Calibrated Energy Models: One New Change

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
eQuest Quick Energy Simulation Tool
HEALTHCARE BUILDING AUTOMATION
DOE-2 Overview and Basic Concepts. Background  US public domain programs from 1970s Post Office program; NECAP (NASA energy- cost analysis program);
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
The SunAirCool Eco Power Station
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
Make the most of your energy Head Office – Case Study.
University of Liège Faculty of Applied Sciences Thermodynamics Laboratory Workshop “Commissioning and Auditing of Buildings and HVAC Systems” Use of a.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
1 Modeling of HVAC System for Controls Optimization Using Modelica Wangda Zuo 1, Michael Wetter 2 1 Department of Civil, Architectural and Environmental.
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
Variable Frequency Drives VFD Basics
Using Benchmarking to Identify Energy Efficiency Opportunity in Cleanrooms; The Labs 21 Approach William Tschudi and Peter Rumsey June 29, 2004
Model predictive control for energy efficient cooling and dehumidification Tea Zakula Leslie Norford Peter Armstrong.
Energy Performance Analysis with RETScreen
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Electrical Engineering Fundamentals for Non-EEs; © B. Rauf
Grid-interactive Renewable Heating Paul Steffes Steffes Corporation
Workshop « Commissioning and auditing of buildings and HVAC systems » Brussels, January 28th, 2008 Identification of heat recovery on chiller condenser.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
BPA Pre-Pilot, Monmouth  14 homes with installed DHP, single zone, single compressor.  11 Monmouth, 2 Moses Lake, 1 Tacoma  Savings.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
SEEM Tool Overview Regional Technical Forum Member Orientation January 22, 2013.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
Managing Operational Energy in Buildings
Aristotelis Botzios-Valaskakis MSc Mechanical Engineer Division of Development Programmes Building Energy Performance Reliable Predictions ESCO’s point.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Chilling at Penn: Weather-Analysis of Load Tool (WALT) Abstract: Penn’s MOD 7 plant supplies chilled water to the entire campus for its air- conditioning.
Challenges of Localized Cooling Systems
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
Lecture Objectives: Finish with software intro HVAC Systems
The EnergyMizer Power Reduction & Conditioning System ®
Evaluation of the RTF Standard Protocol Fan and Cooling Savings from Commercial-Sector Heat Pump Units Rooftop Unit Working Group (RTUG) August 20, 2012.
Introduction to HVAC Optimization
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Unit efficiency versus Building System efficiency – Equipment Ratings EER and COP.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Metering and Monitoring  The Business Case.  Implementing the project.  Benefits – accurate data and data analysis.  On-going challenges.
ENERGY SAVING AND EFFICIENCY OF AIR CONDITION & LIGHT SYSTEMS AT PUBLIC BUILDINGS Meitav-tec (Contel group)
Free Air Cooling for Data Centres
HEAT RECOVERY VENTILATION MAKING MONEY WITH SMALL COMMERCIAL RETROFITS
Fort Stanwix National Monument Energy Audit Contract
Sean Weber Energy Engineer
Irvine Ranch Water District Distributed Energy Storage Case Study
Seminar On Energy Audit Submitted To: Submitted By:
Lecture Objectives: Discuss Final Project
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
Industrial Assessment Center Database
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.

Energy Efficient Solutions for The Inn at Otter Crest
ANSI/ASHRAE 90.4 Energy Standard for Data Centers
Validation & Prediction
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
Case Study: Marks & Spencer Oxford Street
Technician’s Guide and Workbook for Zoning Section 1: Introduction
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Equipment Efficiency Analysis
Unheated Lettuce Innovating the Climate Control Landscape
Alabama Industrial Assessment Center
Heat Pumps Reference: BSRIA BG7 / 2009.
Presentation transcript:

Calibrated Energy Models: One New Change London, UK

For most buildings, there is a performance gap between actual and predicted usage: >> Actual usage (kWh/ year) Simulated usage

Real buildings are subject to natural variations in weather, occupant behavior, and other factors Measured data Predicted input data ≠

Can we employ post-occupancy performance modelling to close the performance gap? = Actual usage (kWh/ year) Simulated usage

Case Study: One New Change project This project set out to assess potential benefits of post-occupancy performance modelling. This strategic activity encompasses building energy modelling, post-occupancy monitoring, model calibration, energy conservation measure (ECM) assessment, and a continuous cycle of adjustment and improvement. EDSL worked alongside industry partners on this project funded by Innovate UK, a government-backed initiative to foster productivity and economic growth through business-led research, development, and implementation. The project consisted of analysing a mixed-use retail/ office building located near St Paul’s Cathedral in London. The team sought to identify opportunities to optimize energy efficiency without sacrificing occupant comfort or building services.

Building Operations Data was collected from the facility while in operation. A weather station was installed on the building’s roof to capture conditions as accurately as possible. Utility bills, metering data, O&M data and BMS system data provided a complete picture of the overall loads, usage patterns, and performance drivers. BMS screen grabs Utility bills Metering data Onsite weather station O&M data

Plant Room Model Retail unit’s HPs Retail condenser loop GSHPs Office boilers Condenser loop boilers DAC Office FCUs and AHU heating Office chillers Office FCUs and AHU cooling Ground loops

Office Airside Model Typical AHU and FCU system diagram

Overall Simulated Performance Billing data vs simulation Gas and electricity billing information was supplied for the July 2015 - June 2016 time period. There were two billing anomalies in the data: No gas information for June, and January’s consumption included data from a prior month. Including the two anomalies, peak monthly error = 12.2% (Jan 2016), and average annual error = 5.5% Total simulated annual energy cost: £1,778,084 £ 1,602,217 grid-supplied electricity £ 175,866 natural gas Total simulated cost is within 2.5% of billed cost, with the difference being mainly on gas. This cost will be used to calculate savings on energy conservation measures. Monthly Energy Consumption (MWh) actual Tas simulation

Detailed Simulated Performance Whilst the overall simulated performance matches well with the actual performance, good agreement was also found in the detailed performance of individual components and process. A few of these will be highlighted: Retail condenser loop temperature Ground loop temperature Office humidity control

Detailed Simulated Performance Measured Simulated Detailed Simulated Performance Retail condenser loop temperature (C°) Due to high heat rejection from the retail units in the summer months the condenser loop temperature reaches a peak of ~44°C. The simulated peak is ~42°C at the same time of year. The shape of the variation in condenser loop temperature is identical for monitored and simulated data. This is because the observed weather data is being recorded on-premises and is used within the Tas model. Heat is extracted from the condenser loop by the dry air cooler (DAC). Monitored Data Simulated in Tas

Detailed Simulated Performance Ground loop temperature Spikes and drop-outs may be ignored One New Change’s ground loop uses 13 ground-source heat pumps (GSHPs) to supply heating and cooling to the retail and office systems. These graphs show monitored flow temperature from Total simulated annual energy cost: £1,778,084 £1,602,217: grid-supplied electricity £175,866.50: natural gas Total simulated cost is within 2.5% of billed cost, with the difference being mainly on gas. This cost will be used to calculate savings on energy conservation measures. Monitored Flow Temp the ground loop to the GSHPs from mid- August to the end of 2015. The simulated temperature is shown for the last 6 months of 2015. Simulated Flow Temperature

Detailed Simulated Performance Office humidity control The as-commissioned office humidity control was based on supply air absolute humidity being maintained within a range of 5.3g/kg and 6.3g/kg. It resulted in office humidity being below 40% for long periods through the year and even below 30% for a significant time. Simulations suggested that control of return air absolute humidity between 7.3g/kg and 8.9g/kg would make a significant improvement in office humidity levels. This strategy has been implemented and office space conditions have improved as predicted. Besides the improvement in occupant well being, the change in control strategy is predicted to save £61,550 per year. Office humidity during occupied hours - supply air control Office humidity during occupied hours - return air control

Further Office Comfort Improvement and Energy Savings There are two main issues with the office fan coil unit (FCU) operation affecting comfort and energy consumption: ‘hunting’, due to too small a FCU deadband setting, and local difference in thermostat control settings (as set by occupants). These issues are modelled by by setting an overlapping control band on heating and cooling for the FCU. The typical ‘hunting’ behavior design engineers’ strategy is to re-set the thermostat setting and increase the deadband by 0.5°C to 1°C. After being implemented in the Tas model, the results showed an energy saving of £150,000 and a significant improvement in occupant comfort. This aspect of the project has been important in prompting the development of more advanced FCU modelling to account for the effects of poor deadband control and setpoint variations.

Additional Performance Improvements Ground loop optimization Selecting an optimum control strategy for controlling ground loop temperature is non-trivial, due primarily to the variation in heat pump performance. Tas GenOpt can be used to perform a parametric study optimizing setpoint and size of control band. The table below gives an indication of the best approach. Starting with a base case of 16°C setpoint and a band of 27°C, the following table shows the percentage energy reduction (or increase) for each alternative. Office humidity during occupied hours with supply air control Office humidity during occupied hours with return air control   Setpoint (°C) 10 13 16 19 22 Band (°C) 27 0.00% 3.14% -0.85% 0.87% 41.55% 49.82% 47.10% 42.82% 45.63%

Case Study: One New Change project Conclusion Case Study: One New Change project This project demonstrated the benefit of post-occupancy performance modelling. The One New Change project was able to improve system performance and occupant comfort, leading to significant operational cost savings and potential gains in occupant productivity and well being. Additional use cases for similar studies include proforma analyses for potential projects, in order to calculate projected rates of return on improvements or new construction projects. One New Change, for example, would have yielded a 20% ROI solely from existing systems optimization. As demonstrated, Tas’ dynamic simulation engine is well suited for performing such studies due to its innovative capabilities in creating unique plant room and airside systems and the accuracy of its simulations. Tas offers integrated data and systems inspection, quick, easy-to-use data visualization tools, and transparent, easy access to data for use in other applications.