SUYAMA Masuo, FUJITSU LTD Estimates of Required Funding for Green Cable Development Phase.

Slides:



Advertisements
Similar presentations
University of Florida Hybrid Rocket Team’s Mile High Club
Advertisements

GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
DLS VERIFICATION TESTING FIELD TESTS TO CHECK DLS OPERATIONS.
DICOM Structured Reporting Workshop - March 2000 Structured Reporting and the IHE Year 2 Technical Framework Simon Wail, PhD Marconi Medical Systems.
The IRIS-Bus Concept for Seismic Instrumentation John D. West Arizona State University.
1 Challenge the future Subtitless On Lightweight Design of Submarine Pressure Hulls.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Funding And the Business Plan. Technology Development Costs – Functional requirements – Equipment Qualification Incremental Project Build Costs – Scale.
Scientific Method A series of steps designed to solve a problem or learn more about the world around you.
Chemistry An Introduction to General, Organic, and Biological Chemistry, Eleventh Edition Copyright © 2012 by Pearson Education, Inc. Chapter 6 Gases 6.5.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Selection of measuring instruments
Robotic Needle End Effector for Integration with CT Scan Team Members: David Sun Xuan Truong Chris Willingham Advisor: Dr. Bradford Wood.
Reverse Osmosis Lec. 9 Dr. Ola Abdelwahab.
Classification of Instruments :
Product Design and Qualification (Validation) Testing for HPHT Systems
Computational Methods for Management and Economics Carla Gomes Module 9d Network Models Maximum Flow Problem (Slides adapted from J.Orlin’s and Hillier’s)
Basic Chemistry Copyright © 2011 Pearson Education, Inc. 1 Chapter 11 Gases 11.5 Temperature and Pressure (Gay-Lussac’s Law) An autoclave used to sterilize.
IceCube System Testing
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
Copyright © 2009 Pearson Education, Inc., publishing as Benjamin Cummings Life Functions— What the body is built for 1.Maintain boundaries 2.Movement 3.Responsiveness.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
23 rd World Gas Conference 5 – 9 June 2006 Amsterdam Full Scale Qualification Trials and Certification of the AMPLITUDE-LNG LOADING SYSTEM Phillip COX.
FNAL Meeting, July 2006 Basti, Bedeschi, Raffaelli, INFN-Pisa 1 ILC cryomodule mechanical work at INFN-Pisa  Ongoing work  Near term future  Manpower.
Success depends upon the ability to measure performance. Rule #1:A process is only as good as the ability to reliably measure.
2003B6. A diver descends from a salvage ship to the ocean floor at a depth of 35 m below the surface. The density of ocean water is x 103 kg/m3.
Proposal for new Working Group Item: Core Router Software Accelerated Life Testing (draft-poretsky-routersalt-term-00.txt) Authors: Scott Poretsky, Avici.
D2-01_08 Approaches to Smart Grid Communications Networks in Japanese Electric Power Companies Naomasa Takahashi Kyushu Electric Power Co., Inc. Japan.
General, Organic, and Biological Chemistry Copyright © 2010 Pearson Education, Inc.1 Chapter 7 Gases 7.5 Temperature and Pressure (Gay-Lussac’s Law)
Green Cables for ocean and climate monitoring and disaster warning Erica Campilongo, ITU.
Green Systems: Wet Demonstrator Stephen Lentz Director of Network Development.
Green Systems: Science & Engineering Stephen Lentz Director of Network Development.
Reporter: Hsieh, Tsung-Lin. Question A wire with weights attached to each end is placed across a block of ice. The wire may pass through the ice without.
Introduction Transportation is necessary to:
March 8, 2005 Calibration and Operation of the Stepped Frequency Microwave Radiometer during the 2005 Hurricane Season Ivan PopStefanija
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
© Copyright 2005 TEM Consulting, LP - All Rights Reserved Presentation To EAC Aug. 23, 2005 Hearing, Denver, CORev 1 – 08/16/05 - HSB Considerations In.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
6.Temperature Transducer:- Temperature transducers can be divided into four main categories. 1. Resistance temperature detectors (RTD). 2. Thermocouples.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
MET253 Measurements in Biomedical Instruments. MEASUREMENT  Defined as 1. The process of numerical evaluation of dimension. 2. The process of comparison.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
PROCESS DESIGN DEVELOPMENT
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
Wet Demonstrator Objectives. 2 A Brief History Functional Requirements First DraftJuly 2014 Wet Demonstrator Scope First DraftJuly 2014 Singapore Workshop.
Oyungerel Uvgunkhuu Senior Officer of Volume Standard Laboratory Metrology Department Tel: , Fax
Mechanical strain measurements on MQXFS1 Magnet using CERN system M.Guinchard and P.Grosclaude European Organization for Nuclear Research (CERN) 27 April,
Basics of Specification Writing. Extract from 1997 audit:  A well-written specification can do more to assure success of the acquisition effort than.
Basics of Specification Writing. Extract from 1997 audit:  A well-written specification can do more to assure success of the acquisition effort than.
THERMAL TESTS SCI-ALL. INTRODUCTION GOAL OF THE EXPERIMENT: Check thermal behavior of allcomp and scientific samples and compare the results. System:
S A Griffiths CM42 June 2015 Electrical & Control.
MECH 373 Instrumentation and Measurement
Optical lever lasers - To Fix or Not to Fix!!
IceCube System Testing
1 2 3 INDIAN INSTITUTE OF TECHNOLOGY ROORKEE PROJECT REPORT 2016
A presentation on Measurement of Winding Resistance and Insulation Resistance of 3 Phase 11 kV/ 433 V, 16KVA Oil cooled type Transformer PRESENTED BY:
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Tsunami Detection? April 2016.
Teleconference ACS – FREIA 31st October 2017
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The feasibility of Measuring Abyssal Ocean Temperature with Thermometers Embedded in the Trans-Ocean Communication Cables David Murphy, Bruce Howe, Roger.
EET 323 – Electrical System Design Lecture 4: Wiring Devices
Carrying out Practical Tasks
Assignment Workshop 2 16th September 09, Solihull.
Basic Chemistry Chapter 11 Gases Chapter 11 Lecture
Design Of Experiment Eng. Ibrahim Kuhail.
Measurement Basics Chapter 13.
Presentation transcript:

SUYAMA Masuo, FUJITSU LTD Estimates of Required Funding for Green Cable Development Phase

Objective 2Copyright 2013 FUJITSU LIMITED International standardization is necessary to provide the same utility regardless of supplier. (Proposal Eng Functional Specs_Phibbs -draft_31 July 2013 to be shared with JTF_vcm1.docx) To provide the same utility regardless of supplier, we would like to propose a verification test for the comparison of observation characteristics among the suppliers.

Development Phase of Green Cable 3Copyright 2013 FUJITSU LIMITED Finalization of Green Repeater Spec. Modification of Repeater Verification Tests Sensor requirements - Water temperature, - 3-axis acceleration, - Pressure Functional and performance requirements, etc. Green Cable Development Phase Verification Tests - Participation of potential vendors to minimize cost and share external fund. - Continuous observation in a stable atmosphere such as on the ocean floor. - Comparison of obtained continuous data to check the utility among the suppliers. - Mechanical deployment check using cable ship (Sea Trial).

Verification Test 4Copyright 2013 FUJITSU LIMITED Dummy units Observation Instruments Through fibers Thermometer Pressure Gauge 3 - Axis accelerometer Fibers for the instruments Power feeding conductor Configuration - Three sensors are equipped - Dummy units are to be included instead of repeater units to reduce cost and fiber pairs. B C D A Supplier A Supplier B Supplier C Supplier D End Box Terminals PWR

Testing Configuration Options 5Copyright 2013 FUJITSU LIMITED ConfigurationTest PeriodAdvantage / Disadvantage 1. Short-haul Observation Cable (e.g., using a retired cable) Long e.g., 1 year The most appropriate condition Long stability check available Higher cost 2. Sea Trial (using cable ship) Short e.g., 1 week Appropriate condition Mechanical deployment check 3. Using the Cable Tank in Cable Factory or Cable Depot Long e.g., 1 year Economical solution It may be hard to keep the stable atmosphere. 4. Using the place with Constant Temperature, such as abandoned mine Long e.g., 1 year Economical solution (without cables) Terminal Cable Tank Cable ship

Rough Order of Magnitude 6Copyright 2013 FUJITSU LIMITED ItemsConditionSub-Total Repeater Modification1M x 5? suppliersUSD 5 M Cables, System Assembly and TestTotal 100 kmUSD 3 M Load & LayingDepends on the locationUSD 3-5 M Testing including Test Equipment5? suppliersUSD 5 M ContingenciesUSD 2 M TotalAbout 20 M$ ROM for Development Cost with Sea Trial External funding is expected.

Conclusion 7Copyright 2013 FUJITSU LIMITED The following conditions shall be specified for more accurate cost estimate. Green Repeater Spec. - Sensors - Function and performance Development Process - Requirements for the modification - Verification tests; Items, How to perform, etc. We have proposed verification test and shown ROM for Green Cable development phase.

Thank you