Report from US ITER Fusion Power Associates December 15, 2011 Ned Sauthoff Project Manager.

Slides:



Advertisements
Similar presentations
Examples of ITER CODAC requirements for diagnostics
Advertisements

ITER Organization, Cadarache, France
Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
ITER Tokamak Cooling Water System Fusion Power Symposium Washington, DC Tom Coleman AREVA Federal Services December 15, 2011.
TASD R&D IDS-NF Mumbai. 2 Alan Bross IDS Plenary Meeting – Mumbai October 12-14, 2009 Detector R&D There are 3 components to this detector and their respective.
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
David Johnson Diagnostics Team Leader
PPPL ST-FNSF Engineering Design Details Tom Brown TOFE Conference November 10, 2014.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
Procurement ORNL U.S. ITER Project 1 November 15, 2006 PROCUREMENT Jeff Geouque U.S. ITER Procurement Director.
ELECTRON CYCLOTRON SYSTEM FOR KSTAR US-Korea Workshop Opportunities for Expanded Fusion Science and Technology Collaborations with the KSTAR Project Presented.
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
WBS Tokamak Exhaust Process
Overview of the ARCS Project Plan: The View at One Year Doug Abernathy ARCS Instrument Scientist ARCS IDT Meeting Lujan Center, LANL September 30, 2002.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
PWF 3/01 Plasma Fueling Program1 Pumping Systems for ITER, FIRE and ARIES P. W. Fisher Oak Ridge National Laboratory C. A. Foster Cryogenic Applications.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Developing a Vendor Base for Fusion Commercialization Stan Milora, Director Fusion Energy Division Virtual Laboratory of Technology Martin Peng Fusion.
General Overview of the Korean Domestic Agency Procurement Activities K. J. Jung ITER Korea (KODA) National Fusion Research Institute.
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
Overview of U.S. Preparations for ITER Ned Sauthoff Fusion Power Associates Washington, DC November 19, 2003 Positioning the US to achieve its Burning.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
Princeton University Plasma Physics Laboratory EVMS Certification Review NSTX Project Overview Ron Strykowsky October 4-6, 2011.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
Exploring Magnetically Confined Burning Plasmas in the Laboratory AAAS Annual Meeting Ned Sauthoff February 18, 2005 “Yearn to burn” “Burn to learn” Marshall.
Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 3 March 2011 Stellarator Program Update.
HTPD ITER Satellite Meeting 1April 22, 2004 Proposed US Role in ITER Diagnostics David Johnson, PPPL.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
Fast liquid Lithium “shower” injector G. A. Wurden Los Alamos NSTX Brainstorming Meeting Feb 7-8, 2012.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
UCRL-PRES Magnet Design Considerations & Efficiency Advantages of Magnetic Diversion Concept W. Meier & N. Martovetsky LLNL HAPL Program Meeting.
Report on Developing Industrial Cost Estimates for ITER Systems of Possible Interest to the US For Discussion with FESAC Gaithersburg, MD March 5, 2003.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Charles C. Baker Virtual Laboratory for Technology presented at the U.S. ITER Forum University of Maryland, College Park May 8, 2003 US ITER Technology.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
ITER Project Status Ned Sauthoff Project Manager U.S. ITER Project Office FESAC 7/27/04 “preparing for an efficient start of ITER construction”
ITPA12 Diagnostics - PPPL - 3/26-30/07 1 US ITER Project Plans David Johnson Diagnostics Team Leader March 26, 2007 ITPA12 Design Basis US Scope Port Plugs.
US ITER Project Activities Ned Sauthoff, Project Manager U.S. ITER Project Office 16th ANS TOFE 9/16/04 Partnering on ITER for studies of burning plasma.
NCSX Project Overview Hutch Neilson, NCSX Project Manager For the NCSX Team NCSX Conceptual Design Review Princeton, NJ May 21, 2002.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
ORNL is managed by UT-Battelle for the US Department of Energy Fusion Energy Development at ORNL (non-US ITER) Phil Ferguson Fusion Power Associates 36.
Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC November, 2003.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
1 Preparation and Positioning of Korea for the ITER Project 2004 KSTAR US-Korea Workshop May 19-20, General Atomics.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Disruption Mitigation System Developments and Design for ITER L.R. Baylor, C. Barbier, N.D. Bull, J.R. Carmichael, M.N. Ericson, M.S. Lyttle, S.J. Meitner,
In-Kind Contributions Workshop – IKCW ITER Status of In-Kind Procurement Helium (3,5 MeV) Neutron (14,1 MeV) Deuterium Tritium Ken Blackler Construction.
Magnetics Program Highlights VLT Conference Call September 13, 2000 presented by J.V. Minervini MIT Plasma Science and Fusion Center.
MAIN COMPONENTS  INTODUCTION  PRINCIPLE  CONSTRUCTIONAL DETAILS  PROCESS  ADVANTAGES  DISADVANTAGES  CONCLUSION.
CSP 25th November 2010 Technical agreement number 3: overview
Produktentwicklung und Maschinenelemente
Injector Performance Requirements Conventional Facilities Update
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Measurement Innovation Program
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Injector/Linac Design Status C. E
EX/P7-12, R&D for reliable disruption mitigation in ITER, M
Stellarator Program Update: Status of NCSX & QPS
Presentation transcript:

Report from US ITER Fusion Power Associates December 15, 2011 Ned Sauthoff Project Manager

US In-kind Hardware Contributions ORNL 100% Central Solenoid Windings + JA Support ORNL 8% of Toroidal Field Conductor + JA Support ORNL 100% Pellet Injector 100% Disruption Mitigation ORNL Blanket/Shield (design only) ORNL 100% Tokamak Cooling Water System PPPL 75% Steady State Electrical Network PPPL 15% of Port-based Diagnostics ORNL 88% Ion Cyclotron Transmission Lines ORNL 88% Electron Cyclotron Transmission Lines PPPL In-Vessel Coils (prelim. design only) ORNL 100% Roughing Pumps, Vacuum Standard Components SRNL 100% Tokamak Exhaust Processing System

Progress and Plans Central Solenoid Contract placed for module fabrication with General Atomics (July 2011) Successful Preliminary Design Review (September 2011) Manufacturing input to structures design is being provided by industry (4 BOA contractors) Assembly tooling on track for Preliminary Design Review (February 2012) Technical and schedule issues are being addressed

Central Solenoid Conductor Testing at ORNLs Spallation Neutron Source (DOE/SC/BES) Measure strain state of a CS conductor sample after high cyclic loads and compare regions that experienced high E-M loads and low E-M loads Enhance understanding of the impact of strain on performance Provide insight for improving design Past testing showed significant conductor degradation under cyclic electromagnetic (E-M) loading conditions SNS VULCAN tests will: Issue: VULCAN Engineering Materials Diffractometer

Progress and Plans Toroidal Field Conductor: Strand Photo: Oxford Superconducting Technology Major contracts awarded to: Oxford Superconducting Technology Luvata Waterbury, Inc. New England Wire Technologies Corporation CICEFT (Cable in-Conduit Engineering, Fabrication and Testing), now called High Performance Magnetics

Progress and Plans Toroidal Field Conductor: Strand Photo: Luvata Waterbury

Progress and Plans Toroidal Field Conductor: Jacketing CICEFT (Cable in-Conduit Engineering, Fabrication and Testing), now called High Performance Magnetics: Superconducting Cable Jacketing Facility at the Tallahassee Regional Airport

Progress and Plans Toroidal Field Conductor: Jacketing Photo: CICEFT Compaction Mill at CICEFT (Cable in-Conduit Engineering, Fabrication and Testing), now called High Performance Magnetics

Progress and Plans Tokamak Cooling Water System Basic Ordering Agreement with AREVA Federal Services (awarded December 2009) Final Design for Drain Tanks (April 2011) Contract to AREVA/Joseph Oat for Drain Tank Fabrication (September 2011) Preliminary Design for All Other Systems (March 2012) Drain Tank Vendor Prequalification Tours [February 2011]

Typical glovebox with piping, electrical and instrumentation Preliminary Design Review (October 2014) Procurement Arrangement (May 2015) Final Design (August 2018) Progress and Plans Tokamak Exhaust Processing

Progress and Plans Vacuum and Pumping Standard Vacuum Components and System, Preliminary Design Review (December 2011) Tritium Compatible Roughing Pumps, Conceptual Design Review (July 2013)

Progress and Plans Pellet Injection Pellet injectors for fueling and ELM pacing Twin-screw extruder prototype for hydrogen isotope ice pellet formation

Progress and Plans Disruption Mitigation Disruption Mitigation Massive gas injection Massive pellet injection Runaway Electron Suppression De-confinement Collisional damping Large (16 mm+) pellet testing for disruption mitigation at ORNL. (Photo: Combs) Pellet exiting guide tube Pellet fragments V-shaped plate for shattering the pellet before injection into the plasma

Progress and Plans Diagnostics Scope: 16% of ITER diagnostics Port Plugs Upper Ports (U11, U14) Equatorial Ports (E3, E9) Lower Port Structures (L8) Diagnostics Upper IR/Visible Cameras Low Field Side Reflectometer Motional Stark Effect Polarimeter Electron Cyclotron Emission Diagnostic System Divertor Interferometer Toroidal Interferometer/Polarimeter Core Imaging X-ray Spectrometer Residual Gas Analyzer Successful review of drawer packaging design (June 2011) First procurement arrangement signed, for residual gas analyzer (September 2011)

Procurement Arrangement signed (May 2010) Low-power mode-control tests underway with prototype components (ORNL, MIT) Full power tests planned (Spring 2012) Alternate waveguide component designs and fabrication techniques developed Progress and Plans Electron Cyclotron Transmission Lines

300 kW Dummy Load Feed Line 10 db Coupler Directional Couplers IR Viewing Port Cooling Panel Procurement Arrangement signed (April 2010) Ongoing R&D and full- power, long-pulse prototype tests to develop/qualify industry components Tests of mechanical assembly and 3 atm pressurization Optimize matching system components and port cell layout ICH Component Test Stand Progress and Plans Ion Cyclotron Transmission Lines

Progress and Plans Steady State Electrical Network Key developments with EU and International Organization: Scope sharing Plan and schedule Credit allocation Load database Upcoming: RFP for engineering support to be issued in early 2012 Final Design Review April 2012 PA to be issued by IO June 2012

Steps Forward 2012 Complete R&D Advance Design with Industry Baseline Domestic Project 2013 Engage Industry to Begin Fabrication