© 2009 Dominion August 5, 2009 Underground Transmission Lines at Dominion Virginia Power Update for the Joint Committee on Technology and Science Presented.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Community Wind Development
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
1 Copyright Copyright 2012.
1a. Construction employment in the United States, (All types of employment) Source: U.S. Bureau of Labor Statistics, Current Population.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
1 Amazing Bridges of China By : E. Cheong /43.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
ABC Technology Project
electric power engineering
AEGEAN INTERCONNECTION PROJECT Athens, 24 th May, 2011.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
1 Recognize Any Hazard(s)?. 2 Yes No employer shall permit a worker to work in such proximity to any part of an electric power circuit that the worker.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Figure Essential Cell Biology (© Garland Science 2010)
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
How Cells Obtain Energy from Food
Energy Generation in Mitochondria and Chlorplasts
CpSc 3220 Designing a Database
Innovative solutions in rights of way to support broadband development Antti Kohtala Ministry of Transport and Communications Finland Digital Agenda Assembly,
Presentation transcript:

© 2009 Dominion August 5, 2009 Underground Transmission Lines at Dominion Virginia Power Update for the Joint Committee on Technology and Science Presented by: Kevin Curtis Dominion Virginia Power Director – Electric Transmission Planning August 5, 2009

© 2003 Dominion 2 © 2009 Dominion Approved Underground (UG) Transmission Projects Currently Under Construction Garrisonville (Stafford Co.) – dual 230,000 volt lines Clarendon/Ballston (Arlington) – 230,000/69,000 volt lines Future UG Construction (2010) – HB1319 projects Pleasant View/Hamilton (Leesburg, Loudoun Co.) – 230,000 volts NIVO Substation (Ashburn area, Loudoun Co.) – 230,000 volts

© 2003 Dominion 3 © 2009 Dominion Related UG Legislation in Virginia HB1319 – Delegate May Allows for four UG transmission pilot projects in Virginia Two approved to date HB1729 – Delegate Cole Structure for customers in local jurisdictions to pay for UG transmission Authorizes the governing body of any locality to enter into an agreement with an electric utility that provides that the locality will impose an assessment on customers in a special rate district to cover the utility's additional costs of constructing, operating, and maintaining the proposed line as an underground rather than an overhead line

© 2003 Dominion 4 Garrisonville (Stafford County): 230kV SCC Final Order for UG in April 2008 Just north of Fredericksburg Target Date – Garrisonville Sub. Aquia Harbor Sub. 230kV double circuit line Fredericksburg

© 2003 Dominion 5 © 2009 Dominion Garrisonville Project – Understanding UG Construction Project Overview 5.5 mile double circuit (11 line miles) Serves new substation in Garrisonville area Utilizing XLPE (cross-link polyethylene) cable – 6 cables/line (12 total) Work began in December of 2008 – 25% complete Cost Breakdown Overhead estimate - $14M ($1.3M/mile) Underground projection - $120M ($11M/line mile) -8.5 times cost of overhead

© 2003 Dominion 6 © 2009 Dominion Garrisonville Project – contd Construction Overview Rolling terrain and rocky soil conditions Interstate and highway crossings Trenching and horizontal directional drilling (HDD) -70% trenching Continuous excavation along right of way Two 5-foot trenches separated by 20 feet Conduits encased in concrete -30% drilling Right of way clearing required for installation of conduits Four 42-inch holes: each requires 3 passes – 12, 28, 42 Conduits encased in grout-type mixture

© 2003 Dominion 7 © 2009 Dominion Garrisonville Project: Trenching configuration Line #1Line #2

© 2003 Dominion 8 © 2009 Dominion Garrisonville Project: Drilled hole configuration Line #1Line #2

© 2003 Dominion 9 © 2009 Dominion Garrisonville Project – contd Construction Challenges Terrain and road crossings – requires drilling ($$) Soil conditions -Drill rates Slow progress - 6 inches per hour in some locations Took three months to drill first of 4 holes under Interstate 95 -Frac-out – drilling mud eruptions in proximity of drill site 100,000s of gallons at 100+ locations Drilling stops until all material recovered and site cleaned up -Sink holes Noise/vibration of drilling equipment has become problematic for some residents and businesses Weather – extensive rain affects drilling and trenching

© 2003 Dominion 10 © 2009 Dominion Garrisonville Project – contd Cost Drivers Construction complexity of UG requires more time and personnel months -150 personnel Cable prices -$850/line foot (for each set of 6 cables), $4.5M/mile for each line Rolling terrain requires drilling which adds significant cost Soil conditions (drilling rate and frac-out) Right of way acquisition: previously purchased easements were for overhead line - did not have UG easements

© 2003 Dominion 11 © 2009 Dominion Garrisonville Project – OH vs. UG Comparisons

© 2003 Dominion 12 © 2009 Dominion Right of Way Clearing

© 2003 Dominion 13 © 2009 Dominion Installing conduits for cable in open trenches

© 2003 Dominion 14 © 2009 Dominion Concrete encasement of conduits

© 2003 Dominion 15 © 2009 Dominion Horizontal Directional Drilling (HDD)

© 2003 Dominion 16 © 2009 Dominion Horizontal Directional Drilling (HDD)

© 2003 Dominion 17 © 2009 Dominion 42 Drill Bit (Reamer)

© 2003 Dominion 18 © 2009 Dominion Conduits being prepared for drilled holes

© 2003 Dominion 19 © 2009 Dominion Conduits being prepared for drilled holes

© 2003 Dominion 20 © 2009 Dominion Cable splice connections in vault (located every 1800 feet due to cable length limitations)

© 2003 Dominion 21 Arlington Area – Clarendon/Ballston/Rosslyn: 230/69kV UG 2.5 miles $60M Located in streets XLPE cable Extensive community information effort Target Date – October kV and 69kV lines 69kV lines Rosslyn Sub. Ballston Sub. Clarendon Sub.

© 2003 Dominion 22 © 2009 Dominion Picture Arlington Area – Clarendon/Ballston/Rosslyn: 230/69kV UG

© 2003 Dominion 23 Pleasant View – Hamilton: 230kV Partial UG 12 miles total 2 miles of UG $107M total HB1319 pilot project New substation XLPE cable Target Date – Oct miles of UG along the W&OD Trail Hamilton Sub. Pleasant View Sub. Pleasant View Sub.

© 2003 Dominion 24 3/4 mile $11M HB 1319 UG pilot XLPE cable Double circuit & new substation 200 MW load Target Date: April 2010 NIVO Substation – 230 kV Underground (DuPont Fabros Data Center Expansion) Beaumeade Sub. NIVO Sub. Ashburn Sterling