Jamie Austin, PacifiCorp

Slides:



Advertisements
Similar presentations
Unit 9 It's warm 清丰县第一实验小学 唐利娟.
Advertisements

Resource Adequacy Forecast Adjustment(s) Allocation Methodology
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Electric / Gas / Water Eric Fox Oleg Moskatov Itron, Inc. April 17, 2008 VELCO Long-Term Demand Forecast Methodology Overview.
Coincident Peak Load Forecasting Methodology Prepared for June 3, 2010 Meeting with Division of Public Utilities.
Seasonal Models Materials for this lecture Lecture 9 Seasonal Analysis.XLSX Read Chapter 15 pages 8-18 Read Chapter 16 Section 14 NOTE: The completed Excel.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
2011 Transmission Customer Meeting October 12, 2011.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
CBRFC Stakeholder Forum February 24, 2014 Ashley Nielson Kevin Werner NWS Colorado Basin River Forecast Center 1 CBRFC Forecast Verification.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
LOAD RESEARCH Irrigation Load Study Utah Cost of Service Task Force August 25, 2005.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Lecture 9 Seasonal Models Materials for this lecture Lecture 9 Seasonal Analysis.XLSX Read Chapter 15 pages 8-18 Read Chapter 16 Section 14.
2 Where we are at Year Year Precipitation Summary.
10th COSMO General Meeting, Cracow, Poland Verification of COSMOGR Over Greece 10 th COSMO General Meeting Cracow, Poland.
Four files erik_a2_stockholm_temp Erik simulation scenario A2 until 2100 erik_a2_stockholm_prec Erik simulation scenario A2 until.
Supply Chain Insights TM Benchmarking SUPPLY CHAIN Planning Company Comparison Charts.
Generation to be Dispatched(GTBD) Analysis For the purpose of discussion only PDCWG/QMWG Joint Meeting 11/02/2012.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
TAS Follow-up Webinar Historical Year Energy Shape Compromise for 2026 Common Case December 14, 2015 Jim Filippi- TAS Chair Tom Miller- TAS Vice Chair.
Economic Forecast Review
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Nader Samaan Xinda Ke Pacific Northwest National Laboratory (PNNL)
Heat Rate Calc based on CEMS Data April 12, 2016
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
Self-Generation Forecast CED 2017 Preliminary
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
Hydro Modeling Improvement for TAS Approval May 4, 2017
TEPPC Review Task Force Meeting February 4-5, 2016
UNC Modification Proposal 0202 National Grid Distribution
MWG Recommended Hydro Improvement March 7, 2017
Lecture 9 Seasonal Models
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Assess variability from year to year: 2010, 2012, 2013, 2015
Outline Background Study Assumptions Study Results To Do
Recommended Hydro Improvement April 11, 2017
Assess variability from year to year: 2010, 2012, 2013, 2015
Jamie Austin, PacifiCorp
Independent Load Forecast Workshop
Steering Committee Webinar March 25, 2016
Outline Modeling Issue 2017 Modeling Goals
City of Lebanon, Missouri Electric Department
MWG Recommended Hydro Improvement March 14, 2017
Load Forecast and Base Case Development
SEASONS.
Resource Adequacy Demand Forecast Coincidence Adjustments
Load Forecast and Base Case Development
Updating IPR "Guidance" April 2017 European Commission DG ENV C.3
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
MWG Recommended Hydro Improvement March 7, 2017
Hydro Modeling Improvement for TAS Approval May 4, 2017
Modeling Subcommittee (MS) Updates
California Housing Market Update
Recommended Hydro Improvement April 11, 2017
SRWG Chair Report March 2015 WECC HQ
Nader Samaan Xinda Ke Pacific Northwest National Laboratory (PNNL)
Study Results Drought Scenario Study
Steering Committee Webinar March 25, 2016
Simulated vs. Real Hourly Dispatch Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Chap 4: Exponential Smoothing
Beartooth Electric Cooperative Rate Design Analysis
Presentation transcript:

Jamie Austin, PacifiCorp DWG Meeting August 30, 2016 TEPPC 2026 Common Case – Load Validation Jamie Austin, PacifiCorp DWG Chair

Overview Version 1.3 Load Edits Validating the 2026 Hourly Load Forecast Annual Load Comparison Monthly Load Comparison Modeling of Conforming and non-Conforming Loads (Proposed short-term solution) Pending Issues \ Questions

Annual Load Factor: 81%

Annual Load Factor: 71%

Annual Load Factor: 71%

Annual Load Factor: 65%

Annual Load Factor: 72%

Annual Load Factor: 67%

Annual Load Factor: 61%

Monthly Load Comparison Kevin Harris

Monthly Load Comparison Monthly peak demand Monthly unitized shape Rank order is determined with the winter and summer season* Avg is based on rank order (2006-14) Shape is unsorted based on simple average (2006-14) Monthly Load Factor (LF) Historic is a simple average (2006-14) Average Daily LF (by month) * Note: Improvement can be made in the shape by adjusting the season

Issue found Do we model a planning or generic historic monthly shape? Tacoma winter peak in Jan or Feb (Resent historic indicates a Dec peak)

Monthly Load Factor Monthly LF remain stable They only change with a shift in resident/commercial/Industrial load PSE

“Round Trip” Accounting for no-Conforming Loads

Round Trip: Reconcile Lin vs. Lout Differences To fix the issue with Station Service (SS) load, it was suggested to write an “EPCL” post PCM. An alternative: (The 2026CC has SS values for just summer and zero values for remaining seasons) Export Bus_Load_Distribution File – Excel from PCM Filter LoadID (column D) looking for SS summer values Edit LoadID, using SS summer values to replace other seasons zero values (Autumn, Winter and Spring) Import LoadID back into PCM Turn off Loss Calculation

PAC Loads Lin Lout % diff TEPPC 2026CC V1.0 75,426,991 71,987,554 4.6 Scenario: 1 – Add SS load (Spring, Autumn and Winter) 73,796,234 2.2 2 – Scenario 1 + turned off loss calculation 75,352,251 0.1* * Scenario 2, (74.7GWh) 0.1% remaining difference accounts for negative loads.