Page 1 SUISS ILOS – 20/06/2012 The ITER Project Overall Procurement Strategy and Business Opportunities ITER Organization Françoise Flament Head of Procurement.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Roads 2011 Where are we on Procurement
Planning Reports and Proposals
1 Making Contract Opportunities and Awards More Transparent Ahmet Arif Sezgin Public Procurement Authority of Turkey Rabat 03 April 2008.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Dispute Settlement in the WTO
The Implementation Structure DG AGRI, October 2005
ITER Organization, Cadarache, France
The Managing Authority –Keystone of the Control System
Grants 3.0 Departmental Administrator Review January 22, 2014.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Privacy Impact Assessment Future Directions TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Electric Bus Management System
State Agency Contracts Considerations for Performance Reviews
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
WORLD BANK Overview of Procurement Opportunities Peter R. Easley, Esq.
Checking & Corrective Action
Tendering Yuck!.
TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
Presented to: Minnesota Chamber of Commerce October 1, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Functional Areas & Positions
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Selling to the Council.
SCIA Special Circumstances Instructional Assistance
© Paradigm Publishing Inc Chapter 10 Information Systems.
Sedex: Registration and Account Set Up Instructions
Marketing Strategy and the Marketing Plan
African Aviation Training Organization
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Page 1 Assembly and Installation Information Day – 21 st May 2015 © 2015, ITER Organization ITER_D_RDUX69Page 1 Tender Processes and Rules Françoise Flament.
EuropeAid How can a private entity benefit from EC Service Contracts ? Jean-Louis VILLE Head of Unit « Finances, Contracts and Audit » Neighbourhood.
The Lean Sourcing Process
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Page 1 Electrical Supply Contract Information Day – 16 th July 2015 © 2015, ITER Organization IDM UID: iTER_D_R6QAFK Page 1 Tender Processes and Rules.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
United Nations Procurement Division
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Doing business with CERN Anders Unnervik 3 November 2014.
WELCOME TO UNB. MARK McGEEHAN Assistant Manager, Procurement Services 3 plus years with UNB 28 years in Healthcare Procurement Current member of APPA.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
Tender Evaluation and Award Process
Content of Tender Dossier - Instructions to Tenderers - Tenders
Updating the Regulation for the JINR Programme Advisory Committees
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Ways to industry participation in CLIC 24th October, 2017
The Lean Sourcing Process
Proposal submission and evaluation
United Nations Procurement Division
Candidate Registration & Induction
European Spallation Source ERIC Procurement
Roles and Responsibilities
Presentation transcript:

Page 1 SUISS ILOS – 20/06/2012 The ITER Project Overall Procurement Strategy and Business Opportunities ITER Organization Françoise Flament Head of Procurement & Contracts Division

Page 2 SUISS ILOS – 20/06/ Overview of the ITER Organization and Procurement System 2.Business Opportunities 3.IO Procurement Processes and Procedures Practical Tips for Potential Suppliers

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 3 ITER Organization (IO): The ITER Organization was formally established on 24 October 2007, following ratification of the ITER Agreement by all Members. IO is in charge of the specifications, the design, the coordination, the engineering and the interfaces, the assembly and operations. In addition, the IO is responsible for manufacturing parts of the machine. Further ITER Council decisions, the IO is also in charge of contracts signed jointly with the DAs for: -the Insurance for the Buildings and the Assembly, -the transports for all components. -the standardization of some products (PLCs, Cubicles, Port Plugs, etc…) IO is the nuclear operator. ITER Project Organization

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 4 ITER – An International Cooperation… Seven Parties, representing more than half of the worlds population, are involved in the ITER construction

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 5 The Domestic Agencies (DAs): The seven Members of the ITER Project have all created Domestic Agencies to: -Handle the procurement of each Member's in-kind contributions to ITER Project. -Act as the liaison between national governments and the ITER Organization, ITER Project Organization The Host Country (France): The Haut Représentant de la France pour ITER and Agence ITER France (AIF): - Act as the liaison between French Authorities and the ITER Organization, - Handle the preparation of the site, the welcome of the IO staff in France.

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 6 ITER Council ITER Organization Procurement Arrangements In Kind Contribution Domestic Agencies Suppliers ITER Project Organization Management Advisory Committee (MAC) Scientific &Technical Advisory Committee (STAC) In Cash Budget In Kind Budget 7 Members: -China -Korea -Europe -India -Japan -Russian Fed. -United States

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 7 Procurement Sharing A unique feature of ITER is that almost all of the machine will be constructed through in kind procurement from the Parties

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 8 Final Design Review Concept Design & Engineering studies Concept Control Documents/Specifications Concept Design Review PA Documents (Main, Annex A & Annex B) Preliminary Control Documents/Specifications Preliminary Design & Engineering studies Preliminary Design Review Final Design & Engineering studies Final Control Documents/Specifications Time Manufacturing Drawings Manufacturing / Readiness Review Different Steps of Procurement Arrangements (PA) 1 Signature of PA (Hand Over) 2 3 PA Build to Print Detailed Design PA Functional Specifications PA

Page 9 SUISS ILOS – 20/06/2012 Procurement Arrangement Status The IO and DAs have signed 73 PAs, totaling 2261 kIUA, representing approximately 77% of the total procurement value for the construction of ITER and 53% of the total number of PAs; PAs are prioritized according to the Integrated Project Schedule (IPS); 15 more PAs are scheduled to be signed by the end of 2012;

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 10 First TF conductor has been manufactured

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 11 PF COILS Facility is Completed The ITER Project entered into the Construction Phase

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 12 The ITER Project entered into the Construction Phase Anti-seismic Pits for the Tokamak Complex

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 13 The ITER Project entered into the Construction Phase HQ Building will be handed over in September

Page 14 SUISS ILOS – 20/06/ Overview of the ITER Organization and Procurement System 2.Business Opportunities 3.IO Procurement Processes and Procedures/ Practical Tips for Potential Suppliers

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 15 IO Procurement: Implementation of the Baseline Short and Medium Term Objectives The IO managements main objective is to keep the schedule and conduct a project-wide campaign on cost containment and cost savings; The priority for the IO is to finalize the design to support the Procurement Arrangements signed with the Domestic Agencies in order for them to place the contracts for the in Kind contribution launch contracts in the Members' countries, The IOs DG identified the top priorities for the design: magnet coil feeder; cryostat; vacuum vessel; central solenoid conductor, TF coil and PF coils.

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 16 The IO procures components and services for which it is responsible for example : –Design –Assembly –Certain subsystems such as helium refrigerators In some cases, the IO is also in charge of contracts signed jointly with the DAs for: –the Insurance for the Buildings and the Assembly, –component transportation ITER Organization Procurement Role

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 17 IO Procurement: the Sub-systems under IOs Responsibility CODAC : Control and Data Acquisition and Communication, Magnets Feeders Sensors, Hot cells maintenance Equipment, Part of the Cooling Water System : engineering and on-site assembly, Part of the Thermal Shield, Part of the Vacuum Pumping & Fuelling, Part of the Tritium Plant, Part of the Cryo Plant, Part of the Heating and Current Drive, Diagnostics of the First Wall. Assembly Operations and Tooling, About 900M Budget Including the R&D

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 18 Ongoing Significant Call for Tenders Vacuum Vessel Assembly Welding Liquid Helium Plants Renewal of the contracts for the Engineering support for the finalization of the design Renewal of the framework contracts for CAD and System Engineering Canteen and Catering for the ITER Site Transportation of staff/Buses Furniture of new offices CODAC support and manufacturing

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 19 Cooling Water System installation Metrology Non Destructive Testing Support of design of the ITER atmosphere Detritiation Systems Lifting and handling on site Diagnostics of the first wall Port Plugs Canteen and Catering for the ITER Site Transportation of staff Furniture of new offices Headquarters Buildings Extension Forthcoming Significant Call for Tenders

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 20 Design and Engineering for the Tritium Plant Engineering support for electrical power distribution and installations Cable manufacturing (Joint Tender) Port Plugs (Joint Tender) Metal valve contract for standardization Elastoner valve contract for standardization Forthcoming Significant Call for Tenders

Page 21 SUISS ILOS – 20/06/ Overview of the ITER Organization and Procurement System 2.Business Opportunities 3.IO Procurement Processes and Procedures

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 22 Average thresholds for the different types of solicitation : Up to 100k : Request for Quotation (duration: 3-4 weeks) Above 100k: Call for tenders (duration: 5-6 months) Specific tenders: Competitive Dialogue FIDIC Contracts Award Criteria Best value for money (most of the awards). Lowest-priced technically compliant offer, IO Evaluation Committee: established to assess the offers and recommend the award. Different Types of Solicitation

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 23 First Step: Call for Nomination (One month) IO formally invites the Domestic Agencies to nominate several potential suppliers. Second Step: Pre-qualification (One Month) Ensure that offers are sought only from suppliers who have the requested resources and experience to perform the technical requirement and perform the work at the highest satisfactorily. Pre-qualification Questionnaire includes a summary of the technical requirements and the financial statements List of companies qualified to participate to the tender Steps of IO Call for Tenders (1/5)

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 24 Third step: Call for Tender (Duration: 6 weeks to 3 months) IO Instructions to Tenderers (ITTs): Procurement schedule, Submission procedure, Commercial requirements, Price breakdown requirements. Award criteria to be used for assessing the tenders. Technical specifications, Draft contract (Special and General conditions), Steps of IO Call for Tenders (2/5)

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 25 Submission and Receipt of Tenders: A two-envelope procedure is used where the technical and financial tenders are submitted in separate sealed envelopes, The Tenderers are responsible that their tenders arrive at ITER site or other location mentioned in the ITTs on time (local time at ITER site). Late Tenders are not considered, It is important that the Tenderers strictly follow the provisions given in the Instructions to Tenderers. Steps of IO Call for Tenders (3/5)

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 26 Clarifications: In principle, tenders have all the information in the tender package and they are evaluated based on the information they submitted. However, Tenderers may request from the IO clarifications through written correspondence before the submission of the offers. The questions/answers are anonymously distributed as a single response to all Tenderers. Steps of IO Call for Tenders (4/5)

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 27 Technical evaluation : Determine whether each tender meets all technical requirements and specifications: based on individual grids signed by each voting member and a strengths and weaknesses table signed by each voting member. The Evaluation Committee may require a presentation from the companies/consortia to clarify the technical aspects of the tender. Financial evaluation If a minimum threshold for technical compliance is set in the Instructions to Tenderers, only the tenders meeting this requirement can proceed to the financial evaluation, Financial proposals are analysed according to the award criteria given in the Instructions to Tenderers. Technical and financial scorings are combined in order to select the offer representing the best value for the IO. Steps of IO Call for Tenders (5/5)

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 28 Clarification concerning Consortia : The IO encourages the companies to create consortia, Once the prequalification is completed for a consortium in a whole the composition of the consortium cannot be modified during the tender process. The members of a consortium have a joint liability towards the IO for the tender and the performance of the contract, The Consortium Leader is the signatory Party of the contract and represents the other members. Rules for Consortia

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 29 Registration on line on IO web site: Identification of the suppliers per business activities, ~ 600 suppliers registered since September 2009, No prequalification at this stage, – Procurement / General information / On-Line Registrationwww.iter.orgOn-Line Registration Point of contact: Practical Tips for Potential Suppliers Maintain normal marketing activities and regularly scan procurement information available on the IO and DAs websites.

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 30 Fusion will have to make the transition to industrialization to make an impact on the world energy economy. ITER will involve industry in an unprecedented way. ITER will provide unique opportunities for industry to develop cutting edge technologies. The experience in industry will be a critical consideration for the eventual commercialization of fusion. We look forward to working closely and effectively with industry. ITERs Success is Dependent on Industry

IO/ADM/PCD - ILO Suisse– 20/06/2012 Page 31 Thank You