Section II Applications of Measurements

Slides:



Advertisements
Similar presentations
Cross Section and Borrow Pit Methods
Advertisements

Earthwork Profile Leveling 1.
Review Week 6 CVL 305A.
Applying Profiling Leveling Techniques
Chapter 3 Measuring Excavation and Sitework
Measuring Sitework, Excavation, and Piling
Earthmoving Materials and Operations
Earthwork QTO Stage 1 Preconstruction Stage 2: Procurement
Wes Marshall, P.E. University of Connecticut March 2007
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Profile Leveling.
ERT252/4 GEOMATICS ENGINEERING
Lecture 3 Earthmoving Materials
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Land levelling design methods - plane method
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
Profile elevations Sometimes the profile is too steep to illustrate on our profile sheet so we have to break the profile. This partial profile illustrates.
CE 453 Lesson 24 Earthwork and Mass Diagrams
Contour lines. Contour lines: curved lines drawn on the map, connecting points having the same elevation.
CHAPTER 3 LEVELING.
Profile and Differential Leveling
Differential Leveling
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Wes Marshall, P.E. University of Connecticut March 2007
Planning for Earthwork Construction
Chapter 8 – Leveling, Cont.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
Chap 7 – Differential Leveling
Lesson Applying Differential Leveling Techniques.
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 12 Earthwork.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Surveying 1 / Dr. Najeh Tamim
EXERCISE: A 0.04ha pond has to be built in clayey soil with dikes 1.50m high and 1m wide at the top. If SD = 1.5: 1 and SW = 2:1. Calculate the base width.
Profile Leveling.
LEVELLING AND CONTOURING BY:- ANAND R. JIBHAKATE CIVIL ENGINEER 1 1.
Site Grading of Terrace
Calculating Cut and Fill
CONTOURING.
Unit: Surveying Lesson: Differential Leveling
Engineering Surveying
The Coordinate Plane; Graphs of Equations; Circles
Geologic Geometry.
Find: Average Slope AD [%]
Topographic Survey Introduction „ Mapping surveys are made
Topographic Survey Introduction „ Mapping surveys are made
Find the indicated value
Leveling.
Section 3.3 Graphing Linear Functions
Leveling.
Leveling.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
ADVANCE SURVEYING.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Leveling.
Leveling.
Leveling.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Differential Leveling
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Leveling.
CONTOURING.
CONTOURING.
Revise No. II.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Lecture 7.
Chapter 6 Construction Quantity Measurement
Presentation transcript:

Section II Applications of Measurements 2. Earthwork كميات الحفر و الردم 1 1 1

Profile Leveling القطاعات الطولية To collect data about topography along a reference line. Mainly to compute volumes of cut and fill الحفر و الردم for a proposed linear structure, such as: highways, railroads, transmission lines, canals. Then the best route can be chosen. The result: elevations at definite points (stations) along a reference line, usually the center line. 4

Field Procedures Profile leveling 7

First a backsight at a BM is observed. Then, a number of intermediate sights are observed at the locations needed, do not have to be at equal distances. When the distance becomes too long, or readings become hard to observe, a turning point نقطة دورا ن is constructed. You cannot keep the backsight distance equal to the foresight distance. Elevation computation: Elevation of line of sight (LS) = EBM + BSBM. Elevation of any intermediate point = ELS - ISIP. Elevation of point at FS = ELS - FSPOINT Handle new level positions as in differential leveling, construct a turning point and knowing BS and FS readings, compute a new elevation of line of sight. 9

Intermediate sight (IS) Example Point Backsight (BS) مؤخرة Intermediate sight (IS) متوسطة Foresight (FS) مقدمة Elevation of line of sight (HI)  منسوب خط النظر Elevation BM 09 1.573   20.00 1 1.472 2 1.718 3 1.352 1.551 4 1.181 5 1.492 6 2.101 1.212

Intermediate sight (IS) Answer Point Backsight (BS) مؤخرة Intermediate sight (IS) متوسطة Foresight (FS) مقدمة Elevation of line of sight (HI)  منسوب خط النظر Elevation BM 09 1.573   20.00 1 1.472 2 1.718 19.885  3 1.352 1.551 4 1.181 5 1.212 1.492 6 2.101 21.573 20.101 21.374 20.022 20.193 21.094 19.882 18.993

Drawing and Using Profiles Drawn using a software now. To manually draw a profile and compute earthwork: Assume the horizontal axis is the distance and the vertical axis is the elevation. Use a larger scale for the elevation than the scale of the distance, usually 10 times larger. Draw the design line at the proposed grade الميل . Compute the areas of cut and fill. Multiply area by width to get volumes. Gradient الميل (percent grade) is the rise or fall in m per 100. 10

Horizontal scale 1: 2500 Vertical scale 1: 250 1 m 10 m Horizontal scale 1: 2500 Vertical scale 1: 250 11

Example Point Distance (m) Elevation (m) A 0.0 115.0 B 100 117.2 C 200 The table below shows ground elevations along the centerline of a proposed pipeline. If the bottom of the trench to be excavated is at elevation (+115m) at point (A) and slopes -1%, and the the trench is 2m wide, compute the volumes of cut and fill. {Answer is given in lecture} Point Distance (m) Elevation (m) A 0.0 115.0 B 100 117.2 C 200 116.0 D 300 112.0 E 400 110.5 F 500 110.0

Borrow-Pit Method الميزانية الشبكية Not suitable for linear features, very useful for construction sites. The site is divided into equal squares. Elevations are then measured at the corners of the grid الشبكة , which are given names that correspond to the corner coordinates in the grid, ex: 3-D, 4-A, etc. Then heights of cut or fill (hij) over design elevation are computed. Where is the height at the intersection of axes i with axis j, then: V =  (hijn) A yd3 4*27 The idea is to multiply each height by the number of complete squares it is common to (n), the product is then multiplied by (A/4) where A is the area of one of the squares ( ) 12

The volume on any square, or part of a square is equal to the average height(elevation difference) at the corners, times the area. To compute the volume: 1- draw a line between the cut and the fill areas 2- compute the total volume of all the complete cut squares, do the same for the fill, use the previous formula 3- Compute the incomplete squares separately and add them to the squares. 4- Compute the difference between the cut and the fill., pay attention to the expansion factor. 13

A B C 1 hA1 hB1 hC1 V1 = A * (hA1 + hB1 + hA2 + hB2) / 4 V2 =A * (hB1 + hC1 + hB2 +hC2) / 4 2 hA2 hB2 hC2 V3 = A* (hA2 + hB2 + hA3 +hB3) / 4 hA3 hB3 3 Total volume V = A* {(hA1 + hB1 + hA2 + hB2) / 4} + A* {(hB1 + hC1 + hB2 +hC2) / 4} + {A*(hA2 + hB2 + hA3 +hB3) / 4} = (hA1 +2 hB1 + hC1 + 2 hA2 + 3 hB2 + hC2 + hA3 + hB3) / 4

Example Corner A-1 B-1 C-1 D-1 A-2 B-2 C-2 Height +3.1 +2.8 +2.0 +4.0 The table below shows the heights of cut and fill in meters at the corners of a 20m grid. Compute the volume of soil to be imported or disposed. Assume 25% expansion factor for the fill. ( + is cut, - is fill) Corner A-1 B-1 C-1 D-1 A-2 B-2 C-2 Height +3.1 +2.8 +2.0 +4.0 +2.2 +1.5 Corner D-2 A-3 B-3 C-3 D-3 A-4 B-4 Height +1.2 +2.0 +1.7 +1.0 0.0 +1.5 +0.8 Corner C-4 D-4 Height 0.0 - 3.00