The Future of Ocean Innovation. The Future of Ocean Innovation | 2 Submarine Cable. Why are we here? Using Makai software to reduce risk & cost of subsea.

Slides:



Advertisements
Similar presentations
Kapil Mohan Sharma DMG - QA
Advertisements

THAI TOKO ENGINEERING CO.,LTD.
PV String Monitoring Solution
© 2006 FedEx. All rights reserved. FedEx Ship Manager ® at fedex.com Shipping Administration.
Atyrau Oil and Gas Event
Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
Created by Terri Street; inspired by the work of Jennifer Wagner; revisions courtesy of Stephanie Novack. © 2000, 2009 Background images courtesy of abc.com.
1. International Module – 503 Noise: Measurement & Its Effects Day 5.
Slide 1 Insert your own content. Slide 2 Insert your own content.
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 20 Slide 1 Chapter 20 Software Testing.
Quest ion 1? A.) answer B.) answer C.) correct answerD.) answer L C.) correct answer F.
2010 HPRCT Presentation – Optimized Human Error Evaluation June 23 rd, 2010 Presenter: Terry J. Herrmann, P.E. Associate, Structural Integrity Associates.
Environmental Stewardship IMO standards: - Oily Waste Pollution Prevention Management - Add-on equipment to existing PPEs Wednesday, 9 December 2009.
By Rick Clements Software Testing 101 By Rick Clements
Copyright CompSci Resources LLC Web-Based XBRL Products from CompSci Resources LLC Virginia, USA. Presentation by: Colm Ó hÁonghusa.
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
+ Agricultural Risk Management Team Agriculture and Rural Development Department The World Bank WMO Expert Advisory Group on Financial Risk Transfer (EAG-FRT.
SAT3/WASC/SAFE – Public / Private Global Partnership
0 - 0.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Editing Instructions Simply add a question and 4 possible answers by overtyping the white text. The green box on the next slide shows which answer should.
Evaluation of Distributed Security Systems Server Modules Peak Workload Sergey ANCUD Ltd.
Aberdeen - A World Energy City Elaine Robertson Business Growth Manager
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013
Critical Infrastructure
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Safe Work Practices WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
eGenKit Remote Monitoring Solution
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Surface Drive System (SDS)
2005 Operating Review & 2006 Strategy outline January, 2006 China Oilfield Services Limited.
Insert image here © SPEC-Soft SAVINGS AND EXPERTISE FOR YOUR PLANT PFS-Suite Life-cycle Tools For Process Automation PFS-Suite TM.
©2011 Check Point Software Technologies Ltd. [PROTECTED] All rights reserved. 3D Security Analysis Report Tool.
Sofient Solutions SCF-86, 2 nd Floor, Phase XI, Mohali (Punjab) Phone No: , Sofient Works Appliance
Chapter 7 Process Management.
Advanced Lustre® Infrastructure Monitoring (Resolving the Storage I/O Bottleneck and managing the beast) Torben Kling Petersen, PhD Principal Architect.
Effective Engineering April 2002, Burbank, CA 1. Effective Engineering April 2002, Burbank, CA 2.
SEMINAR ON SUB-MARINE CABLE PROJECT IN BANGLADESH Presented By: Engr.M.Monwar Hossain (G.M, BTTB) Chief Guest:Prof.Dr.M.Anwarul Azim (Vice-Chancellor,DUET,Gazipur.)
MAN Design Last Update Copyright Kenneth M. Chipps PhD 1.
Underwater Mining Solutions
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
PMO-III, March 2006, Hamburg, Germany. Other PMO Activities.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
Energy Huntsville Opportunity Report August 2012 Steve Reed
Member Training ALARM South East - November 2007 Abigail Simpson and Bob Ellison.
1 Creating a Data Backup Oakland University University Relations Updated - June 2006.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
X-box Factoring. X- Box 3-9 Product Sum Factor the x-box way Example: Factor 3x 2 -13x (3)(-10)= x 2x 3x 2 x-5 3x +2.
„No company has either the time or the resources necessary to learn only from its own mistakes”. James Harrington.
Managing Director, HVPD Ltd
AN INTRODUCTION TO MARITIME TECHNICAL AND COMMERCIAL SOLUTIONS DEC 2014 Viking Marine Services FZC, PO Box 50349, Fujairah, UAE Ph: / Mob:
Sound Ocean Systems, Inc. Engineering Capabilities Brief.
Claire Gibson, Wave Hub General Manager 19 February 2013
AN INTRODUCTION TO MARITIME TECHNICAL AND COMMERCIAL SOLUTIONS JUNE 2015 Viking Marine Services FZC – P.O.Box 50349, Fujairah U.A.E.
AquaRET 2 LEONARDO DA VINCI - Transfer of Innovation AquaRET 2 Online Survey results Bilbao, 05/10/2010 E. Mavrou Environmental Scientist, MSc CRES - Greece.
King Fahd University of Petroleum & Minerals
MyTEq provides organization and answers  Equipment availability and location  Equipment calibration status  Calibration certificate …FAA is here! 
June 2011_ M. DEL BRENNAProperty of Prysmian SUBMARINE CABLE INSTALLATION Data required for effective design 13° Meeting of Marine Observation and Data.
Business Plan Your Proposed Company Name Here. Mission / Purpose of Your Business Give an overview here.
Green Systems: Wet Demonstrator Stephen Lentz Director of Network Development.
Ship Protection Measure against Piracy. P-Trap® Awards 2011 WINNER – Safety at Sea International Awards (Category: Security) by IHS Fairplay SHORTLISTED.
© 2009 Level 3 Communications, LLC. All Rights Reserved. Level 3 Communications, Level 3, the red 3D brackets and the Level 3 Communications logo are registered.
Making the System Operational Implementation & Deployment
Issue Date: October 2014 © 2014 International Cable Protection Committee Ltd International Cable Protection Committee AN INTRODUCTION TO.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Quality Management Checklist An essential guide to assist you, the quality expert, in enforcing the standards you expect on a daily basis across the whole.
An introduction to maritime technical and commercial solutions
Charging in the right places
Making the System Operational Implementation & Deployment
Value of Trending: Application Exercise
Value of Trending: Application Exercise
Presentation transcript:

The Future of Ocean Innovation

The Future of Ocean Innovation | 2 Submarine Cable. Why are we here? Using Makai software to reduce risk & cost of subsea cable installation process Outline Who are we? Who are we? Subsea cable experience Subsea cable experience Typical cable installation problems Typical cable installation problems Makai products and solutions Makai products and solutions

The Future of Ocean Innovation | 3 Submarine Cable Who is Makai? Founded 1973, Located in Hawaii Founded 1973, Located in Hawaii Innovative Technology Company: Innovative Technology Company: Ocean Renewable Energy Ocean Renewable Energy Submarine Cable Software Submarine Cable Software Visualization Software Visualization Software Ocean Engineering/R&D Ocean Engineering/R&D Ocean Renewable Energy Visualization Software Submarine Cable Software Ocean Engineering / R&D

The Future of Ocean Innovation | 4 Submarine Cable Intro Movie Clip

The Future of Ocean Innovation | 5 Submarine Cable Submarine Cable Experience 27 years of experience on submarine cables 27 years of experience on submarine cables Over 400,000 km of cable installed Over 400,000 km of cable installed 75% of telecom installation ships have Makai Lay 75% of telecom installation ships have Makai Lay 95% of the telecom subsea cable route planning is done with MakaiPlan 95% of the telecom subsea cable route planning is done with MakaiPlan

The Future of Ocean Innovation | 6 Submarine Cable Cable Control Software Standard Installed in 32 vessels Installed in 32 vessels – SubCom – Alcatel – Global Marine Systems Ltd. – Elettra – NTT-WEM – Mitsubishi – Asean Cableship Ltd. – FairfieldNodal – International Telcom Group – Dockwise – Solstad – SAIC – L3-MariPro – U.S. Navy

The Future of Ocean Innovation | 7 Submarine Cable Cable Installation Phases Reducing risk requires: Thorough route planning Thorough route planning Proper installation planning & operator training Proper installation planning & operator training Correct response to changing at-sea events Correct response to changing at-sea events

The Future of Ocean Innovation | 8 Submarine Cable Makai Products At-sea Installation Monitoring and Control Route Planning Installation Planning & Operator Training

The Future of Ocean Innovation | 9 Submarine Cable

The Future of Ocean Innovation | 10 Submarine Cable How do we know it works? Calibration and Testing is only viable proof Calibration and Testing is only viable proof Makais software extensively tested and calibrated Makais software extensively tested and calibrated US Department of Energy At-Sea Tests US Department of Energy At-Sea Tests US Navy At-Sea Arrays US Navy At-Sea Arrays Commercial applications and success (over 400,000 km of cable installed) Commercial applications and success (over 400,000 km of cable installed) Performance Calibration

The Future of Ocean Innovation | 11 Submarine Cable Precision Calibration

The Future of Ocean Innovation | 12 Submarine CableConclusions Open ocean deployment operations will never be free of risks. Unplanned events such as equipment failures, human errors and rapidly changing weather and sea conditions are difficult to predict and avoid. Open ocean deployment operations will never be free of risks. Unplanned events such as equipment failures, human errors and rapidly changing weather and sea conditions are difficult to predict and avoid. The best protection from failure is thorough pre-planning and use of the best at-sea tools and equipment available. The best protection from failure is thorough pre-planning and use of the best at-sea tools and equipment available. Real-time deployment control systems provides the cable owner, insurer, and the installer with the peace of mind that the installer has the capacity to deal with these at-sea risks and prevent costly mistakes which ultimately affect the reputation and bottom line of everyone involved. Real-time deployment control systems provides the cable owner, insurer, and the installer with the peace of mind that the installer has the capacity to deal with these at-sea risks and prevent costly mistakes which ultimately affect the reputation and bottom line of everyone involved.

The Future of Ocean Innovation | 13 Submarine Cable +1(808) PO Box 1206 Kailua, HI 96734, USA Thank You!

14