Armaphalt – Site mix hot asphalt

Slides:



Advertisements
Similar presentations
_____________________________________________ Climate Challenge Fund What type of project would help your community? February 2013.
Advertisements

HSC08 Conference Report to YHAUC by Sean Fisher. HSC08 Conference Thanks to YHAUC for the opportunity to attend Views and opinions expressed are my own.
Sustainability is Good for Business HOUSEKEEPING DEPARTMENT.
Sustainable AmbITion Project – Our Journey. Who are we? We are a maker organisation made up of a board of applied arts professionals from across Scotland’s.
Ms Ikmalzatul Abdullah BITUMINOUS MATERIALS. Definitions: Binder: A material used to hold solid particles together, i.e. bitumen or tar. Bitumen: A heavy.
Energy Supporting Energy 1 1 DROPS Forum 12 th April 2011 Ron Martin Corporate HSE Advisor.
CITB Apprenticeships Euan Hastie – Apprenticeships Officer (Borders) Introduction.
Patching Potholes Warm Springs Indian Reservation Road Maintenance Presentation 50 # Bag Cold Patch vs Stockpiled Cold Mix Hauled From Batch Plant Near.
Cairo project. Aims and objectives Greater Cairo faces a range of environmental problems, which together form the Brown Agenda The problems fall into.
Domestic Electric Heating Chris Davis Marketing Manager, Glen Dimplex UK Electrex – 17 th May 2006.
Sustainability is Good for Business PURCHASING. Introduction –Our customers are looking for accommodation that is working to improve its sustainability.
Will Segway Change The Industry? Team II-A Two Key Facts: Transportation Industry must change Human transporter will provide unique solution "Segway human.
Fighting Transportation Myths with Reality Since 2011, Gov. Rick Snyder has called on the Michigan Legislature to dramatically reform Michigan transportation.
WASTES TRANSFER AND TRANSPORT.  Facilities and appurtenances used to effect the transfer of waste from the one location to other, usually more distance,
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
Green Office Certification August 14, Why Become a Certified Green Office? To raise awareness of steps that can be taken in the workplace to reduce.
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
TNT SHOWCASE AUTOMOTIVE MANUFACTURER A multinational, American automotive manufacturer operating twelve manufacturing plants that service the European.
Office Recycling Solutions Security Shredding Recycling & Waste Management ‘Make a difference in the community & recycle’ ‘Paper, cardboard, polythene,
Should governments subsidise rail fares? To see more of our products visit our website at Steve Earley.
Trade Skills Print Reading and Ductwork. 2 Drawings are a useful tool in manufacturing and construction because most people find it difficult to.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
AIMS AND OBJECTIVES PACKAGING
1 Polska Telework 2007 – European Best Practices Jolanta Jaworska Public Programs Director IBM Polska.
Battery Models. EMF and voltage What is EMF? – Electro Motive Force What is the difference between EMF and battery voltage? – The battery has internal.
Fenland Green Business Club Waste Seminar 27 th April 2010 Simon Chiva Programme Manager Resource Efficiency East.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Oklahoma Rural Water Association Contest Basic Information.
Conceptual change with NDIS
Antoine Gatt.
What a load of Rubbish - Overview Of Project
Tracking, Measurement and Analysis
Dulles Airport Operations
European Asphalt Pavement Warranties Scan
The Design Team Carl James.
Pothole Patching Alternatives
Environment Challenge 19 & 20 May Mini-Eden Project
Warranty procedure Index Overview
Fighting Transportation Myths with Reality
Explaining how modern IT has had an impact on working practices
Resurfacing Car Park works
Knowing how to clean up and how to store clay
Our mission is to accelerate the move to a sustainable,
Currency Exchange Rates Paddington | Monex International UK
Presented By: AnyTimeHVAC. At Anytime Heating & Cooling, our knowledgeable and experienced professional providing the best air conditioning service. Our.
Provide the Best App Marketing Service In Dubai Call
Prospecting for Expired Listings
*YOUR NAME*, *Your role*
InclusivEV; Integrated, Smart, Low Carbon, Shared Mobility
Considerations FOR more durable hma pavements
Malcolm Simms 16 November 2016.
WHO ARE HERS RATERS? RESNET & You: The Future of Energy Ratings.
NanoSoil Nanotech Construction Products Limited.
Why Challenge the Status Quo?
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
BECAUSE OF ATMOSPHERIC OXIDATION DURING STORAGE AND HANDLING.
Creating Durability on the Network
Please read this before using presentation
Magnetite-Asphalt POT HOLE REPAIR
Over 1 million potholes filled in 2018 at a cost approaching £100m.
Reducing Stormwater with Trees and Native Plants
The future for plant hire… the Hewden perspective.
SOLID WASTE MANAGEMENT PRINCIPLES
Why going for car repair services is important?
Presentation transcript:

Armaphalt – Site mix hot asphalt Innovative Repair Material Hayden Davie B.sc (Hons) 07793250771 haydend@joblingpurser.com

Contents Points we aim to cover Who are Jobling Purser Identifying the need for change What is Armaphalt Benefits of using Armaphalt Process of using Armaphalt Demonstration video

Who are Jobling Purser? Develop, manufacture and produce a vast range of bituminous products Family run business since 1830’s Two asphalt plants in the North of England

Identifying the need for change Poor state of UK road network Cracking Deformation/Rutting Potholes Disruption to public, and road users Lack of cost effective, sustainable repair solutions Why are we constantly having this problem? Insufficient time available? Insufficient funding? Incorrect use of materials? Lack of time, for correct workmanship (splat, pat, dash)? Poor reinstatements? Can we do something about this?

Armaphalt Site mix hot asphalt what you want, where you want, The solution!!! Armaphalt Site mix hot asphalt what you want, where you want, when you want.

What is Armaphalt? Jobling Purser started to develop and create the Armaphalt range in 2012-14 Armaphalt is a bagged site mix hot asphalt, that conforms to all relevant material specifications: EN 13108 PD 6691 SHW SROH Armaphalt is used in conjunction with a mobile low volume asphalt heaters

Benefits of using Armaphalt Zero Waste No down time Increased productivity Flexibility Right first time

Benefits of using Armaphalt Zero Asphalt Plant Charges Various materials Reduction in potential for failures Recycling Sustainability

Standard Reinstatement Process Head back to yard (if different location to waste drop off) Leave sites early to dispose of any waste Travel to next site Clean up patch area Recover material so it doesn’t lose heat Reinstate patch from material on wagon Prepare area Travel to site Wait in asphalt plant traffic Travel to asphalt plant Load tools onto wagon

Time Cost Quality Rushed jobs to accommodate fast cooling materials Increased potential for failures Poor quality materials being used due to temperature Incorrect material sometimes used due to unavailability of space Sometimes only temporary materials used Air void failures, ravelling, rutting Revisiting sites numerous times Morning trip to asphalt plant Delay in asphalt plant traffic Trip from asphalt plant to site Site work Leaving site early to dispose of waste Trip back to depot if different location to waste disposal Further time needed to revisit sites Extra diesel for going to collect from plant Material costs Extra diesel travelling to site Increased traffic management window Extra diesel disposing of waste Potential charge for waste disposal Cost associated to original price of material wasted Revisiting sites to repair failed temporary reinstatement If revisit is required, starts again from point 1 Asphalt plant opening charges

Outcomes of using conventional methods Larger increase in negative outcomes High costs Longer time needed to be spent on site Delays/inconvenience/disruption for public High production of waste Heavy carbon footprint High risk of failed reinstatements Reoccurring problem areas Continuing poor road network

Process of using Armaphalt Tidy area and head to the next repair Carry out repair Discharge material from plant into wheelbarrow, or direct to patch Check temperature of material Prepare area for reinstatement Load bagged Armaphalt material into mobile low volume asphalt heater Transport the materials, crew and tools direct to site Prepare your wagon at yard or depot

Time Cost Quality Diesel for days work Correct temperature material used all day Correct specification material used for repairs No compaction/air void related failures Increased longevity of repairs Load wagon in yard and head to site Heat up the materials Carry out required site work Head back to yard at end of full shift No need to revisit completed sites Diesel for days work Material costs – only what’s used Standard traffic management requirements No visits back to same sites

Outcomes of using Armaphalt Larger increase in positive outcomes Decrease in costs Decrease in time spent on site Decrease in delays/inconvenience/disruption for public ZERO production of waste Reduction of heating times Decrease in carbon footprint Right first time Increase in quality Increase in productivity/efficiency Increase in longevity of repairs Overall increase in sustainability

Armaphalt demonstration video Using Armaphalt Armaphalt demonstration video

Any Questions? Armaphalt Site mix hot asphalt what you want, where you want, when you want.

Further Details For further information with regards to Armaphalt and to arrange a demonstration/meeting please get in touch with: Hayden Davie 07793 250771 haydend@joblingpurser.com Or for further information about other products we are able to offer please contact either Hayden or a member of the sales team at sales@joblingpurser.com 0191 273 2331

Thank you for your time