Iceland and the European offshore electricity grid

Slides:



Advertisements
Similar presentations
Unconventional Gas and EU Energy Policy
Advertisements

A 2030 framework for climate and energy policies Marten Westrup
DG Energy and Transport, European Commission Fabrizio Barbaso 16/04/2008 EU ENERGY SECURITY STRATEGIES ARF Energy Security Seminar EUROPEAN COMMISSION.
1 EU Strategy for the Baltic Sea Region as a tool to implement the EU2020 European Commission Directorate General Regional Policy Territorial Cooperation.
The Connecting Europe Facility
Pécs Midterm review of the achievements of the Hungarian Presidency of the Council of the European Union András Rozmer Department of Strategy.
How to improve the technical and financial management of the TEN-T projects? Ioannis Giogkarakis-Argyropoulos, Head of Unit T2 – Road and Rail Transport,
An accessible and attractive region: to improve internal and external transport links Aleksandrs Antonovs EU Funds Managing Authority in Latvia.
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
Vision for the internal electricity market
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
1 European Union Regional Policy – Employment, Social Affairs and Inclusion Addressing challenges in a changing world: -The future Cohesion Policy- Wolfgang.
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Oceans of opportunity Harnessing Europes largest domestic energy resource European Offshore Wind Conference September 2009 Justin Wilkes Head of.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
The Internal Energy Market: Remaining challenges and the role of wind power Paul Wilczek Senior Regulatory Affairs Advisor – Grids and Internal Market.
Europe's priorities Our goals Why a 2030 framework now?
Energy Infrastructure Package Regulation on guidelines for trans- European energy infrastructure & preparation of PCI identification in 2012 European Commission.
Completing the EU internal energy market IFIEC, 22 November 2011
TEN-T R EVIEW AND “C ONNECTING E UROPE F ACILITY ” CPMR PROPOSALS LISBON 6 March 2012.
Baltic Energy Market Interconnection Plan (BEMIP)
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Jonathan Walters Sector Manager, Energy and Transport Middle East and North Africa World Bank.
Douwe Cunningham Secretary General
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Olje- og energidepartementetwww.oed.dep.no The energy sector and policy challanges in Europe. Viewpoints from Norway Johan Vetlesen Deputy Director General.
1 Ministry of Environment, Energy and Climate Change of the Hellenic Republic Project Helios The Greek Solar Energy Project Hamburg, 5 th September 2011.
Completing the EU internal energy market
BWEA OFFSHORE CONFERENCE 17 – 18 APRIL 2002 Offshore Consents Planning for the Future Nigel Peace Director, Energy Regulation Department of Trade & Industry.
Do we need to rethink our energy system(s) to meet 2030 goals? Justin Wilkes, Policy Director European Wind Energy Association (EWEA) 25 April 2013.
1 Justin Wilkes Public Affairs Advisor European Wind Energy Association RESTMAC workshop Warsaw 11 October 2007 Achieving the 180 GW of wind power in Europe.
Improving Network Access in Europe’s Periphery Panos Coroyannakis CPMR Energy Working Group “Energy for the Periphery” Pamplona 5-6 October 2006.
EU Energy Strategy
Errol Close Decarbonisation Policy and Co-ordination IWFA May Conference.
Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC
RETHINKING THE ELECTRICITY GRID RETHINKING THE ELECTRICITY GRID 14 May 2012 Presented by: PATRICIA DE SUZZONI ADVISOR TO THE CHAIR OF CRE (French Energy.
New Offshore Wind Tenders in Denmark 1,450 MW before 2020.
Energy Tom Howes DG Energy European Commission Europe's renewable energy strategy.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Background: 27 November 2007, FREDS EU Network became the Scottish EU Energy Network. Main objective: To raise Scotland’s profile in Europe ? ? ?
WIND ENERGY Is there a Latvian Master Plan? CHRISTIAN KJÆR Chief Executive Officer European Wind Energy Association SSE Riga, 4 December 2008 © EWEA/L.
Key developments and challenges in the Nordic region - Eurelectric Members’ Day Oluf Ulseth CEO, Energy Norway Brussels, February 6, 2012.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
EUROPE’S ENERGY EXPORTER Neart na Mara. source EWEA.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Generation and transmission interconnections 4 July, 2013 Virgilijus Poderys CEO of LITGRID AB.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Chryssa Argyriou Directorate B – Security of supply, Energy markets & Networks Unit B2 Electricity and Gas Sofia, Energy Day, 18 June 2010 Energy Infrastructure.
20th Century Electric Transmission Grid
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
EU Infrastructure charging and investment policy Christophe Deblanc DG TREN.
The added value of the Wind Energy Roadmap Christian Nath – TPWind Executive Committee.
European Wind Energy Conference & Exhibition May 2007, Milan 1 Jens Bömer Consultant for International Aspects of Wind Energy on behalf of the Federal.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Conference organized by: Union for the Mediterranean High Level Conference on the financing of the future Trans-Mediterranean Transport Network (TMN-T)
Workshop on Energy – Framework of the WS Moderator - Eugenijus Ušpuras, Lithuanian energy institute “The Baltic Sea Strategy – Region and Cohesion Policy.
1 European Investment Bank EIB's support for Energy Efficiency & Renewable Energy Investment in cities and regions - European Local Energy Assistance (ELENA)
Towards 100% RE in Denmark in 2050 Jakob Jespersen Danish Energy Agency Hai Phong, 17 December 2013 – the role of wind energy.
Bringing Offshore Wind to New England’s Shore Restructuring Roundtable
PHYS-E6572 Advanced Wind Power Technology Eero Vesterinen 79925N
GRI-S : Infrastructures The Union list of projects of common interest
Ben Voorhorst, President, ENTSO-E
European Investment Bank
The ISLES Project Bob Hanna
The role of Territorial Cooperation in IWT and integrated planning
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
RES in the North-Western EU
Presentation transcript:

Iceland and the European offshore electricity grid Justin Wilkes Policy Director The European Wind Energy Association

More than 700 members from almost 60 countries Manufacturers with a leading share of the global wind power market Component suppliers Research institutes National wind and renewable associations Developers Electricity providers Finance and insurance companies Consultants Contractors This combined strength makes EWEA the world’s largest and powerful wind energy network www.ewea.org/membership

EWEA Lead Sponsors

Tackling the flexibility challenge Variability is an inherent characteristic of every power system Flexible generation is largely provided by gas, hydro and to a lesser extent biomass Large scale DSM and new energy storage remain unavailable in the short term With an increasing supply of variable RES, improved infrastructure and access to flexibility resources become necessary. Sources of flexibility to balance variability include dispatchable (or flexible) power plants, demand-side management and demand response, energy storage facilities and increased interconnection with adjacent markets An economically viable power system with large amounts of RES will require changes in all 3 areas Source: IEA 2011, Harnessing Variable Renewables

Momentum for grid development in Europe is evident Already in September 2009 EWEA published its “Offshore Network Development Master Plan” North Seas Countries Offshore Grid Initiative signed by 10 countries in 2010 – ongoing work Offshore Grid is a key part of the European Infrastructure Package Second ENTSO-E 10-year network development plan in the making Both the Cobra cable and Krieger’s Flak have been awarded financing from the EU’s Economic Recovery Plan. In the aftermath of the financial crisis, the EU elaborated an Economic Recovery Plan complementary to its Member States. A substantial part of the money was earmarked for energy infrastructure projects, innovative, but that could start spending in a short time frame. Krieger’s Flak qualified as it will be, ultimately, a 3-way interconnector whilst Cobra cable qualified for the financing as it will have a “plug” along it in which the numerous German offshore wind farms should be able to connect to.

Prominent grid infrastructure projects: UK/Norway under consideration NorGer - Germany/Norway ministerial agreement Krieger’s Flak (Germany – Sweden and Denmark on hold) with EERP financing Cobra cable (Netherlands/Denmark) with EERP financing East-West interconnector, EIB loan (Ireland/Wales) BritNed, EIB loan (UK/Netherlands) Skagerrak 4 (Denmark/Norway)

Global cumulative wind power capacity 1990-2007 (MW) EWEA’s 20 year offshore network development plan Global cumulative wind power capacity 1990-2007 (MW) All necessary grid updates to transport all electricity produced by planned, proposed, under construction and operating offshore wind farms to European electricity consumers in an economically sound way Recommends building a transnational offshore grid infrastructure to connect: 40 GW by 2020 150 GW by 2030

Global cumulative wind power capacity 1990-2007 (MW) EWEA’s 20 year offshore network development plan Global cumulative wind power capacity 1990-2007 (MW) Based on: Existing TSO plans TradeWind scenarios Added value of plan: - Provides step by step timetable for grid development Suggested capacities Integrated with development/concession zones

Offshore grid design Lines/branches: submerged HVDC cables characterised by transmission capacity, Offshore nodes: offshore platforms containing HVDC conversion equipment, switchgear etc. to serve as: common connection points for a number of offshore wind farms; common connection points for a number of other marine generators; and intersection (junctions) of network branches. Onshore nodes: connection points to interconnect the offshore transmission grid to the onshore transmission grid. There are three basic elements which will form the backbone of the future offshore transmission network: Lines/branches: consisting of submersed cables characterised by transmission capacity, Offshore nodes consisting of offshore platforms containing HV DC conversion equipment, switchgear and so on to serve as: common connection points for a number of offshore wind farms; common connection points for a number of other marine generators; and intersection (junctions) of network branches. Onshore nodes: connection points which will interconnect the offshore transmission grid to the onshore transmission grid.

Global cumulative wind power capacity 1990-2007 (MW) EWEA’s 20 year offshore network development plan Global cumulative wind power capacity 1990-2007 (MW) All layers animated Source: EWEA 2009 10

EWEA concept one of many

Global cumulative wind power capacity 1990-2007 (MW) Building the European offshore grid Global cumulative wind power capacity 1990-2007 (MW) Benefits Predictable energy output Connections to more than one country Power trading between countries Viable alternative to onshore grid construction Connection to other marine renewable energy sources More economical utilisation of grid through shared use More energy security More interconnection capacity means more firm power Build a single European electricity market to benefit all consumers BUT: Iceland not yet part of these considerations predictable energy output and less need for additional balancing capacity wind power can be sold to more than one country possibilities of power trading between countries minimised strengthening of onshore interconnectors‘ high voltage networks possible reduction of GHG of oil and gas platforms through connection to the grid connection opportunities to other marine renewable energy sources more economical utilisation of grid capacity through shared use more energy security more interconnection capacity means more additional firm power => The future European grid will contribute to building a well-functioning single European electricity market that will benefit all consumers

Current EU approach to facilitate grid developments Current TEN-E programme is insufficient - COM investment estimates 2010-2020: Electricity: 140 bn € (onshore, offshore and smart grids at transmission and distribution level) Gas: 70 bn € TEN-E budget 2007-2013 was increased from 155 mln € to currently 5.1bn € 2014-2020 in the „Connecting Europe Facility“ and revised guidelines on TEN-E

Agreement on Trans-European Networks Main elements: Priority infrastructure corridors agreed – all renewables focussed Northern Seas offshore grid North-South electricity interconnections in Western Europe North-South electricity interconnections in Central Eastern and South Eastern Europe Baltic Energy Market Interconnection Plan in electricity Priority thematic areas agreed electricity highways smart grids national/regional TSO coordination (along the lines of CORESO, CECRE) PICs and PTAs have: Permitting and planning deadlines of 3 ½ years (binding...) Access to CEF/TEN-E funding

A European Offshore/Supergrid What is needed from the European stakeholders (+TSOs and Regulators): A European approach towards an optimised European electricity system should be promoted. Acknowledge that a European Offshore/Supergrid will be beneficial rather than costly for consumers. Design and implement schemes that favour investment decisions, and ensure a cost recovery for the investors, especially on cross-border projects, which require a more coordinated approach. Coordination is critical for tackling the challenges of potential distortions created by different interconnection regimes. take into account the long-term economic benefits of improved transmission, as demonstrated in European transmission studies (TradeWind and EWIS)

Recommendations for Iceland Explore bilateral cooperation possibilities in energy policy in general Particularly with the UK (in progress) Make best use of regional cooperation fora North Seas Countries Offshore Grid Initiative ENTSO-E regional group for North Sea grid development Use EU legislation Renewable Energy Directive 2009/28 cooperation mechanisms

Recommendations for Iceland Explore business case for electricity exports to UK Explore feasibility of HVDC interconnectors Address technology challenge Address financial risk

Ongoing challange: How to create a facilitating environment for private and public investments in energy infrastructure in the EU Issue for TSOs/private investors: Most interconnectors might have good business case, but access to equity is difficult Private investors often lack awareness on why investments in energy infrastructure are viable (low ROR, but also low risk, especially interesting for institutional investors) Environment slowly changing: e.g. Mitsubishi engagement in Tennet to jointly invest in four offshore grid connections in Germany Need to create a better investment framework for infrastructure Investments: recognised in the European Infrastructure Package TEN-E budget should be used to leverage private finance, be that EC Project bonds or equity, rather than grants

EWEA’s next 20 Year Offshore Network Development Plan?

Thank you www.ewea.org EWEA 80 RUE D’ARLON B-1040 BRUSSELS F: +32 2 213 1890 E: ewea@ewea.org www.ewea.org