Substation L1/ MCC L1 Update March 21 st, 2012. Current Location.

Slides:



Advertisements
Similar presentations
72V - Recoil, Recoil IS, & Instinct New Vehicle Delivery Tips
Advertisements

Smart Motor Management
Electricity Merit Badge
Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
Montgomery County Fire Rescue Medical Ambulance Bus 20 Patient Capacity.
Wireless Controllers. Building block for remote control & alarming Functions Local control Measurement SMS alarming Remote control via SMS Data transmission.
F&T Inc. OVERHEAD CRANE SAFETY.
MEP201 Mechanical Engineering Drawing 1st semester
Your Business Continuity Partner ! PEAK 10 – SOUTH FLORIDA.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
The Vanjen Group • Manufacture's Representative – Power Generation/Oil & Gas • Covering TX, OK, LA, AK, in some cases NM and MS • Extensive.
What to look for, What to correct, How it should look,
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Constellation Heating and Cooling Building Automation Systems.
An Overview of System & Appliance Testing A2Z On-Demand Training.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
1 1 Automatic Power Cut-off Device for Electricity Distribution Board Construction Safety Week Innovative Safety Initiative Award 2013.
Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
1 OFFICE ELECTRICAL SAFETY Environmental Energy Technologies Division (EETD) On the Job Training August 12, 2013.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Disaster Electrical Power An early draft Ray J. Vaughan, MS Last update 6/15/2015.
Gauges and well logging
Electrical Power Systems
Managing a computerised PO Operating environment 1.
ELECTRIC CIRCUIT VISUAL INSPECTIONS COURSE OBJECTIVES DISCUSSION AND REVIEW OF ELECTRICAL INSPECTION TECHNIQUES AND METHODS.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Managing Computerised Offices Operating environment
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Lift Station Safety and Maintenance Tony Conn, Supervisor Wastewater Collection and Pumping
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
SUGGESTED CLASSROOM SAFETY GUIDELINES TEXAS SCHOOL RISK MANAGEMENT ASSOCIATION (TSRMA) Waxahachie Independent School District.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
UTILITY SHUT DOWN PROCEDURES. Introduction Review with all crew members proper shut down procedures for Natural Gas and Electrical in emergency situations.
PIP Update 3 September 26 th, L1 Future Plans  Installation is halted until further notice (plan for 2014 shutdown or when needed)  Substation.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
Fire Prevention “ Cover the Bases & Strike Out Fire”
Tulane University - Office of Environmental Health & Safety (OEHS) Electrical Safety For Office, Facility, and Laboratory Employees Tulane University October.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Electrical Power Distribution. Forms of Energy All forms of energy fall under two categories POTENTIAL Stored energy or energy of position (gravitational)
Electrical Power Distribution. Forms of Energy All forms of energy fall under two categories POTENTIAL Stored energy or energy of position (gravitational)
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
Pre-Shift Examination Scenario Continuous Miner Section What you will need to complete this exercise: Pencil and paper to take notes or perform calculations.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Power Systems J. Sandberg July 2006 RHIC Retreat 2006.
Looking Out for Your Safety Business, Marketing, and Information Technology Education.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
Transfer Station Safety OR WORKER AND PUBLIC RISK.
FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.
West Cambridge Data Centre Ian Tasker Information Services.
Warehouse Safety Is This You????.
Making Circuits Safe SNC1P1 Findlay.
Addition of Fire Alarm system. None existing.
Energy How to use Safety Diagnosis Bilingual
CUB Outage Schedule April 21, 2006.
SAFE WORK INSTRUCTIONS
K TO 12 CHS MODULE FOR GRADE 9, PP
Trouble Shooting The following section is to assist you in the trouble shooting process of your deicer. Although we do not expect to have problems with.
Emergency Electrical Power Supply for Buildings
SAFE WORK INSTRUCTIONS
Click anywhere to get started…
Presentation transcript:

Substation L1/ MCC L1 Update March 21 st, 2012

Current Location

Equipment Layout

Project Schedule

General Cleanup 2-3 weeks prior to shutdown of substation Generator will arrive one week before shutdown (if used) Temporary electrical power will be setup the weekend prior regardless of whether or not a generator is used Office Lights Office Receptacles Security Camera Fire Detection Panels Emergency Lights Exit Signs Crane Hydraulic Lift Sanitary Lift Station Overhead Door What Will What Will Not be Powered Heat Air Conditioning All other MCC loads Welding Receptacles Hall Receptacles

No Generator Plan Siphon power from panel DHP-L2-2 or DHP-L3-4 Cable will be run in cable trays 4 conductor 350 mcm cable is heavy (~7 lbs./ft.) and will need an open area to lay Use cable trays as much as possible for load wiring If on the floor, cable bridges will be used in walkways to prevent tripping Setup temporary panel board(s) Run cable to individual loads (DHP panels, MCC loads) DHP panels will be locked out and tagged out Group lockbox MCC loads will have configuration control locks We will check current prior to using any MCC loads to ensure they will not trip off during operation Schedule will be the same as the generator, except that we will have power all day

No Generator Plan Pictures

Substation L1 Contract awarded to Federal Pacific February 10 th, 2012 Waiting for approval drawings Cost: $164,853 Due By: June 20, 2012 Profibus Network Remote monitoring Remote operation Replaceable trip units Allows for proper coordination of breakers Cost in the hundreds of dollars Advanced Local Monitoring Current meter on primary switch Panel meter capable of power factor measurements, harmonics, etc. Features of New Substation Source:

Scheduling One week install time May need to be hour days to accomplish this One day Riggers Crew of 6-8 One week of electricians Crew of 2

MCC L1 Req. placed Waiting for bids Cost: ~ $50,000 Due By: August 1 st, 2012 Siemens Tiastar Smart Start Profibus Network Remote/Local Monitoring FLA, under/over current, status messages, input/output data, on, off HMI/PLC used to control loads Used to monitor and control 4 WL breakers used in Substation L1 This will require in house programming Features of New MCC Source: Siemens

Scheduling Will be installed when Substation L1 is installed One day install time Budgeted two to be safe Several loads will need to be powered when power is turned off Crane, Overhead Door, Lift Station, Sump Pumps, Hydraulic Lift Sump pumps will be handled by temporary sump pumps

Installation Costs 1 Crew of Riggers (6-8 men) 1 Day: $12k 1 Week of Electricians $100/manhour x 2 electricians x 40 hours = $8,000 $100/manhour x 2 electricians x 40 hours + $150/manhour x 2 electricians x 20 hours= $14,000 Generator $5,400 For a Month Rental $2,000/day Diesel $1,400 For a Panelboard (x2-?) Several Hundred Feet of Cable to Individual Loads House Power $1,400 For a Panelboard (x2-?) 250 ft. of 4 Conductor 350 MCM Cable (In Storage, Unsure of length) Several Hundred Feet of Cable to Individual Loads

Commissioning Visual Inspection Hi-Pot Disconnect panel boards from temporary power Reconnect panel boards DHP-L1-1 will be turned on first Fire alarms Lighting Etc. DHP-L1-2 DHP-L1-3

What Will Become of the Removed Equipment? Transformer will be kept as a spare Currently have 1 spare for 8 transformers (5 – high rise, 3 – LINAC) Transformer will be examined to make sure it is in good working order Will be stored in Booster parking lot Will be placed on a truck the same day it is removed to avoid excess rigger fees Breakers Will be rebuilt and tested Used as spares Primary Switch Will be rebuilt and tested Used as a spare

Future Create Site Wide Monitoring Network PIP Project ???? Note: attempting to move CG-1 budget to operations cost

Future Costs MCC L2 ~ $65k CG-1 ~ $200k Install Times MCC L2 ~ 2 Days Electricians, 1 Day Riggers CG-1 ~ 1 Week Electricians, 1 Day Riggers Affected Entities MCC L2 Chilled Water to Linac Heaters Sump Pump Air Compressors CG-1 Main Control Room Cross Gallery Motor Control High Bay MAC Room Computer Room