The Vanjen Group • Manufacture's Representative – Power Generation/Oil & Gas • Covering TX, OK, LA, AK, in some cases NM and MS • Extensive.

Slides:



Advertisements
Similar presentations
Molded Case Circuit Breakers for the OEM Market
Advertisements

Electricity Merit Badge
Powering Axis Network Cameras with Power over LAN.
Trystar Generator Docking Stations & Portable Power Cable
Variable Frequency Drives Bypass Options
SAE J1772™ Gery J. Kissel Engineering Specialist General Motors
B757 Review Questions.

Revenue Protection & Safety Field Safety. Safety First Section 1.5 Personal Protective Equipment.
Substation L1/ MCC L1 Update March 21 st, Current Location.
UNIT 31 HOME ELECTRICAL SYSTEM
Presentation : IMS – Tech Managers ConferenceAuthor : IMS StaffCreation date : 08 March 2012Classification : D3Conservation :Page : # 05 - Wiring Methods.
New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
AC Coupled Systems Growing market segment Can be confusing! Can be complicated! Numerous ways to go MidNite has taken most of the mystique out of the.
The D.C. Scout Battery Distribution System Ground Locator
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Isolation Verification Control Mining - Marine - Transit – Solutions LIVE Distributed By Locksafe Industrial Safety Equipment.
AC-SSC-1 Installation and operation manual
An Overview of System & Appliance Testing A2Z On-Demand Training.
PUMP STATION ELECTRICAL DESIGN
1 SOLAR SYSTEMS BASICS.  National Electric Code (NFPA # 70) for Photovoltaic Systems  Mechanical Code of New York State for Thermal Systems  Plumbing.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
Slide: kVA Generating Sets FG Wilson Small Generating Sets 10-35kVA Features and Benefits.
Septronics, Inc. Septronics, Inc. Mission Statement To supply quality customer service, product and custom solutions spurred by direct contact with our.
Jon Sunde – Master Electrician, Trystar
Switching Device Product Line General Duty and Heavy Duty Safety Switches.
Direct Current Circuits
Electrical Power Systems
© 2011 Ericson Manufacturing, Willoughby, Ohio
The Vanjen Group • Manufacture's Representative – Power Generation/Oil & Gas • Covering TX, OK, LA, AK, in some cases NM and MS • Extensive.
Manufacture's Representative – Power Generation/Oil & Gas Covering TX, OK, LA, AK, in some cases NM and MS Extensive Power Gen Experience Extensive Docking.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
1. Presentation Overview  Solar Industry Overview  Intro into Solar Photovoltaics  Types of PV Systems  Solar Product Offering –Solar Combiner Boxes.
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
ERICSON UNIVERSITY LIVE TRAINING SESSION: July 2010 TEMP POWER ADVANCED.
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
Kenneth (Kenny) Mercado Division Vice President of Distribution Electric Operations Turning on the Lights.
1 INTRUSION ALARM TECHNOLOGY POWER SUPPLIES. 2 INTRUSION ALARM TECHNOLOGY Security systems shall have a primary power source and a secondary power source.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. CENTERLINE 2100 Motor Control Center - SecureConnect™ September 1, 2011.
Residential Solutions New Square D QO ‘All-in-one’ & ‘Stand-alone’ Generator Panels Offer
Utility Engineers, PC.  Generation  Transmission  Distribution.
CUE – Make Any Pump an E-Pump
Make the most of your energy December 2008 HDM Accurate measurement and electrical utility cost allocation for multi-tenants PowerLogic ® High Density.
Shore Power System General Location. Shore Power Power comes on to the vessel in the form of 480 Volt, Three Phase, 60 Hz Alternating Current (A/C) electricity.
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
YOU’VE GOT THE POWER!. When the grid goes down, which type of system do you want for emergency power: battery or generator? Either type will get the job.
It’s…….
Asahi/America Electric Actuators
Automatic Transfer Switches
Sub Station.
Solar PV Updates PDE Summit, December 2009
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
DESCRIPTION AND GUIDE TO OPERATIONS
Charging Stations.
Mersen’s Fused Coordination Panelboard
HVI HIPOT TEST SET Pft sERIES.
Practice Code Look Up Two Minute Drill #7
Zero Tolerance Rules What?
Power Distribution Blocks
Asahi/America Electric Actuators
Personal Protective Equipment
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
EET 323 – Electrical System Design Lecture 4: Wiring Devices
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Dominion Energy South Carolina: Solar Equipment Requirements
Presentation transcript:

The Vanjen Group • Manufacture's Representative – Power Generation/Oil & Gas • Covering TX, OK, LA, AK, in some cases NM and MS • Extensive Power Gen Experience • Extensive Docking Station Experience – Design, installation, operation

Visit www.vanjen.net Brochures, Guides Specs, Data Sheets, Our Blog, Contact Info, Links to our manufacturers websites, & Presentations

Trystar’s History Welding cable wholesaler, 1994 Pacific Dunlap Manufacturing Opened current factory in 1996 Electrical distribution equipment, 2008 Temporary Power Docking Stations Entertainment panels Industrial panels Utility

Typical Load Bank Hook-Up Disconnect output load leads from generator circuit breaker and terminate load bank leads on circuit breaker Leaves customer exposed during an outage Cable terminations exposed during operation Genset needs to be taken out of commission for connection Terminate load bank cables to the input side of generator circuit breaker Load bank, generator set, & cables are not protected from a fault Genset needs to be taken out of commission for terminations Terminate load bank cables to the generator bussing at the alternator Load bank, generator set, & cables are not protected for a fault

Typical Roll Up Genset Connection Remove generator leads from on site ATS and tie in temp gen leads Emergency power system must be taken out of commission to connect Qualified electrician recommended to complete terminations Long down time to hook up unit Site specific places to hook-up – Off switchboard, at genset breaker, at utility service entrance, etc. Power sources must be isolated and taken out of commission

What is a Docking Station? Solutions to the problems associated with quickly, safely and legally hooking up and disconnecting portable generators before, during and after extended power outages, safely and economically load testing permanent generators and maintaining automatic transfer switches. Units can be rated up to 4000A ETL testing will be completed on entire product line by end of 2013

Features & Options Tamper Resistant - Patented “Rake System” - prohibits removal or tampering with Cam-Lok cables while in use and bottom door eliminates unwanted pests when locked and not in use. Tuffcoat Textured Powder Coating – Standard ANSI Gray or specific color, tough scratch and UV resistant. Aluminum or Stainless Steel Construction Kirk Key Interlocks for access or on breakers Phase Rotation Monitor – Indicates correct phase rotation of generator hookup for phase sensitive equipment such as A/C, chillers and pumps. All required lugs for building, utility and/or generator – specify mechanical or crimp.

Features and Benefits (cont) “Utility On” LED – Lets you know that utility power is back on. Leg Kits – Allows for pad mounting wall units Extra Depth Units – Allows for additional wiring and/or bottom conduit access for wall units. Power Outlets – When required for battery chargers and block heaters 2 Wire Auto Start – Required for ATS interface SCADA Monitoring Port All Units can be SE Rated. Each project is going to be different. Let us know yours and we can design an application to make it work.

Various Applications Standard Docking Station- Basic docking station. No back feed or circuit protection; transferring done external to docking station. Automatic - Docking Station is wired to ATS and setup with 2 wire auto start, 120V outlet for battery charger and block heater. If intercepting utility feed, the switch must be Service Entrance Rated with a Main Breaker. No amperage restriction. Kirk Key Access - Utilizes a captive key interlock in a building or permanent generator’s existing Service Entrance or disconnect as the means of isolating the primary power source. Rotary - Docking Station and manual transfer switch are in one common enclosure. Available in Service or Non Service Entrance Rated. Available up to 1200A. Single or Dual Breaker Kirk Key Accessed - Used when a combination of “Main Breaker”, portable generator breaker, permanent generator breaker, load bank or ATS By-Pass Isolation breaker is needed.

Standard Docking Station Basic docking station. No back feed or circuit protection; transferring done external to docking station.

Automatic Automatic Transfer Switch with Docking Station - Docking Station mounted and wired to any automatic transfer switch. Available as Service or Non Service Entrance Rated - Available up to 4000A. Includes 2 wire auto start terminal and phase rotation monitor. Available with battery charger and water heater outlets; even fuel alarm terminals and switch position. Available in NEMA 3R and 4X UL listed. Available in aluminum or stainless and powder coated any color. Available with lockable external load bank receptacles for permanent generator. Available in wall or pad mount designs. Customer can drop ship their ATS, have Trystar mount and wire the Docking Station, repackage and then deliver to the job site.

Attaching to transfer-switches Ship the transfer switch and Trystar will mount the GDS to the TS, and ship it to the job-site.

Kirk Key Access Kirk ® key is on the building’s main or genset main breaker. Key is captive To release key, turn main to off. This releases the only key that will unlock the Trystar Docking Station. The key in Trystar’s Docking Station remains captive until the GDS is closed, and locked, and all cable is removed.

Kirk Key Access

Alternative KK Access

Alternative Kirk Key Access

Rotary Docking Stations Utility-Off-Generator, up to 1200A (soon 3000A) Option for Service Entrance Rating Same Cabinet as our large GDS Handle is inside or outside mounted

Rotary One Line

Trystar’s Dual & Single Kirk ® Key Docking Stations Applications where there is a permanent generator Simultaneous load banking and standby generator Load bank connection point, and portable connection point

DBDS-SBDS One Lines

DBDS-SBDS One Lines

DBDS-SBDS One Lines

Other Options and Applications Retail Docking Station – Includes both mechanical lugs & cam-loks. Emphasis on operator safety. Generator Roll-up Box (GRUB) – All mechanical lugs, very basic pad mount units. Output Docking Stations – Primarily for temporary chiller Rental ATS/GDS products

Retail Docking Station Kirk Key option as transfer method Comes with a breaker Dual inputs cam lok and hard wire ETL Listed up to 600A with breaker

Company Switches, Output Docking Stations Includes mechanical lugs suitable up to 800MCM THHN cable Trap door access for easy hard wire connection Secondary door offers additional protection between generator and electrical load UL & C(UL) 50 Listed enclosure, NEMA 3-R

Company Switches, Output Docking Stations Options include breakers and metering

Trystar Rental Docking Station/ATS Combined with a non-Trystar transfer-switch Designed to travel Multi-voltage available

Case Study, C-Store Dallas TX C-Store has 100 locations Stand-by Generators owned: 15 Contingency contracted for: 30 Total: 45 An ice storm knocks out utility power at 80 locations. It takes 2 days to energize 45 locations. 35 are left without power. No generators are available. Within 2 days power is restored to ½ of the stores (22). C-Store cannot find an electrician to disconnect the stand by units. They are busy turning people on, not off. C-Stores remain out of power, losing an average of $100,000/day in sales revenue. Solution: Trystar Docking station that the generator rental company can connect/disconnect and relocate the stand-by units.

Product Pictures

Product Pictures

Product Pictures

Product Pictures

Product Pictures

Questions/Comments