Co-Ordination meeting of KPTCL & BESCOM 19 th October 2012 Friday Venue: Conference Hall, Corporate Office, Cauvery Bhavan, KPTCL.

Slides:



Advertisements
Similar presentations
1 Density/Cost Allocation Study April 15, 2009 Michael Roger Manager, Distribution Pricing.
Advertisements

Warm up Translate following expression a. three less than x. b. Product of a number and 4 2. a. -24+(-13) b. 34 – 42 3.a. -3/7 + 2/3 b. 2/3.
National Grid Local System Plan 2009 LSP Presentation Related Questions and Answers.
“God Is Not…” “God is not a man” Numbers 23:19 God’s dependable nature
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
RESULTS OF INFLOW SURVEYS AND SUPPLIER INTERVIEWS 1.Biomass Inflow Surveys 2.Suppliers Interviews Vendors Non-motorized Suppliers Motorized Suppliers.
Slide 1 FastFacts Feature Presentation October 15, 2013 To dial in, use this phone number and participant code… Phone number: Participant.
1 INTRODUCTION TO ELECTRICAL THEORY 2 What is Electricity? The controlled flow of electrons in an electrical circuit. A circuit must always be a complete.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Electricity and Magnetism
C1 Sequences and series. Write down the first 4 terms of the sequence u n+1 =u n +6, u 1 =6 6, 12, 18, 24.
ZMQS ZMQS
Operating Plans and Rates
Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update.
MEP201 Mechanical Engineering Drawing 1st semester
Substation L1/ MCC L1 Update March 21 st, Current Location.
WORK PROGRESS OF KERALA TOWNS UPTO JANUARY Towns Scheme Sanctioned on 20 th Nov 2002.
Lincolnshire Low Carbon Hub Steven Burns. Background to the Hub Progress Learning Next Steps Presentation Outline mVA Harmonics Voltage Foot print Site.
© S Haughton more than 3?
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
SYSTEMS OF EQUATIONS.
BFWAtg - BFWA sharing with RAS at 43 GHz Slide 1 Re-examination of the protection requirements for the Radio Astronomy Service in light of the Broadband.
SCATTER final seminar, Brussels, 9 November 2004 SCATTER Testing and evaluating potential solutions to control urban sprawl, through simulation.
© 2012 National Heart Foundation of Australia. Slide 2.
Jodhpur Discom PRESENTATION Sr. OFFICERS MEETIN DATED
1 Jodhpur Discom. 2 AG,DL & BPL CONNECTIONS Status of AG. DN deposited & connections Released ( ) 3.
Jodhpur Discom Presentation before Sh. Sudhansh Pant I.A.S. Chairman Discoms & Managing Director,J.V.V.N.L.,Jaipur
Properties of Exponents
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Event 4: Mental Math 7th/8th grade Math Meet ‘11.
Addition 1’s to 20.
25 seconds left…...
Week 1.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Taina Wilhelms 1 ENERGY YEAR 2010 Finnish Energy Industries
Energy Year 2014 Electricity Finnish Energy Industries.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
FY2014 Budget – Items of Interest Supplemental Budget Documents Proposal to use $1,964,676 of Fund Balance dollars to pay for General Fund Capital projects.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
BANGALORE TRANSMISSION PLANNING
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
COMPARISION OF PJM AND INDIAN GRID. PJMINDIAN GRID.
1 Risks at Komati Water Scheme PED Operations. 2CONTENT  Executive Summary  Pump station layout schematic  KWS Maintenance risks  KWS Operational.
High Temperature Superconducting (HTS) Cable Project
Power Supply Schematic of DDK Jaipur
CLIC Civil Engineering & Infrastructure Working Group Meeting
Yangon Region Rural electrification plan
Presentation transcript:

Co-Ordination meeting of KPTCL & BESCOM 19 th October 2012 Friday Venue: Conference Hall, Corporate Office, Cauvery Bhavan, KPTCL

Vijayanagar Constraints: 1)Existing 20MVA transformers was enhanced by 31.5MVA, but the CTs, breakers have not been replaced. Existing bank of 31.5MVA transformer is getting overloaded and load shedding is being effected. 2)1X20MVA Power transfortmer load is overloaded with peak load of 18MWs. Remedies: Additional bank is to be proposed for 31.5MVA transformer with switchgear. Vijayanagar Constraints: 1)Existing 20MVA transformers was enhanced by 31.5MVA, but the CTs, breakers have not been replaced. Existing bank of 31.5MVA transformer is getting overloaded and load shedding is being effected. 2)1X20MVA Power transfortmer load is overloaded with peak load of 18MWs. Remedies: Additional bank is to be proposed for 31.5MVA transformer with switchgear. Byadarahalli Constraints: 2X20MVA Power transformer load os overloaded with peak load of 36MWs which is more than 75% of loading. Remedies: Transformer to be augmented by 2X31.5MVA Byadarahalli Constraints: 2X20MVA Power transformer load os overloaded with peak load of 36MWs which is more than 75% of loading. Remedies: Transformer to be augmented by 2X31.5MVA LR Bande Constraints: Existing power transformers are overloaded. Remedies: Augmentation of 2X20MVA by 2X31.5 Power transformer is required. LR Bande Constraints: Existing power transformers are overloaded. Remedies: Augmentation of 2X20MVA by 2X31.5 Power transformer is required. VHSS Constraints: 1)Due to overloading of 2X20MVA power transformer, load shedding to be effected during peak hours. 2)Aged breakers, no space available since existing C&G Remedies: 1)2X20MVA transformers to be augmented by 2X31.5MVA transformers 2)16 breakers of Bank I & II to be r eplaced VHSS Constraints: 1)Due to overloading of 2X20MVA power transformer, load shedding to be effected during peak hours. 2)Aged breakers, no space available since existing C&G Remedies: 1)2X20MVA transformers to be augmented by 2X31.5MVA transformers 2)16 breakers of Bank I & II to be r eplaced Sarakki Constraints: Station is overloaded Remedies: The existing 20MVA power transformer has to be augmented to 31.5MVA Sarakki Constraints: Station is overloaded Remedies: The existing 20MVA power transformer has to be augmented to 31.5MVA A-Station Constraints: Breaker problem due to aged CGL breakers, no spares available. Remedies: All the switch gears to be replaced. A-Station Constraints: Breaker problem due to aged CGL breakers, no spares available. Remedies: All the switch gears to be replaced. EPIP Constraints: Lengthy and overloaded 11KV feeders Remedies: New station at Kachamaranahalli to be established. DPR approved. EPIP Constraints: Lengthy and overloaded 11KV feeders Remedies: New station at Kachamaranahalli to be established. DPR approved. Pottery Road Constraints: 2X20MVA Power transformers overloaded(Peak load 31MW) Remedies: Enhancement of 1X20MVA by 31.5MVA. Pottery Road Constraints: 2X20MVA Power transformers overloaded(Peak load 31MW) Remedies: Enhancement of 1X20MVA by 31.5MVA. HBR & Manyatha Constraints: HBR and Manyatha feeding from 220KV Hoskote located in rural & ITI-Hebbal lines.(Load shedding is being done in both the stations). HBR & Manyatha Constraints: HBR and Manyatha feeding from 220KV Hoskote located in rural & ITI-Hebbal lines.(Load shedding is being done in both the stations).

DG-3 & DG-4 line Constraint: Load is restricted to 40MW only. Remedies: IT is proposed to lay 1000Sqmm 66KV cable for a distance of about 3Kmss from SRS Peenya to Platinum city DG-3 & DG-4 line Constraint: Load is restricted to 40MW only. Remedies: IT is proposed to lay 1000Sqmm 66KV cable for a distance of about 3Kmss from SRS Peenya to Platinum city

Hebbal to L.R.Bande line Constraint: Existing 66KV Hebbal – ITI 2 line overloaded. Remedies: IT is proposed to lay 1000Sqmm 66KV cable for a distance of about 3Kmss from SRS Peenya to Platinum city Hebbal to L.R.Bande line Constraint: Existing 66KV Hebbal – ITI 2 line overloaded. Remedies: IT is proposed to lay 1000Sqmm 66KV cable for a distance of about 3Kmss from SRS Peenya to Platinum city

Byadrahally Constraint: 66KV Peenya- TG Hally line overloaded. Remedies: Replacement of Existing coyote by HTLS/Lynx/Drake. Byadrahally Constraint: 66KV Peenya- TG Hally line overloaded. Remedies: Replacement of Existing coyote by HTLS/Lynx/Drake.

Kumbalagodu-Bandemutt-Sir.M.V Constraint: No alternate source to all the three stations. Kumbalagodu-Bandemutt-Sir.M.V Constraint: No alternate source to all the three stations.

Amarjyothi MUSS Constraint: HAL-Audugodi 1&2 lines overloaded Remedies: Enhancement of conductor. Amarjyothi MUSS Constraint: HAL-Audugodi 1&2 lines overloaded Remedies: Enhancement of conductor.

K&C Valley Constraint: No Alternate source. K&C Valley Constraint: No Alternate source.

Khodays Glass Factory Constraint: No Alternate source. Remedies: To be arranged from RBI or South City Khodays Glass Factory Constraint: No Alternate source. Remedies: To be arranged from RBI or South City

Amarjyothi-Audugodi line Constraint: Line overloaded. Remedies: Amarjyothi to Adugodi-Coyote to Drake 6.5Kms. Amarjyothi-Audugodi line Constraint: Line overloaded. Remedies: Amarjyothi to Adugodi-Coyote to Drake 6.5Kms.

St.John Wood Constraint: No Alternate source. Remedies: To be arranged from Jayadeva St.John Wood Constraint: No Alternate source. Remedies: To be arranged from Jayadeva

Audugodi-Jayadeva line Constraint: Line overloaded. Remedies: The existing Coyote conductor to be replaced by Drake conductor. Audugodi-Jayadeva line Constraint: Line overloaded. Remedies: The existing Coyote conductor to be replaced by Drake conductor.

Elita-Khodays Station Constraint: No Alternate source. Remedies: Proposed to have link line from RBI/South city-2.2Km. Elita-Khodays Station Constraint: No Alternate source. Remedies: Proposed to have link line from RBI/South city-2.2Km.

Velankani Station Constraint: No Alternate source. Remedies: To be arranged from Naganathpura. Velankani Station Constraint: No Alternate source. Remedies: To be arranged from Naganathpura.

BTM MUSS Constraint: No Alternate source. Remedies: To be arranged from Naganathpura/AECS Layout. BTM MUSS Constraint: No Alternate source. Remedies: To be arranged from Naganathpura/AECS Layout.

South City MUSS Constraint: No Alternate source. Remedies: To be arranged from Elita prominade. South City MUSS Constraint: No Alternate source. Remedies: To be arranged from Elita prominade.

Banaswadi MUSS Constraint: ITI-Hebbal line overloaded. Remedies: Replacement of 66KV Coyote by HTLS conductor about 13KM. Included in KPTCL FY 13 budget. Banaswadi MUSS Constraint: ITI-Hebbal line overloaded. Remedies: Replacement of 66KV Coyote by HTLS conductor about 13KM. Included in KPTCL FY 13 budget.

HAL-NGEF line Constraint: To avoid radial & overload on Hoody station. Remedies: Replacement of 66KV Coyote by HTLS conductor about 13KM. Included in KPTCL FY 13 budget. HAL-NGEF line Constraint: To avoid radial & overload on Hoody station. Remedies: Replacement of 66KV Coyote by HTLS conductor about 13KM. Included in KPTCL FY 13 budget.

A Station-VHSS Constraint: To avoid radial & overload on A station. Remedies: Running additional (66KV) line using 1000 Sqmm UG cable. Included in KPTCL FY-13 budget. A Station-VHSS Constraint: To avoid radial & overload on A station. Remedies: Running additional (66KV) line using 1000 Sqmm UG cable. Included in KPTCL FY-13 budget.

A Station- C Station Constraint: To avoid radial & overload on A station. Remedies: Running additional (66KV) line using 1000 Sqmm UG cable. Included in KPTCL FY-13 budget. A Station- C Station Constraint: To avoid radial & overload on A station. Remedies: Running additional (66KV) line using 1000 Sqmm UG cable. Included in KPTCL FY-13 budget.