BACKGROUND: We are finding an increase in instances where the available fault current at underground (UG) 1-phase residential service entrance equipment.

Slides:



Advertisements
Similar presentations
Control Circuit Protection Supplementary Protectors vs
Advertisements

Electricity Merit Badge
An Electronic Device, and also a Action Hero…
4 Wiring Systems. 4 Wiring Systems Objectives Know where to find codes and authorities for an installation. Recognize the marks of the most popular.
Using Electricity in the Home
Digital Current Transformer Reporter
UNIT 31 HOME ELECTRICAL SYSTEM
Basic Electricity.
Chapter 12 Transformers. Chapter 12 Transformers.
 E4 Electrical Installation #1 Power Distribution.
PUMP STATION ELECTRICAL DESIGN
Inspecting Electrical. Inspection Includes:  Service entrance & masthead  Main panel and subpanels (if any)  Branch circuit wiring  Junction boxes,
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
{. Let one of our dedicated Service Trucks come to help you with your electrical needs.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
EET Survey of Electronics
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Electrical Power Systems
Domestic Installation: Switch Circuits
Three Phase Power Three Phase Motors
Residential Wiring By: Ing. Hector M Lugo-Cordero, MS 03/25/2009.
Panels and Subpanels. Main Service Panel aka Load Center The Load Center is the heart and soul of a home’s electrical system. It: – Serves as a distribution.
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
 E4 Electrical Installation #2 Wire Sizing and Materials.
Interconnect Protection of Dispersed Generators
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
Chapter Twenty One: Electrical Systems
Electrical Installation 2
Electrical Contractor
Electrical Power J. Mitchell for AE-210. What Does Electrical Power Do? Provides Energy for Buildings Provides Energy for Buildings Usually all except.
COMMERCIAL ELECTRICAL (Chapter 11)
1 INTRUSION ALARM TECHNOLOGY POWER SUPPLIES. 2 INTRUSION ALARM TECHNOLOGY Security systems shall have a primary power source and a secondary power source.
Electrical Materials Continued. Powering your home Homes in Ontario now have Smart Meters, these meters keep track of how much you use and when. The idea.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
1 Air Conditioning Breaker Panels and Disconnects.
Oncor Electric Delivery Study on Residential Electric Vehicle Charging SWEDE Conference 2012 Ron Shipman.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
ELECTRICAL SYSTEMS. Chapter Twenty One: Electrical Systems  21.1 Series Circuits  21.2 Parallel Circuits  21.3 Electrical Power.
ELECTRICAL FIRES CAN BE PREVENTED! By PowerCheck.
Electrical Materials.
SERVICE ENTRANCE EQUIPMENT
E4 HVACR Electrical Installation
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
DOMESTIC ELECTRICAL CIRCUITS National Diploma Mechanical and Electrical Services Construction.
ELECTRICAL INSTALLATION IN BUILDING
Residential Wiring Unit 3 – Installation and Planning.
ELECTRICAL INSTRUMENTS ( service and utilization )
N.E.C. Installation Techniques and Common Violations
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
Automatic Transfer Switches
E4 Electrical Installation
Electrical Engineering for Physicists How to get from the 208 VAC 3-phase power in the building to 110- and 220-VAC Code issues All work must be done in.
Sub Station.
E4 HVACR Electrical Installation
E4 HVACR Electrical Installation
Distribution Feeder Voltage Regulation and Control
E4 Electrical Installation
AFCI Protection: AFCI Receptacles and the NEC
Ampacity Calculations and Overcurrent Protection 1
Calculations: Transformers and Service Conductor Calculations
Overcurrent Protection— Fuses and Circuit Breakers
EET 323 – Electrical System Design Lecture 9: Grounding
EUSERC Training May 2017 Connecting Single phase 3 wire invertor to 3phase 4 wire utility service. Lessons learned - Customer Owned Interconnected Generation.
State Electrical Division North Carolina Department of Insurance
Calculations Review Drill
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
Presentation transcript:

BACKGROUND: We are finding an increase in instances where the available fault current at underground (UG) 1-phase residential service entrance equipment is exceeding 10,000 amps (10 kA) fault current that is a safety concern. Underground Residential Single Phase Service Entrance Fault Current exceeding 10,000 amps The reasons the available fault current at underground (UG) 1-phase residential service entrance equipment is currently exceeding 10,000 amps (10 kA) are: UG Secondary Size: Load growth has increased typical UG secondary cable size to #4/0 AL & #350 AL that increases fault current. UG Secondary Length: Smaller lots (shorter secondary cable runs from the transformer to the service entrance) increases fault current. Transformer Size: Design practices have increased typical UG transformer size to 50 kVA due to cost saving and increased loads, increases fault current. Transformer Impedance: Lower impedance transformers that address flicker problems cause an increase in fault current. The table on the right shows the minimum length of secondary cable to limit 120V & 240V fault current to 10 kA with consideration of upgrading transformer for future load growth.

OPTIONS: The options we have considered to address limiting the fault current to 10,000 amps in underground residential 1-phase service entrance equipment are: A) Extending Secondary Cable Length: Utilities could extend the secondary cable length by coiling up the cable at the property line. Concerns and limitations are: Difficulty locating and marking the cable at coiled location. Difficulty repairing a cable failure or cable cut at the coiled location. Utilities Field Engineering and Crews would not know the minimum length of cable to be coiled since the meter location would not be known at time of design or secondary cable stub installation. Licensed Utility Cable Installer (LUCI) could extend the secondary cable length by running a longer trench. Concerns and limitations are: Difficulty locating and marking the cable location. It would be the LUCIs responsibility to determine the minimum required length of cable to install since Utilities Field Engineering would not know the meter location at time of design. Difficulty inspecting and enforcing the minimum length of cable. Cost of adding extra length of cable and trenching. Underground Residential Single Phase Service Entrance Fault Current exceeding 10,000 amps

OPTIONS: B) Reduce Secondary Cable size: Utilities could reduce the secondary cable size from #4/0 to #1/0 on short service runs. Concerns and limitations are: #1/0 AL will not work for a 200 amp service in duct. #1/0 AL Triplex has a ampacity of 215 amps (direct buried) and of 160 amps (in duct). If installing a 50 kVA transformer with #1/0 AL Triplex the minimum length of cable to limit fault current to 10 kA is 45 and could be a problem. Utilities Field Engineering would not know the length of cable since the meter location would not be known at time of design. C) Current Limiting Fuses (CFL) on Secondary Cable within Transformer: Utilities could install current limiting fuses on the secondary cable within the transformer compartment. Concerns and limitations are: This would add steps and time to the Troubleshooters ability to locate a secondary fault. How would Utilites Field Engineering and Crews determine which services to add CFLs since meter location would not been know at time of transformer installation. Cost of adding secondary CFLs. Underground Residential Single Phase Service Entrance Fault Current exceeding 10,000 amps

OPTIONS: D) Change metering to require a 22,000 amp Short Circuit Current Rating (22k SCCR) Meter with Main Breaker combination with either an All-in-One combination meter housing with main breaker load center or Metered Main combination meter housing with main breaker and a seperate sub panel load center: Utilities could require the use of an All-in-One Meter or Metered Main that is rated at 22k SCCR. Concerns and limitations are: Additional cost of All-in-One Meter or Metered Main vs. seperate meter socket and load center for electrician and contractors. Do we require all new services to install an All-in-One Meter or Metered Main due to the ability of Utilities Inspectors and Regional Building Department Inspectors to determine and enforce which services exceed the 10 kA fault current and will require the All-in-One Meter or Metered Main enclosures. Underground Residential Single Phase Service Entrance Fault Current exceeding 10,000 amps

PROPOSAL: We propose to change our metering standard to require all new underground residential single phase services to install either an All-in-One Meter socket with Load Center or a Metered Main socket with main breaker and seperate sub panel Load Center. Underground Residential Single Phase Service Entrance Fault Current exceeding 10,000 amps All-in-One and Metered Main Meter Solution: Allows up to 22 kA fault current that eliminates problem with exceeding 10 kA fault current. Allows for future transformer upgrades due to load increase (Example: Electric Cars) Provides Fire Department with an outdoor disconnect. Table below shows a rough cost comparison based on online costs at Home Depot or Lowes department stores.

Underground Residential Single Phase Service Entrance Fault Current exceeding 10,000 amps Metered Main with Sub Panel All-in-One Metered Load Center