NMA and E-array Progress

Slides:



Advertisements
Similar presentations
Thin Films, Diffraction, and Double slit interference
Advertisements

R.G. The Professional Development Service for Teachers is funded by the Department of Education and Skills under the National Development Plan Some properties.
SKADS: Array Configuration Studies Implementation of Figures-of-Merit on Spatial-Dynamic-Range Progress made & Current status Dharam V. Lal & Andrei P.
ECMWF WMO Workshop19-21 May 2008: ECMWF OSEs Slide 1 The ADM-Aeolus mission Geneva, May 2008 Representing the ADM-Aeolus Mission Advisory Group,
Optimization of Compact Array Configurations to Minimize Side-Lobes for Two Cases: The New E-configuration for the EVLA and Phased Array for the LWA Station.
The Green Bank Telescope a powerful instrument for enhancing ALMA science Unblocked Aperture Low sidelobes gives high dynamic range Resistance to Interference.
Interference & Diffraction
Array Design David Woody Owens Valley Radio Observatory presented at NRAO summer school 2002.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
Real Camera Real-time Rendering of Physically Based Optical Effects in Theory and Practice Yoshiharu Gotanda tri-Ace, Inc.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
November 2009, Lunch talk The most compact E configuration for the EVLA. L. Kogan, G. Stanzione, J. Ott, F. Owen National Radio Astronomy Observatory Socorro,
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
S.T. MyersEVLA Advisory Committee Meeting September 6-7, 2007 EVLA Algorithm Research & Development Steven T. Myers (NRAO) CASA Project Scientist with.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
Interferometry Discuss Group & Python Tutorial Adam Leroy & Scott Schnee (NRAO) February 28, 2014.
5 June 2007Carlton L. Rhoades 1 The Moon: Front Line of Asteroid Defense Carlton L. Rhoades Rutgers Symposium.
Distributed Backup And Disaster Recovery for AFS A work in progress Steve Simmons Dan Hyde University.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
WRF Four-Dimensional Data Assimilation (FDDA) Jimy Dudhia.
Sanjay BhatnagarEVLA Advisory Committee Meeting May 8-9, EVLA Algorithm Research & Development Progress & Plans Sanjay Bhatnagar CASA/EVLA.
Answers from the Working Group on AGN and jets G. Moellenbrock, J. Romney, H. Schmitt, V. Altunin, J. Anderson, K. Kellermann, D. Jones, J. Machalski,
NASSP Masters 5003F - Computational Astronomy Lecture 14 Reprise: dirty beam, dirty image. Sensitivity Wide-band imaging Weighting –Uniform vs Natural.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Interference and Diffraction
Motion Estimation Today’s Readings Trucco & Verri, 8.3 – 8.4 (skip 8.3.3, read only top half of p. 199) Newton's method Wikpedia page
Interference and Diffraction. Conditions for Interference Coherent Sources - The phase between waves from the multiple sources must be constant. Monochromatic.
Ceilometer absolute calibration to calculate aerosol extensive properties Giovanni Martucci Alexander Marc de Huu Martin Tschannen.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Motion Estimation Today’s Readings Trucco & Verri, 8.3 – 8.4 (skip 8.3.3, read only top half of p. 199) Newton's method Wikpedia page
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Rick PerleyEVLA Phase II Definition Meeting Aug 23 – 25, The Expanded Very Large Array Phase II Baseline Plan and Constraints.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Michael RupenEVLA Phase II Definition Meeting Aug 23 – 25, EVLA Phase II Scientific Overview Michael P. Rupen.
ALMA Scientific Advisory Committee Grenoble, Apr 2003 Antenna Procurement S.Guilloteau ex-AIPS (Alma Interim Project Scientist) VAPS (Virtual Alma Project.
1 /16 How do you make an image of an object ? Use a camera to take a picture ! But what if the object is hidden ?...or invisible to the human eye ?...or.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ngVLA: Reconfigurability.
Chapters 36 & 37 Interference and Diffraction. Combination of Waves In general, when we combine two waves to form a composite wave, the composite wave.
Rosetta Science Working Team Meeting #26 Working Group #1
Fibre Evaluation for MRO Conditions
AIPS.
June 29, 2017 Suzanne Hendrix, PhD Pentara Corp
Goal: To understand what it will take to find another “Earth”
5 - Simulating Bloodhound’s Speed Trial
EVLA Project Peter Napier
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
Applied Geophysics Fall 2016 Umass Lowell
Introduction to Networks
Evaluation Model for LTE-Advanced
Phase II (Completion) Goals
Chapter 10 Light.
Astronomy-Part 10 Notes The Earth-Moon-Sun Systems
Unit 1.4 Waves and Sound.
Antenna Monitor & Control Subsystem Engineering Requirements
Budget, Schedule, Contingency
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Observational Astronomy
VLA to EVLA Transition Plan
EEO Fund Allocation Model In 2015, the Statewide EEO and Diversity Advisory Committee and the CCCCO modified the EEO Fund Allocation Model Historically,
Some Curious Results of Array Investigation
EVLA Advisory Committee Meeting
Gustaaf van Moorsel September 9, 2003
Academic Intervention Progression Template
Correlator Growth Path
EVLA Sensitivity & Survey Speed
GLAS Cloud Statistics and Their Implications for a Hybrid Mission
EVLA Postprocessing Algorithms
optical technologies & future campus architectures
Presentation transcript:

NMA and E-array Progress EVLA Phase II NMA and E-array Progress Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting People Aaron Cohen Steve Durand Leonia Kogan Bob Tacker Cam Wade Craig Walker Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting NMA Puzzle Combine UV Coverage, Land Availability, Power Availability and Fiber Optics Network into a practical Array Design Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting Criteria for now Fiber --- Find Sites Near Existing, Available Fibers. Power --- Find Sites with minimum distance from 3-phase power. Land --- Find sites with multiple acceptable land options. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting Criteria for now Stay away from sensitive environmental areas, population concentrations, potential interference, etc In some cases add, somewhat longer runs of fiber or power to fill out uv coverage. Current array is likely to be modified later. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting NMA Sites Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting NMA - Milagro Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting NMA - Separ Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting Fidelity “100km” Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

Fidelity Full Resolution Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting NMA Sites Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting NMA Issues What is An Acceptable Configuration ? What should happen in 2003 ? Should we continue full speed ahead (at some expense to phase I) or should we “mothball” NMA until we get real funding ? Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting E-array Goal: Better Fidelity and Surface Brightness Sensitivity at minimum Cost. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting E UV-coverage Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting E-array However, E array beam-shape, shadowing become a problem in the south (e.g. –30d) To image well in the south we need a stretched E-array. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting Shadowing Regular E Array E-30 Array Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting E-30 UV-coverage Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting Simulations Plan for the phase II completion document is for full mosaic simulations (including GBT) to test E and E-30 performance using AIPS++. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

EVLA Advisory Committee Meeting E-array Issues How much simulation for E should we do ? Do we want E-30 ? Frazer Owen EVLA Advisory Committee Meeting June 11, 2002