MOD Deemed applications – User pays initial thoughts.

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Mod Clarifications Transmission Workstream 6 August 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Transmission Workstream 6 January 2011
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
Exit Capacity User Commitment – Transmission Workstream update
Performance Indicators
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Discussion on Mod262 and next steps
Assignment of NTS Entry Capacity – Background and UNC Obligations
User Compensation for NEC Storage Curtailment – Draft Proposal
7th July 2011 Transmission Workgroup - Elexon
MOD Flow Swap Scenario’s – Initial Thoughts
Transmission Workgroup June 7th 2012
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
UNC Modification Proposal 0201 National Grid Distribution
QSEC auction timetable
DN Interruption & Charging
Flow Swap Scenarios – Agreed Logic
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Long Term Non Firm Capacity Update
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream – Partial Assignment
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Entry Overrun Calculation
Review Group 0334 User Pays update – Modifications 288, 289, 290.
Information Provision for Transitional Exit Capacity
Transmission Workstream 1st February 2007
Commercial Arrangements For Gas Quality Service – Introduction
Invoicing Proposals 20th May 2013
Assignment of NTS Entry Capacity – Work currently being Undertaken
Assignment of NTS Entry Capacity – Previous Work Undertaken
Exit Overruns in the Enduring Regime
Transmission Workstream, 1 Mar 07
Transmission Workstream 4th December 2008
Transmission Workstream 05 November 2009
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
MOD Flow Swap Scenario’s – Initial Thoughts
Presentation transcript:

MOD 0351 - Deemed applications – User pays initial thoughts. Transmission Workstream 6 January 2011 Transmission Work stream 2 December 2010

MOD 0351 - Background Discussed at July/August 2010 workstream General support Potentially benefits all NTS Exit (Flat) Capacity holders by amending the rules for deemed applications Where NTS Exit (Flat) Capacity holders have multiple deemed applications at an NTS Exit Point Some benefit for National Grid NTS Clearer investment signals

User pays MOD 0351 is a User pays proposal Changes to xoserve systems Costs around £40 to 80k if included in Exit Phase 3 IS release MOD is unique (to date) for a non-zero cost User pays proposal in that: All NTS Exit (Flat) Capacity holders potentially benefit i.e. potentially benefits DNO and Shipper Users equally Current User pays arrangements require apportionment of costs to Shipper Users and Transporters separately

National Grid NTS view Need to demonstrate appropriate apportionment of costs to all parties benefiting from the proposal Proposed apportionment is one based on each User’s (Shipper and DNO) NTS Exit Capacity holdings as at 1st October 2012 Transporter apportionment of costs based on: 10% of total costs apportioned to National Grid NTS Remaining 90% pro-rated between Shipper and DNO Users Based on ratio of aggregate DNO Users NTS Exit (Flat) Capacity holdings to aggregate Shipper Users NTS Exit (Flat) Capacity holdings Resulting DNO User proportion is added to the 10% NTS allocation to form the total “Transporter” User Pays allocation of costs Example follows...

User pays apportionment example Based on Users current NTS Exit (Flat) Capacity holdings (1st October 2012)