RAD Evolution Workshop

Slides:



Advertisements
Similar presentations
1 Performance Indicators: Selection, Application, and Reporting Presented by John M Rodgers Federal Aviation Administration.
Advertisements

Performance Review Commission, and performance management of the European ATM system Keith C. Williams, Chairman PRC.
VARTAN – Validation Reporting Templates Jürgen Teutsch, NLR CAATS Workshop, 16-Feb-2006, Lanzarote.
European ATFM From current operation towards the future Patrick Ky
Hans Koolen NMOC/CFMU Network Operations Services
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Peter Matern Head of ADM Unit 30/01/2014
Continuous Climb Operations (CCO) Saulo Da Silva
EURIDICE project Evaluation of image database use in online learning environment 11/
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Why Flight Plan and ATFCM adherence?
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
United Nations Statistics Division Registry of national Classifications.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
ICARD USER FORUM Recommendations and Conclusions (Paris, 20. – 21. September 2010)
ROUTE CHARGING POLICY FOR A FUNCTIONAL BLOCK OF AIRSPACE (CEATS) 1 st International Conference on Research in Air Transportation ICRAT 2004 Zilina, Slovakia.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Brussels RURAL WINGS IP RURAL WINGS User needs analysis (WP 3 D3.1) Mid term Review Meeting.
E-PRTR incompleteness check Irene Olivares Industrial Pollution Group Air and Climate Change Programme Eionet NRC workshop on Industrial Pollution Copenhagen.
Building an ENI CBC project
MULTIPLIER EVENT January , Brussels.
August ICA Agenda Time Topic 8:00 – 8:15
Free Routing Airspace in Europe
Workshop on preparations for ANConf/12 − ASBU methodology
Introduction of TBO within OptiFrame
Introductory Remarks and Meeting Goals
Continuous Climb Operations (CCO) Saulo Da Silva
Line of Development 1 (LoD1)
Work Package 3 Data Management
Status report on the activities of TF-CS/OTA
VOLATILITY IN ATM: CASES, CHALLENGES, SOLUTIONS
Continuous Climb Operations (CCO) Saulo Da Silva
Nikola Ivanov, Fedja Netjasov, Radosav Jovanovic
Recommendations and Conclusions
Temporary Capacity Restrictions: TCR WG & TCR tool
MIWP MIWP actions follow-up
Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance
Communications Operating Concept & Requirements (COCR)
Performance Indicators: Selection, Application, and Reporting
RAD evolutions workshop 2018
CFSP’s view on the current RAD
Legal framework of territorial classifications and typologies for European statistics – state of play NUAC meeting, Brussels June 2015 Gorja Bartsch.
RAD in DFS – information for external stakeholders
Workshop on preparations for ANConf/12 − ASBU methodology
NM/4ACCs Initiative.
Roland Beran Morten Grandt
Inventory preparation for priority substances
RAD Evolution Workshop Network Approach to the RAD - DP/4
Exit Capacity Substitution and Revision
RAD Evolution Workshop Purpose of the RAD and evolutions to-date
Update on Exit Capacity Substitution and Revision
RAD Evolution Workshop RAD Purpose and evolutions to-date - IP/1
RAD Evolution Workshop Current RAD status
RAD Evolution Workshop Outcome
RAD Evolution Workshop
Rail transport developments Agenda point 7.2
RAD Evolution Workshop Network approach to the RAD - DP/3
Soren Dissing - EUROCONTROL
Hanna Gembarzewska, Monika Grabani
Editing Board Meeting Status Expert Groups (Transmission, Axle)
WHERE IS The added valuE?
WP 2: Align / synchronise progress reporting under both directives
Surveys on ODS alternatives
Presentation transcript:

RAD Evolution Workshop RAD Impact Assessment Study RAD WS 12 - 13 DEC 2018, Brussels, Belgium Boris Radovanovic NM/NSD/PCI 12 DEC 2018

Study Requirement

RNDSG Action Requirement (FEB 2015) RAD Restrictions Study NM to run a Network impact assessment of the RAD restrictions implemented in the States. States to study if some of the RAD restrictions were put in place to balance capacity during a specific period of the year and therefore can be deactivated during the rest. States NM

Content and Analyses

Purpose and Scope RAD restrictions impact on the horizontal flight planning efficiency. Correlation of two restrictions. Difference in applying restrictions in planning and actual phase of flight.

Tool and Methodology - SAAM / NEST All calculations are done with following baseline and assumptions AIRAC 1705 SAAM/NEST dataset is used; Traffic: 19 MAY 2017 (34001 flights); No flow regulations; Sectors configurations and capacities are not considered; No military activities; No wind constrains; Improved SAAM Assignment on the shortest distance between city pairs; Only RAD restrictions impacting horizontal trajectory are investigated in a way as they are defined in SAAM, considering how they are described in the RAD document.

Macroscopic Analysis

Macroscopic Analysis Difference between RTE-DES and RTE-RAD

M1

RAD ON - SAAM assignment

M3

RAD OFF - SAAM assignment

Macroscopic Analysis Percentage of used RAD Pan-European Annex restrictions in SAAM/NEST assignment. Used restrictions - all RAD Pan-European annex restrictions defined in the SAAM/NEST dataset that have be considered during any of the assignment steps. Not used restrictions - all RAD Pan-European annex restrictions that were not involved in any of the assignment computations. As an average, 6 RADAN restrictions has to be considered per CP (flights on CP EDDM_EGBB have to consider 32 different RADAN restrictions with all braches taken in consideration).

RAD Restriction Utilization Route extension (in NM) caused by RAD restriction (horizontal) Significant impact on horizontal flight efficiency (total penalization) City-pairs per number of different RAD Pan-European annex restrictions considered (main branch)   City Pair Number of RADAN 1 EDDL_LOWS 7 2 LTAC_EDDK 5 3 LIMC_EGHH 4 LOWI_EDDF LIPE_EDFM 6 LEIB_EGKK LDZD_EGBB 8 LFPG_EDDB 9 EKBI_EDSB 10 LFPG_EINN

RAD Restriction Utilization Route extension (in NM) caused by RAD restriction City-pairs significantly impacted by RAD City-pairs per number of different RAD (total length difference between restricted (average length difference between restricted and not restricted assignment) and not restricted assignment)   City Pair Number of Flights Total Length Diff (NM) Average 1 EGPH_EGLC 13 1560.9 120.07 2 EIDW_EGLC 12 1280.85 106.74 3 ENZV_ENGM 25 981 39.24 4 UKBB_UGTB 691.8 345.90 5 UGTB_UKBB 683.97 341.99 6 EDDL_LEPA 15 682.31 45.49 7 LEBL_EGKK 658.18 43.88 8 EDDH_EDDF 18 620.92 34.50 9 UDYZ_UKBB 586.66 293.33 10 UKBB_UDYZ 585.11 292.56   City Pair Number of Flights Total Length Diff (NM) Average 1 EGPH_EGLC 13 1560.9 120.07 2 EIDW_EGLC 12 1280.85 106.74 3 EGKK_EGAA 11 580.1 52.74 4 LEPA_EGKK 10 521.88 52.19 5 LFPG_LSGG 499.36 49.94 6 EDDL_LEPA 15 682.31 45.49 7 EBBR_LSGG 450.01 45.00 8 EGLL_LSGG 581.23 44.71 9 LEBL_EGKK 658.18 43.88 EHAM_LSGG 453.49 41.23

LIPE_EDFM EDFM LIPE

LIPE_EDFM EDFM LIPE

LIPE_EDFM EDFM LIPE

LIPE_EDFM EDFM LIPE

LIPE_EDFM EDFM LIPE

LEPA_EDDF EDDF LEPA

LEPA_EDDF EDDF LEPA

LEPA_EDDF EDDF LEPA

RAD Restriction Utilization Possible correlation with other RAD restrictions pivot - by resolving this RAD restriction others restrictions at the same step will be resolved as well periphery - restrictions that were in the same step as pivot, but were not selected for computation; their conditions were satisfied by resolving the pivot restrictions.

RAD Restriction Utilization Deviation from the RAD restrictions on ATC Distribution of RAD restrictions from which flights were exempted in m3 (per country of origin)

RAD Restriction Utilization Deviation from the RAD restrictions on ATC

RAD Restriction Utilization Deviation from the RAD restrictions on ATC

RAD Restriction Utilization

Contradictory / Double

RAD Restriction Simplification Comparison of RAD restriction pairs as they are defined in RAD Annex

Study Presentation

Presentation and Discussion Internal EUROCONTROL NM distribution in August 2017. Bi-lateral skyguide - EUROCONTROL NM meeting in Geneva (12 SEP 2017). skyguide has provided EUROCONTROL NM with comments on RAD restrictions used as an example in the document and has requested additional data to proceed with further analysis. RMG/30 (NOV 2017) with relevant action it was agreed the NRCs, AOs and CFSPs to provide relevant feedback on presented methodology, results and conclusions. FABEC AOG workshop in Langen (29 JAN 2018), where it was agreed that ANSPs will request and evaluate additional data on RAD utilisation provided by EUROCONTROL NM. Discussed (but not presented) at the RNDSG/93 (FEB 2018) where several ANSPs expressed their support for this study and requested EUROCONTROL NM to continue with the further elaboration of this study. Concluded that the “RAD Impact Assessment Study” document to be updated with the new examples and EUROCONTROL NM to continue sharing additional data with ANSP on their request.

Presentation and Discussion Officially presented at RNDSG/95 (SEP 2018). In accordance with Action RNDSG/95-12 (SEP 2018) and on States request EUROCONTROL NM provided required data to Austria and Greece. FMP exchange: Italy and Spain requested data Reference Subject: Description and Action Responsible Completion Date RNDSG/95-12 (SEP 2018) RAD Network impact assessment study NM can provide more details on the presented study to the ANSPs on their request.   NM ASAP RNDSG/95-13 (SEP 2018) NM to provide further presentations on the study at the NM RAD Workshop on 12 - 13 December 2018. 12 - 13 December 2018

QUESTIONS, COMMENTS and DISCUSSIONS