e- Cloud Studies-Tune Studies with 45 Bunch Trains

Slides:



Advertisements
Similar presentations
Bunch-by-Bunch Instrumentation Module Design Goals: –Unified conceptual design for all bunch-by-bunch instrumentation Beam position monitoring Bunch tune.
Advertisements

Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
Electron cloud tune shift measurements for long trains Tune Shift versus current: Measured the tune shift for 45 and 115 bunch positron trains with 14ns.
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
E+ Tune Measurements for 4-ns Spaced Bunches Tune Measurements of 4-ns spaced bunches: An update of the strides made using the digital BPM system to measure.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Searching for CesrTA guide field nonlinearities in beam position spectra Laurel Hales Mike Billing Mark Palmer.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York ECLOUD Simulations for the Tune Shift Measurements of December.
ECLOUD Calculations of Coherent Tune Shifts for the April 2007 Measurements - Study of SEY Model Effects - Jim Crittenden Cornell Laboratory for Accelerator-Based.
Turn by turn horizontal and vertical positions at consecutive horizontally focusing quads 8W and 10W. Horizontal motion excited by horizontal shaker.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Recent Studies with ECLOUD Jim Crittenden Cornell Laboratory for.
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York ECLOUD Simulations for the Tune Shift Measurements of December.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
Feedback for CESR TA Michael Billing May 17, 2007.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
Frequency map analysis workshop - Orsay 1 - 2/04/04Mahdia Belgroune 1 Recent Experimental frequency maps at SLS and BESSY M. Belgroune PhD position (10/ /2004)
E- Cloud Machine Studies-Systematic Study of Single Bunch Tunes I. Pinger timing effect on single bunch tunes II. Vertical/horizontal pinger high voltage.
Recent electron cloud studies at CESR David Rice Cornell University Laboratory for Elementary-Particle Physics.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Simulation of Beam Instabilities in SPring-8 T. Nakamura JASRI / SPring-8
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
BPM and BSM Tune Measurements August 2, 2007 B. Cerio, R. Holtzapple.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
New Studies on Electron Clouds and Specific Luminosity
Weiming Guo Accelerator Physics Group / ASD Advanced Photon Source
Electron Cloud R&D at Cornell ILCDR08--7/8/08
e- Cloud Machine Studies-Tune Shift Studies
Horizontal e+ instability Study & Solution
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Electron Cloud Meeting
Recent Electron Cloud Studies at CESR and Future Plans
CLICK HERE TO BEGIN THE GAME!!
e-/e+ Vertical beam size with 6 Wigglers Low and Off
E-cloud instability at CESR TA
The Effect of Poisson Data Weighting on Streak Camera Diagnostics
e+/e- Vertical Beam Dynamics during CHESS Operation-Part II
ILC DR workshop at Cornell
e+ Vertical Beam Size during CESR-c Collisions
e+/e- Vertical Beam Size during CESR-c Collisions
Electron cloud studies at CESR
Study of Fast Ions in CESR
e-/e+ Vertical Beam Dynamics with 6 and 12Wigglers On
e- tunes-witness bunch 42
e+ Vertical Beam Size during CESR-c Collisions
G. Codner, E. Tanke, M. Palmer Cornell University
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Beam Size Flip-Flop Measurements
e+/e- Vertical Beam Size during CESR-c Collisions
Preliminary Analysis of April 24, 2006 CESR Bunch Measurements
e+ tunes-witness bunch 42
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Presentation transcript:

e- Cloud Studies-Tune Studies with 45 Bunch Trains Filled CESR-TA with a low energy 45 bunch train (14ns bunch spacing) at three different bunch currents. Measured the single bunch horizontal and vertical tunes as well as the vertical beam size at each current. These results are from measurements made by G. Dugan, M. Palmer, and R. Holtzapple on 11/09/2008.

PMT single bunch vertical beam size for the 45 bunch train at three different bunch currents. Resolution correction of 170mm included in results.

File 3039 I=0.75mA/bunch Turn-by-turn results for 5k turns Mean position (movie-double click to start) Beam Size (movie) FFT mean position Stable bunch (bunch4-movie) Unstable bunch (bunch 27-movie)

File 3041 I=1mA/bunch Turn-by-turn results for 5k turns Mean position (movie) Beam Size (movie) FFT mean position

File 3043 I=1.25mA/bunch Turn-by-turn results for 5k turns Mean position (movie) Beam Size (movie) FFT mean position

Vertical tune for the 45 bunch train at various bunch current Vertical tune for the 45 bunch train at various bunch current. Shown here is the mean vertical tune shift for the 45 bunch train.

Movie (click to start) of the vertical spectrum of each bunch in the 45 bunch train with I=0.75mA/bunch. A vertical tune shift along the train is evident until ~bunch 32. Movie (click to start) of the vertical position of each bunch at the beam position monitor for the 45 bunch train with I=0.75mA/bunch. The strong vertical kick from the pinger decays in ~1ms (strong vertical damping). The damping time increases along the train. Vertical spectrum for all 45 bunches-signal grows along the train

Movie (click to start) of the vertical spectrum of each bunch in the 45 bunch train with I=1mA/bunch. A vertical tune shift along the train is evident until ~bunch 32. The spectrum width has increased from the 0.75mA/bunch case. Movie (click to start) of the vertical position of each bunch at the beam position monitor for the 45 bunch train with I=1mA/bunch. A hint of a vertical instability occurs for several bunches (~ bunch 20) in the 45 bunch train. Vertical spectrum for all 45 bunches-signal reaches a peak rather quickly

Movie (click to start) of the vertical spectrum of each bunch in the 45 bunch train with I=1.25mA/bunch. A vertical tune shift along the train is evident until ~bunch 32. The single bunch spectrum width is quite large for several bunches along the train (especially bunch 1). Movie (click to start) of the vertical position at the beam position monitor for the 45 bunch train with I=1.25mA/bunch. A hint of a vertical instability occurs for several bunches (~ bunch 20) in the 45 bunch train. Vertical spectrum for all 45 bunches

Horizontal tune for the 45 bunch train at various bunch current Horizontal tune for the 45 bunch train at various bunch current. Shown here is the mean horizontal tune shift for the 45 bunch train.

Movie (click to start) of the horizontal spectrum of each bunch in the 45 bunch train with I=0.75mA/bunch. A horizontal tune shift along the train is evident BUT the tune signal is weak and noisy for many of the bunches. Movie (click to start) of the horizontal position of each bunch at the beam position monitor for the 45 bunch train with I=0.75mA/bunch. The horizontal kick from the pinger is almost non-existent which is why the horizontal spectrum signal is weak and noisy. Not a reliable tune measurement. Horizontal spectrum for all 45 bunches

Movie (click to start) of the horizontal spectrum of each bunch of the 45 bunch train with I=1mA/bunch. Again, the tune signal is weak and noisy for many of the bunches. Movie (click to start) of the horizontal position of each bunch at the beam position monitor for the 45 bunch train with I=1mA/bunch. The horizontal kick from the pinger is almost non-existent. Horizontal spectrum for all 45 bunches

Movie (click to start) of the horizontal spectrum of each bunch of the 45 bunch train with I=1.25mA/bunch. Again, the tune signal is weak and noisy for many of the bunches. Movie (click to start) of the horizontal position of each bunch at the beam position monitor for the 45 bunch train with I=1.25mA/bunch. The horizontal kick from the pinger is almost non-existent. These measurements need to be repeated with the horizontal pinger working properly. Horizontal spectrum for all 45 bunches

Comparison between PMT and BPM vertical tunes