10/24/2003Yu Chul Yang(CHEP,KNU) Layer0 Prototype Test Abstract,,,,,,,, Shabeer Ahmad Mian( ),,,, ( ),,, ( ). We have carried out prototype test for Silicon.

Slides:



Advertisements
Similar presentations
LHCb Velo Construction Authorisation steps Tony Smith.
Advertisements

Peter Shanahan – Fermilab1 (MINOS NearDet) Electronics Overview A heuristic, pedagogical introduction.
Objectives Regression analysis Sensor signal processing.
Fermilab PAC Meeting, April 12-14, M. Demarteau Slide 1 Fermilab PAC Meeting April 12, 2001 Marcel Demarteau Fermilab Status and Scope DØ Run 2b.
10-Nov-2005US ATLAS Tracking Upgrade Santa Cruz 1.
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Module design for B-layer replacement V.1. Bare Module dimensions mm Active area mm mm Footprint mm stack 200um chip 20um bumps.
1  Total power is 50 kW of which 50% are dissipated in cables ATLAS SCT powering issues  SLHC tracker will require even more channels and thus more cables,
2 nd International Conference on Technology and Instrumentation in Particle Physics Chicago June 8 th – 14 th 2011 Operational experience and aging studies.
10/09/2002IWoRID; Niels van Bakel1 A collaboration between the ASIC-lab Heidelberg, NIKHEF Amsterdam and the University of Oxford Beetle; a front-end chip.
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Stephanie Majewski Stanford University
Silicon Stripixel Detector Junji Tojo RIKEN Vertex2005 Lake Chuzenji, Nikko, Japan November 7-11, 2005.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
Gerd J. Kunde - LANL1 The FVTX Technology  Outline Overall Picture Silicon Detector –Geometry, Layout, Process Readout Chip –FNAL Chips, New Chip PHX.
Marc Weber Rutherford Appleton Laboratory Bob Ely, Sergio Zimmermann, Paul Lujan LBNL Rong-Shyang Lu Academia Sinica Taiwan Shielding and Electrical Performance.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
1 G.Pessina, RICH Elec Upg, 11 April 2010 Analog Channels per chip4 to 8 Digital channel per chip4 to 8 Wire-bond pitch (input channels) Input capacitance.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
10/24/2003Yu Chul Yang(CHEP,KNU) Accelerator & Detector 1.Accelerator 2. Tevatron 3. Detector 4. CDF Detector.
-1-CERN (11/24/2010)P. Valerio Noise performances of MAPS and Hybrid Detector technology Pierpaolo Valerio.
A Prototype Diamond Detector for the Compton Polarimeter in Jefferson lab, Hall C Medium Energy Physics Group Amrendra.
Status of Stripixel Sensor + SVX4 Test Junji Tojo RIKEN VTX Meeting June 1 st, 2004.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
Dzero Collaboration Meeting, Sept. 14, M. DemarteauEric Flattum - Fermilab 1 Slide 1 Alice Bean Fermilab/University of Kansas for the D0 Run2b silicon.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
The Collider Detector at Fermilab (aka CDF) Jennifer Pursley Intermediate Seminar Oct. 28, 2003.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Nicola Bacchetta September 24, 02 DOE review1 Baseline Readiness Review September 24, 2002 Nicola Bacchetta INFN-Padova and Fermilab Run IIB Silicon Project.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
SVD FADC SVD-PXD Göttingen, 25 September 2012
Adapting the via last Design
Upgrade of the ATLAS MDT Front-End Electronics
SIT AND FTD DESIGN FOR ILD
Vertex Detector Overview Prototypes R&D Plans Summary.
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

10/24/2003Yu Chul Yang(CHEP,KNU) Layer0 Prototype Test Abstract,,,,,,,, Shabeer Ahmad Mian( ),,,, ( ),,, ( ). We have carried out prototype test for Silicon detector for CDF experiment. Silicon Detector is important to detect B quark-jet. And Signal/Noise determines lifetime of the detector in a harsh radiation environment. Thus we carry out tested signal/noise at the prototype for Layer0 of Silicon detector.

10/24/2003Yu Chul Yang(CHEP,KNU) Introduction Outer Barrel The new detector SVXIIb has 6 layers with 2 barrels in z, each 66cm long. Sensors Hybrids Sensors Cables Hybrids Inner Layer(Layer0) Two sensors are bonded together to form a single readout unit. Fine pitch cables connect the sensors to the hybrids (2- chip). Sensors are cooled by coaxial tubes in the carbon fiber support structure. Layer 0: 12 fold Axial Layer 1: 6 fold Axial-Stereo (90 o ) Layer 2: 12 fold Axial-Stereo (90 o ) Layer 3: 18 fold Axial-Stereo (2.5 o ) Layer 4: 24 fold Axial-Stereo (2.5 o ) Layer 5: 30 fold Axial–Stereo (90 o )

10/24/2003Yu Chul Yang(CHEP,KNU) Stave / Layout details 2 sensors + 1 hybrid = 1 module 3 modules per side Modules linked by embedded bus cable and readout token passing scheme 2 sided – axial/stereo or axial/axial 1 Mini-Port Card /stave Total length 66 cm 3072 channels /stave(128*4*3*2)

10/24/2003Yu Chul Yang(CHEP,KNU) 128-channel ADC (analog to digital converter) chip - Wilkinson type 8-bit ADC - Dead-time less Front-End : acquisition Back-End : digitization/readout - Low Power : 2.5V Signal/Noise 30% better than SVX3 SVX4 Chip / Block diagram

10/24/2003Yu Chul Yang(CHEP,KNU) Prototype L0 & Stave in FCC Layer0 - Silicon sensor - Cable - Hybrid(2 SVX4 chip) Stave - Silicon sensor - Hybrid(3*4 SVX4 chip) - MPC

10/24/2003Yu Chul Yang(CHEP,KNU) Signal-to-Noise Ratio S/N Collected charge usually given for Minimum Ionizing Particle(MIP) But there is Noise - Capacitance - Leakage Current - Thermal Noise Radiation Damage severely degrades the S/N. Thus S/N determines lifetime of the detector in a harsh radiation environment. => We tested S/N of Layer0.

10/24/2003Yu Chul Yang(CHEP,KNU) How to Test Setup - High Voltage(100V) : Silicon sensor - Low Voltage(2.5V) : SVX4 Chip - Vcal(160mV) : PMC (Injection Charge) Test of Layer0 - Test : svxdaq (B/W, Vcal, H/V) in FCC - Make Plot : makePlot and ROOT Injection charge - different Pedestals Chip + Cable + Two SiliconChip + Cable(broken wirebond)

10/24/2003Yu Chul Yang(CHEP,KNU) Linearity Test of SVX4 Chip

10/24/2003Yu Chul Yang(CHEP,KNU) Layer0 Prototype Test B/WADCe - /ADC Charge Injection Vcal = 160mV (ADC) 160 mV * 25 fF = 4.00 fC = 25,000 e-

10/24/2003Yu Chul Yang(CHEP,KNU) 1. Chip only 2. Chip + Cable 3. Chip + Cable + Two Silicon 4. Chip + Cable + One Silicon Chip only w/ cable w/ 2 silicon w/ 1 silicon ADC(Vcal:160mV) Different configuration L0

10/24/2003Yu Chul Yang(CHEP,KNU) Two layers modules with different cables. The estimation from dnoise measurement shows similar capacit- ance (22pF for Keycom and 18.8pF for Dyconex) Keycom cable Dyconex cable Different Cable of Layer0 Dnoise = 400 e- (Chip) + 40 e-/pF * C pF (Cable) + 16 pF * 40 e-/pF (2 Sensor)

10/24/2003Yu Chul Yang(CHEP,KNU) References 1) SVX4 User s Manual, L.Christofek, …, may 22, 2003 ( 2) The New Silicon Detector at Run b, Anadi Canepa, ( 3) The CDF runiib Silicon Detector Technical Presentation, Nicola Bacchetta ( Conclusion 1. Signal(ADC) Vs Vcal(V) relation is linear. 2. Different configuration test of Layer0 (Signal/Noise) => Chip+Cable+Silicon < Chip+Cable < Chip 3. Different Cable test of Layer0 (Noise) => Dyconex cable noise is smaller than Keycom.