DHRUVA SHIPPING CONSULTATS AND SERVICES PVT. LTD.

Slides:



Advertisements
Similar presentations
PRS PRS Engineering Consultants. PRS Learn about us in easy steps! Learn Understand Hire Profit!
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Testing Medical Devices A Brief Overview © 2005 Max Cortner. Copying and distribution of this document is permitted in any medium, provided this notice.
Training Presentation
Hydronic Balancing Balancing Valves
Best Practices for an Owner Estimating Organization
2. Computer Aided Design and Production Process Assoc.Prof.Dr. Ahmet Zafer Şenalp Mechanical Engineering.
Chapter 2Test Specification Process. n Device Specification Sheet – Purpose n Design Specification – Determine functionality of design n Test List Generation.
EQUIPMENT VALIDATION.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
Lesson 4 Manning of Vessels.
S88 structure used in system configuration
TECHNICAL TRAINING 2008.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Hydraulics.
Integrated Navigation Systems
Palletizing the Easy Way
Classification of Instruments :
IR-CAP Condition Assessment Program Indian Register of Shipping.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
Computer Process Control Application. Computer process control In computer process control, a digital computer is used to direct the operations of a manufacturing.
Goal: Understand the stages in design process and the role of computer aided design. Objectives: After this chapter, you should understand the following.
Lecture 1 Water Distribution Systems
Why digiORB ?  One of the areas where deficiencies are most pronounced during Port State Control and 3rd Party inspections is Oil Record Book  The current.
Barry's Advanced Construction of Buildings, Second Edition, by Stephen Emmitt and Christopher A. Gorse. © 2006, 2010 by Stephen Emmitt and Christopher.
Manufacturing Process GLOBOSE Manufacturing Process Details Globose Systems and Solution Pvt,. Ltd.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
Innovative Mooring & Fendering Technology for the Sea Base Dave Liese, PMS 325 Joint Sea Based Theater Access Workshop Duck, NC 8-11 February 2005 Draft.
AP210: Electrical/Electronics PCA Design Information Physical Component Placement Bare Board Geometry Layout items Layers non-planar, conductive & non-conductive.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
- Overview about Malaysia oil and gas - level of realism to traditional drawing (2D dwg) - Be able to store huge amount of data referring. - Single source.
Calibration PT Honeywell Chapter 7 InstrumentationELC-213Today Presentation by Clifford T. Johnson, PE, Control Systems Engineer Honeywell Primer Auxiliaries.
Presented by Capt. N. Padhi, Safety & Quality Manager, MTM Ship Management Pte Ltd., Singapore.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings.
Bilge Pumping Systems General Locations.
INTEGRATED APPROACH FOR STRUCTURAL ENGINEERING FROM CONCEPTUAL DESIGN TO FABRICATION SANJAY KUMAR ARORA MANAGER – CIVIL, PEM, BHARAT HEAVY ELECTRICALS.
Navigation NAU 102 Lesson 28. Current Sailing The horizontal movement of the sea surface. Current Expanded Definition All factors that cause a ship to.
ME444 ENGINEERING PIPING SYSTEM DESIGN
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Lesson Two Ship Design. Contents Design essentials Design Procedure advances factors concepts requirements Detailed operation.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Installation of the T600 at Fermilab CSN2, September 22,
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Sprinkler Loads on Trusses Educational Presentation.
PROCESS DESIGN DEVELOPMENT
MISS. RAHIMAH BINTI OTHMAN
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
Process engineering Quality controls.
Lesson 4 Manning of Vessels.
Liquid LVs propellant consumption control terminal system
Chemical Engineering Drawing
GOVERNOR PREPARED BY,
Drawings Introduction to FIDIC - Drawings -.
How SCADA Systems Work?.
Traffic Control Plan Development Course
Benefits of Using Control and Automation Panels
SC1R Cold Box PDR Controls
Detailed Contents Estimation Purpose of Estimating
Detailed Contents Estimation Purpose of Estimating
Firefighting equipment
Piping and Instrumentation for Process Industries
Installation Binder / IRR – an example
Presentation transcript:

DHRUVA SHIPPING CONSULTATS AND SERVICES PVT. LTD.

Shipbuilding Process Discussion on Owner’s Technical Specification and Agreement. Basic Design and Detailed Design. Class Approval for all Hull/Electrical/Piping drawings and designs Production Drawings ground level working Indenting of machinery according to Specs & Class Requirements Finalization of P.O. Unit/Block wise Production Process. Pre-Commissioning checks of Various System Commissioning of Various System Basin Trial Sea Trial AS BUILT drawing Preparation

Shipbuilding Process Owner’s Technical Specification Approved structural drawings and designs Indenting of machinery according to Specs & class requirements Finalization of P.O.

Preparation of working drawings SLD IWD TRAY & HANGER LAYOUTS Penetration layout Cable schedule Trial Protocol Signal Interfacing Drawings Production According to working drawings

Pre-commissioning Checks for Electrical System Calibration Of Instrumentation Cable Continuity Testing & Termination Checking Cold Checks for Various Systems Insulation test of Motors and Alternators P/R switches Temp Switches Electrical Test and Trials Sea Trials Basin Trials Generator Trials All alarm checking Main Switch Board Testing etc.. UMS – Notation Sea Trial Endurance Trial Speed Trial Steering & Maneuvering etc..

Electrical Hot work Drawings :- Cable tray and hanger layout:- This drawing gives dimensional details for fabrication of tray and hanger route on deck ceiling, bulkheads. Panel Disposition Drawing:- This drawing indicate all deck wise panel location throughout the ship, as well as for each panel we are providing drawing for all three views . Cable Penetration details/layouts:- This drawing indicate all deck wise Cable penetration dimensional details throughout the ship. Also we will take care of Hull Compensation required to be given near each Cable Penetration.

Case Study for Electrical hot work drawings No need to cross check with other activity of Hull, Piping, Ducting and Ventilation required. Very less amount of Rework in Hot Work Stage for Cable Tray and Hanger By using this drawing one can start Unit/Block wise Production Process simultaneously Collectively all this will increase the Production Rate. As we are reducing Rework Quantity. Wastage of material as well as Man hours can be saved. With the help of Cable Tray and Hanger layout Drawing and Panel Disposition drawing one can easily complete maximum amount of Hot Work Required for Cable Laying with reference to time factor. Each and every Panel “Seating Arrangement” can be fabricated separately as we are having for all three views dimensional drawings for that particular panel. Using this drawing we can calculate total quantity of cable penetration throughout the ship as well as deck wise quantity and we can easily keep track in this stage. Each and every Cable Penetration can be fabricated separately as we know the exact quantity and dimension for each penetration. With the help of Cable Tray and Hanger layout Drawing , Panel Disposition drawing and Cable penetration drawing one can easily calculate the shortest cable route for each system as well as total cable quantity required for complete ship cable laying.

Case Study for Master Cable List/ Total Cable Schedule This List specify all system wise Cable details and cable types throughout the ship. Each Cable will be given an Unique identification Tag, which is very easy to correlate. By using this List one can start Unit/Block wise Cable Laying Process simultaneously. Using Master Cable list we can easily keep track on various system cable laying process. In this list `Cable Type` is mentioned for every cable. One can estimate tentative cable quantities for various types of cables, this will avoid eleventh hour delay in cable laying One can avoid repeat cable laying easily. As in this list all cables are included so further rework in cable laying can be avoided. Master Cable List will make cable laying Stage very simple. Collectively all this will increase Unit/Block wise Production Rate. If the cable schedule is not available Cable laying process will not be uniform as, one has to find out cables to be laid from manufacturer drawings, production drawings, which is time taking activity and it leads to manual errors. Possibilities of rework are high, which disturbs correlated activity like accommodation ceiling clearance. You can not work simultaneously in all units / blocks as you don’t have “To-From” locations for the cables. Water tight glands/penetrations of the bulkheads may have to rework as no quantity of cables known initially. All it is going to affect pace of the project ultimately along with wastage of man hours and material.

Termination Details for Major Systems This drawing include cable`s core wise termination detail of both side of the cable for termination purpose. We prepare this drawings mainly for Main Engine, Propulsion System, DP System, Steering Gear System etc. This Drawing is very much helpful for ground level working people i.e. Production Engineer, Supervisor, Electrician ect. With this drawing, one can keep track on cable laying of respective system. This drawing show Inter Facing Cable and their termination details of both the end. i.e. Main Engine and Propulsion System Interface, Main Engine and Main Switch Board Interface. ect. These drawings will speed up panel termination work rate with accuracy. If the termination details for the system are not available If you say that these details are provide in manufacturer’s drawing, then yes but in their format it won’t helps to production purpose as manufacturer won’t consider other end of the system. Interface with other systems and in required sense is not mentioned. Not readable to unskilled or semi skilled labour e.g. Electricians.

Technical Specification Reading and Extraction of Electrical Points Technical specification reading and extraction of required points for each ship before starting production is very much important stage in New Shipbuilding. This will give you clear idea for Material Indenting. Some Special clauses/Owner Requirements will be noted down well before so that later delay can be avoided. In some layout drawing(E/R layout, W/H layout, Consoles layout)/ compartment arrangements owner`s approvals required, same can be noted down well advance.

Power Management System Power Management system is integrated system for generation and distribution plant. In which requirement of power is fulfilled with the combination of one or two generators. Also combination of generating plant, according to the mode of operations for e.g DP mode, Fi-Fi mode, Maneuvering mode , sailing mode etc. For this integrated system to work generation plant has to set accordingly, with the help of required instrumentation. Dhruva can work for the same to set the Power Management System.

Vessel Management System Vessel Management system is also an integrated system with so much of instrumentation and controllers , which comprises of central alarm system, pump and valve controls, tank gauging system, cargo handling system. As the system controls the whole ship through required instrumentation inputs, cable laying and termination quantum is high. Precommissioning checks are an important stage in such a system which can be taken over by Dhruva, which includes loop checking, calibration of sensors. Central alarm system for the ship is also included in this system, I/O list for which also can be prepared according to class requirements and owner’s specification ,loop checking of cables for the system can be done.

Dynamic Positioning System and FMEA Dynamic positioning system is a Supervisory controlled navigating system ,which maintains vessel position. In this system number of navigational equipments, propulsion systems, Power generation system are interfaced with each other. It requires substantial amount of cable laying. Loop checking for this system along with fulfilment of interface requirements can be carried out by Dhrua. Consultation regarding Failure Modes and Effect Analysis (FMEA).

AS BUILT drawing Preparation During hot work stages few onsite changes being done, same need to be incorporated in the respective drawing. During Commissioning and trials of the system some minor changes need to be done in the cable laying and termination. Same has to be incorporated in the respective system drawing before delivery of the ship. These drawings are very much helpful for next Sister ship.

THANK YOU www.dhruvashippingconsultants.com