed in final sub circuits Therefore the single phase Voltage drop allowed in all single phase circuits supplied from distribution board Unit 1 is 11.5 – 5.93 = 5.57 Volts

Circuit arrangements Cable Designation Maximum demand Installation Parameters AZ/NZS 3008/1/1 Table No column Consumers mains 302 A XLPE (X90) SDI enclosed UG Table 2.4 Table 7 4 16 Sub-mains 106 A X90 SDI enclosed U/G 18 4x250W MV Lamp Factory 2 circuits 6A TPS V90 installed with 3 other circuits De rate 0.78 Table 2.1 Table 9 Table 24 2 8 10A outlets Factory 16A TPS V90 installed with 3 other circuits spaced De rate 0.87 item22

Cable designation Maximum demand Installation parameters AS/NZS 3008 Table no Column no 3 phase outlets 20A TPS V90 installed with 2 other circuits On cable De rate 0.82 Table 2.1 Table 12 Table 24 4 2 8 EF + Battens In Toilets 0.8A TPS unenclosed 3 other circuits on cable tray up wall from switchboard Table 9 De-rate 0.88 HWS 15 3 other circuits on cable tray up wall with 3 other circuits 500W SV 2.8A TPS installed enclosed U/G Table 2.4 16

Cable Size 20A 3Ø outlets Distribution board Unit 1 Sub-main Mains MSB Unit 1 DB U/G turret Determine the cable size for the 20A 3 phase outlets 1 per circuit, longest run 38 metres The cable is 3core TPS V 90 installed enclosed in air. No de-rating for this section. Unenclosed in air spaced on perforated tray up wall above switchboard 4 circuits 20A 3Ø outlet To satisfy voltage drop requirements Table 42 a 4 mm² Cable with a Vc value of 9.71 mV/Am value is required

Cable Size 20A 3Ø outlets Distribution board Unit 1 Sub-main Mains MSB Unit 1 DB U/G turret Determine the cable size for the 20A 3 phase outlets 1 per circuit, Route length 25 metres Current carrying capacity is the limiting factor in this circuit 20A 3Ø outlet To satisfy Current carrying capacity, a 4mm² TPS cable is required

Cable Size 20A 3Ø outlets Sub-main Mains Unit 1 MSB U/G DB turret Determine the cable size for the 20A 3 phase outlets 1 per circuit, Route length 15 metres 20A 3Ø outlet In this instance Voltage drop is not the governing factor. A 4mm² cable is required for CCC

10A single phase outlets 6 outlets in warehouse 2 per phase, (3 circuits). Circuit 1 (38m route length) The outlet is at the end of the run therefore use MD =10A Therefore from Table 42, 4mm² cable is required for volt drop Cable enclosed in conduit on wall with 3 0ther circuits spaced ( 4 circuits ) Table 9/6 4mm² cable = 26A De-rating Table 22 (0.9) 26 x 0.87 = 23.4A

10A single phase socket outlets Circuit 2 (30m route length) Therefore from Table 42 2.5mm² with a Vc value of 15.6mV/A.m is required Circuit 3 route length 20m route length can also be wired in 2.5mm² Table 9 column 6 (2.5mm² cable)=20Ax0.9 =18A So a 2.5mm² cable will satisfy both CCC and Vd

Light Circuits unit 1 Circuit 1 (4x250W mercury vapour) Route length 38m Maximum Demand 4 x 1.5A = 6A. Circuit beaker rating 10A . Determine Cable size So from Table 42 a 2.5mm² cable with a Vc value of 15.6mV/A.m three phase 15.6 x 1.155 =18mV/A.m is required

Light Circuits unit 1 Circuit 2 (4x250W mercury vapour) Route length 44m Maximum Demand 4 x 1.5A = 6A. See clause 3.5.2 50% of circuit protective device can be used Circuit beaker rating 10A . Determine Cable size So from Table 42 a 2.5mm² cable with a Vc value of 15.6mV/A.m three phase 15.6 x 1.155 =18mV/A.m is required

Circuit 3 four battens and 2 EF Toilets Route length 28m So from Table 42 1.5mm² cable is required Table 9 column 6 (1.5mm² cable = 14A)

Circuit 4 (3x 18W) Fluorescent Route length 50m Voltage drop is not a factor for this circuit Either 1mm² or 1.5mm² can be used

Circuit 5 (500W) sodium Vapour Route length 16m TPS Cable V90 Installed enclosed U/G Distribution Board 500W Sodium vapour Voltage drop is not a factor for this circuit Either 1mm² or 1.5mm² can be used

Hot Water Cylinder 3 phase 15A Route length 28m Cable 3core + E enclosed TPS V90 Table 12 column 2 (2.5mm² = 23A) Check Voltage drop Table 41 (2.5mm² = 15.6mm²)Therefore 2.5mm² Cable

Office 8-2x36W(0.78A) fluorescent one circuit Route length 40m Use 10A MCB Rule 3.6.2 50.% circuit protective device for voltage drop Table 42 1.5mm² = 28.6mV/Am. Use 1.5mm² cable

Office10A socket outlets Circuit 14 (three double outlets) Route length 22m TPS cable installed unenclosed in air Table 9 column 4 (2.5mm² = 26A)Use 20MCB Rule 3.6.2 (50.% circuit protective device for voltage drop) Table 42 2.5mm² = 15.6mV/Am 2.5mm Cable for all socket outlet circuits in the office.

Fault loop impedance The earth fault-loop impedance in an MEN system comprises the following parts, starting and ending at the point of the fault. a) The protective earthing conductor, (PE), including the main earthing terminal/connection or bar and MEN. b) The neutral return path, consisting of the neutral conductor, (N), between the main neutral terminal or bar and the point at the transformer (the earth return path RG to RB has a relatively high resistance and may be ignored for an individual installation in an MEN system)

Fault loop impedance c) The path through the neutral point of the transformer and the transformer winding. d) The active conductors as far as the point of the fault. The earth fault-loop is normally regarded as consisting of the following two parts- i) conductors upstream or external to the reference point; and ii) conductors down stream or internal to the reference point. Refer to appendix B for detail

Path taken by an earth fault current

Earth fault-loop impedance Fault current IA Distributor's network A H POS MEN NeutralBar Main Earth Faulty equipment Soil resistance high between electrodes

Determine maximum route length to satisfy fault loop impedance. The maximum length of a circuit can be determined using Table B1 (Exceptions include circuits wired in 4mm² cable protected by a 16A or 20A Type C MCB) The maximum length for this example will need to be calculated

Calculation 16A MCB A 4mm² Cable protected by a 16A MCB can be run 109m and not exceed the earth fault loop impedance requirements

Switchboards Units 1-3 120A Main switch MCB’S L L L L L P P P P P P HW 10 10 10 10 10 16 16 16 20 20 20 16 10 16 16 16

Main Switch Board