Comparison of Return Iron from Jay Benesch’s Study

Slides:



Advertisements
Similar presentations
Final(?) Design of G0 Upstream Shielding Larry Bartoszek BARTOSZEK ENGINEERING 10/22/05.
Advertisements

Solid Edge IDF 3D Modeler
Mechanical Analysis of Dipole with Partial Keystone Cable for the SIS300 A finite element analysis has been performed to optimize the stresses in the dipole.
Richard Soluk – University of Alberta. The LHCb VELO Region R. Soluk --- University of Alberta --- MoEDAL Collaboration Meeting --- CERN June
Super KEKB Collaboration Meeting March 17-19, ‘091 iTOP PID Barrel/Mechanical Design Concepts Marc Rosen, University of Hawaii Outline iTOP concept Current.
Mar 31, 2005Steve Kahn -- Ckov and Tof Detector Simulation 1 Ckov1, Ckov2, Tof2 MICE Pid Tele-Meeting Steve Kahn 31 March 2005.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
Status report about the e-  identifier Study of shielding against the stray magnetic field at the downstream end of the spectrometer F. Huveneers, Gh.
CE En 112 Engineering Drawing with CAD Application
> >
The Hipped Roof – Part 2 Pattern Rafters M. Martin Original 2005 Reviewed 2006.
The printed circuit board (PCB) design
Unit 6: Geometry Lesson 7: Volume and Surface Area Learning Goal  I can determine the volume for various prisms, pyramids, cylinders, cones, and spheres.
MC Type-B fit up review1 Review of MC Type B assembly clearances reviewing A-to-B and B-to-C interfaces 3/1/07 Summary: Wing interfaces look okay between.
Cost of a Large Solid Scintillator Detector Jeff Nelson Fermilab.
Zhiwen Zhao (UVa), Paul Reimer (ANL) SoLID Collboration Meeting 2013/03.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Unit 3: Light.  Plane mirror- a smooth reflecting surface  Virtual image- images formed by a plane mirror. CANNOT be projected onto a screen  Real.
Lecture 21 For a long wire with current I, we have found at P, a distance r from the wire: B has a curly field pattern, it is into the page at P and out.
Do Now – 5 Minutes Topic – Anatomy of the Earth Based on the rules we learned yesterday, determine the chronological order of the strata shown below.
First approaches J. García, F. Toral, J. Munilla – CIEMAT.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Assembly Features.
Fixed Target Program in STAR Fixed-target running allows much higher rates without e-cooling at lower energies Top of  B range now ~ 400 MeV; extends.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Muon PRS meeting January 21 st, 2003 Norbert Neumeister CERN EP / HEPHY Vienna Muon Barrel Geometry Description.
Mario Sitta 1 CERN – Mon. 7 Jul., 2008 Status of ITS v11Hybrid geometry Mario Sitta Univ. Piemonte Orient. & INFN Alessandria.
A Cherenkov Radiation Detector Design for the Observation and Measurement of High Energy Cosmic Rays Yvette Cendes, Research Adviser: Corbin Covault Department.
RICH upgrade simulation: updates RICH upgrade-software meeting 1 S.Easo.
Nov Beam Catcher in KOPIO (H. Mikata Kaon mini worksyop1 Beam Catcher in the KOPIO experiment Hideki Morii (Kyoto Univ.) for the KOPIO.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Views of Solids Geometry D. Sketching the views of the solid. First, use blocks to construct a similar solid to the one shown at the left.
New options for the new D1 magnet Qingjin Xu
 The outer most layer of Earth  Made of Oxygen, silicon and aluminum.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
Using Photoshop Nicholas Phillips. On this page I will explain how I used Photoshop to create the guitar necked effect for the strapline After fetching.
Update on Q4 DSM/IRFU/SACM The HiLumi LHC Design Study (a sub-system of HL-LHC) is partly funded by the European Commission within the Framework Programme.
6-70 km thick 6-70 km thick Very light; only 1% of Earth’s total mass Very light; only 1% of Earth’s total mass Made up of rock Made up of rock Two types.
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
Reading Quiz Sometimes a thin layer of oil on top of a puddle of water produces a rainbow pattern of colors. This is a result of: the interference properties.
Time Remaining 20:00.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
Layers of the Earth What’s inside?. A Slice of the Earth the layers……. Inner Core Outer Core Mantle Crust.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
Путешествуй со мной и узнаешь, где я сегодня побывал.
Mrs. Degl1 Each layer has a different thickness. Mrs. Degl2 Oceanic Crust is thinner than Continental Crust Oceanic Crust Continental Crust.
3D Modeling Engineering II.
Drafting I Unit 4 Section 3
Mechanical Modelling of the PSI CD1 Dipole
FCC-hh 16 T, 1.9 K INFN Team October 2015.
SoLID Simulation Zhiwen Zhao 2016/08/27.
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
River Systems Part 3 Formation of Deltas Flooding.
Solid Figures Geometry.
HGC update Zhiwen Zhao 2016/02/18.
Solid Figures Geometry.
CLEO II Magnet in Hall A for SoLID
3D Modeling Engineering II.
3D Modeling Engineering II.
Cryomodule Assembly Plan
New SoLID Setup Detector Layout Magnet dimension EC size Cables
MUC simulation and reconstruction
1,000, , , Year Old Topic 1 10 Year Old Topic 2 175, ,000 9 Year Old Topic 3 9 Year Old Topic 4 50,000 8 Year Old Topic 5 8 Year.
How magnet opening affects PVDIS acceptance
Practice Geometry Practice
Cross-section of the 150 mm aperture case
Presentation transcript:

Comparison of Return Iron from Jay Benesch’s Study Mock up used for the last several years Return iron resulting from Jay’s study LGC detector included in each model for reference.

“Mock-up” Iron and Jay’s Case Study Overlaid Past structural analysis indicated the thickness of the downstream coil collar needed to be increased. The change is reflected in Jay’s study. This causes an interference with the LGC in it’s current position. End cap extended further downstream

Hopeful to avoid major geometry changes to LGC detector From the LGC page on SoLID wiki (several years old) Create a recess in the iron at the top to allow the mirrors, cones and PMT’s to remain in their current location. We need a CAD file from LGC to look at the feasibility.

Extended coil collar and 1st layer of iron denoted in magenta.

Cable Routing?

Access Holes for Cabling