IEEE 802 IMT-Advanced Technology Proposal Process

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1429r0 Submission November 2008 Bruce Kraemer (Marvell); Darwin Engwer (Nortel)Slide 1 IMT-Advanced Closing Report Date:
Advertisements

Doc.: IEEE Submission March 2008 Michael Lynch, Nortel Networks Update on ITU-R and IMT-Advanced At the November meeting IEEE 802:
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
Doc.: _SEC_Motions_Mar08 Submission March 2008 Michael Lynch, Nortel Networksh Motion to SEC Motion by: LynchSeconded by: Heile.
WP5D Meeting Results Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1181 Date Submitted: Source:
Suggestion to update Work Plan for IEEE m Standard
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
[RR-TAG Liaison Report to ]
RR-TAG (802.18) to Liaison Report
ITU-R Ad-Hoc Contact person
ITU-R Liaison Group Report - Session #73 Opening Plenary
RR-TAG (802.18) Liaison Report
Work Plan for IEEE m Standard & IMT-Advanced Submission
IMT-2020 Contribution Content
doc.: IEEE <doc#>
[RR-TAG Liaison Report to ]
IMT-Advanced Opening Report
doc.: IEEE <doc#>
Submission Title: [WG-Regulatory Report November07]
ITU-R Liaison Group Report - Session #62 Opening Plenary
IEEE MEDIA INDEPENDENT HANDOVER
RR-TAG (802.18) to Liaison Report
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Liaison Report Date: Author: Jan 2008 Month Year
RR-TAG Liaison Report January 2008 IEEE
IEEE 802 IMT-Advanced Technology Proposal Process
IMT-Advanced Closing Report
IEEE Motions in July Plenary DCN:
Liaison Report from Date: September 20, 2012 September 2012
RR-TAG Liaison Report July 2008 IEEE
IMT-Advanced Closing Report
Possible liaison motion for IEEE as an IMT-2020 technology
IEEE (RR-TAG) Liaison Report
IEEE IMT-Advanced Review Process
doc.: IEEE <doc#>
May Liaison Report Date: Authors: May 2009
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
ITU-R Liaison Group Report - Session #52 Closing Plenary
RR-TAG Liaison Report November 2008 IEEE
Comments on IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IMT-Advanced Opening Report
RR-TAG Closing Report Report of September 2008 plenary meeting
IMT-Advanced Status Report
IEEE Revision Timeline
Month Year doc.: IEEE yy/xxxxr0 May 2019
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
18 March Agenda Opening comments and attendance
Activities of ARIB on IMT Standards
GSC IMT Task Force Report
IMT-Advanced Closing Report
TTA activities on IMT-Advanced Standardization
RR-TAG Liaison Report July 2008 IEEE
TTA Activities on IMT-Advanced standardization
Month Year doc.: IEEE yy/xxxxr0 May 2019
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

IEEE 802 IMT-Advanced Technology Proposal Process Month Year doc.: IEEE 802.11-yy/xxxxr0 July 2008 IEEE 802 IMT-Advanced Technology Proposal Process Date: 2008-07-16 Authors: John Notor, Cadence Design Systems, Inc. John Doe, Some Company

The Circular Letter is being finalized. Month Year doc.: IEEE 802.11-yy/xxxxr0 July 2008 Background The IMT-Advanced (IMT-Adv) process in ITU-R has advanced to the point where: The technical requirements (IMT.TECH) are complete and approved by WP5D. The evaluation requirements (IMT.EVAL) are substantially complete, and in the process of final revision, with approval expected at the October 2008 WP5D meeting in Seoul. The Circular Letter is being finalized. Final approval of IMT-Adv documents expected at the November SG5 meeting. Interested IEEE 802 WG’s now need to consider what response(s) to make to IMT-Adv. Submit a Radio Interface Technology proposal (RIT) as a single WG. Submit a Set of Radio Interface Technologies (SRIT) jointly with one or more other WG’s. John Notor, Cadence Design Systems, Inc. John Doe, Some Company

IMT-ADV Schedule July 2008 Dubai John Notor, Cadence Design Systems, Inc.

IEEE 802 Approval Process for IMT-Advanced Submissions Month Year doc.: IEEE 802.11-yy/xxxxr0 July 2008 IEEE 802 Approval Process for IMT-Advanced Submissions A single Working Group (WG), or a joint WG collaboration, creates and submits a draft RIT proposal, or a draft SRIT proposal to 802.18 for review: Proposal requirements: draft must be complete, including self-evaluations, per ITU-R WP5D submission requirements. The WG(s) must approve the draft prior to submission to 802.18. 802.18 reviews proposals for completeness relative to WP5D submission requirements (i.e., all required information is present, format is correct, this is not a review of the technical parameters of the submission): If 802.18 finds the proposal is incomplete, 802.18 returns the proposal to the WG with a list of discrepancies and, where possible, suggestions for corrections. If 802.18 finds the proposal complete, 802.18 approves the proposal, forwarding the proposal to the EC for review/approval. After EC approval, the IEEE SA ITU-R liaison will submit the proposal to WP5D, with appropriate cover letter. Slide 4 John Notor, Cadence Design Systems, Inc. Page 4 John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 July 2008 Critical Milestones Last date for WG’s to submit technology proposals (final WG approved drafts) to 802.18 for review: June 12, 2009. Last date for 802.18 approval of proposals for submission to the EC: July 16, 2009. Last date for EC approval of technology proposals: July 17, 2009. Last date WP5D will accept technology proposals: October 2009 (exact date is TBD). Slide 5 John Notor, Cadence Design Systems, Inc. Page 5 John Doe, Some Company