©2004 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.

Slides:



Advertisements
Similar presentations
© 2008 Oracle Corporation – Proprietary and Confidential.
Advertisements

PROCESS SELECTION Chapter 4.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Metropolitan Transportation Authority July 2008 Financial Plan MTA 2009 Preliminary Budget July Financial Plan 2009 – 2012 DJC.
European Union Cohesion Policy
Public B2B Exchanges and Support Services
0 - 0.
Addition Facts
1 Software Engineering II The Business Aspects of Software Engineering.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Supply Chain and Logistics Management 17.
BUSINESS PLAN Guide Questions 1. What is the nature of the project? 2. What are the entrepreneur's competencies and qualifications? 3. What are the project's.
Sven Eppert and Thomas Kapfhamer 26 May 2003 Warsaw School of Economics International Logistics Prof Krzysztof Rutkowski CPFR - the new edge in logistics.
© Rolls-Royce plc 2009 The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Commercial Bank Operations
1 Contract Costing Every clause in a contract, regardless of whether it applies to economic or non- economic issues, can have cost implications. However,
Chapter 4 Supply Contracts.
Chapter Outline Hedging and Price Volatility Managing Financial Risk
1 Cost Estimating Comparative Study The UK MoD Perspective Defence Procurement Agency (DPA) U.K. Ministry of Defence (MoD) Pricing & Forecasting Group.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Understanding Pricing 13.
Chapter foundations of Chapter M A R K E T I N G Understanding Pricing 13.
By Anastasia Lidya Maukar
Evolution of Parametric Analysis within Rolls-Royce Purchasing
1 Pricing your Product or Service Florida Gulf Coast University Small Business Development Center Procurement Technical Assistance Center
2-1. McGraw-Hill/Irwin Copyright © 2006 The McGraw-Hill Companies, Inc. All rights reserved. 2 Money Management Skills.
Managing Supply Chains: Concepts, Tools, Applications Chapter 5: Coordination These powerpoints are a companion to the book: Managing Supply Chains:
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Global Entrepreneurship and Small Business Management
©2010 Rolls-Royce Corporation The information in this document is the property of Rolls-Royce Corporation and may not be copied or communicated to a third.
Communication campaign Most common issues identified: Personnel costs & Other direct costs Antonio Requena Fernández FCH JU Financial Officer.
Addition 1’s to 20.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Week 1.
Michael R. Solomon Greg W. Marshall Elnora W. Stuart
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Cost Accounting CA is a formal system of accounting for costs in the books of accounts by means of which costs of products and services are ascertained.
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
©2010 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
©2010 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Chapter 41 Chapter 10 Strategic Cost Management. 2 Definition Strategic Cost Management: Supply chain partners working together to identify design changes,
Understanding & Managing Finance
©2011 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
©2011 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
EMS adding value IEMA regional workshop 07/07/10 Matthew Payne
EM15 – Contractors COST MANAGEMENT
©2009 Association of Cost Engineers Ltd The information in this document is the property of The Association of Cost Engineers Ltd and may not be copied.
Professional Issues Slide 1 The Structure of Organisations & Finance Costs and Prices.
D S Rickerby Rolls-Royce plc Derby, UK
1 The George Washington University School of Engineering & Applied Science Department of Electrical & Computer Engineering Engineering Economic Analysis.
© 2010 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Copyright © 2011 Nelson Education Limited Finance for Non-Financial Managers, 6 th edition PowerPoint Slides to accompany Prepared by Pierre Bergeron,
Estimating Project Cost The total project cost includes both direct and indirect costs. Materials, supplies, and labor used in a project are called "direct.
University of Minnesota Internal/External Sales Rate Development – Advance Internal/External Sales.
5.2 Costs and Revenues Chapter 31. Management Decisions and Cost Business decisions cannot be made without cost information. Why?  Profit or loss cannot.
Communication campaign Most common issues identified: - Indirect Costs Thanos BATSILAS FCH JU Financial Officer.
Business Processes Slide 1 Introduction to Business Processes for Web Developers Rhys Parry.
Indirect Sourcing Communications Set for Nokia Internal Use
© 2012 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Accounting for Factory Overhead
© 2013 Rolls-Royce Corporation The information in this document is the property of Rolls-Royce Corporation and may not be copied or communicated to a third.
The Decision Maker. Managing a Profitable Company.
Trusted to deliver excellence © 2015 Rolls-Royce plc and/or its subsidiaries The information in this document is the property of Rolls-Royce plc and/or.
1. CurrencyUSD Period Prepared Date 2 Prepared by : Reviewed by ………………… ………………. …………………. ………………. …………………. Budget Summary Estimated Revenue Estimated Expenditure.
Sources of Information. Information A company needs information to make any decisions, whether these are long term or day to day. If a company decides.
Classification of costs Looks at the purpose and types of costs incurred by an organisation.
Trusted to deliver excellence © 2014 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated.
© 2009 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Purchasing Suppliers.
Key risks and challenges of VAT
Sourcing in a challenging market
Procurement Processes
Presentation transcript:

©2004 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc. This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or associated companies. Cost as a Business Driver Cost Estimating Comparative Study The Aerospace Angle Mick Rushe Rolls-Royce

Rolls-Royce plc 2 Background Part of Value Improvement Teams base in Derby,Bristol, Germany & USA Detailed estimating to give Should Costs Main software is CAPPe from T-Systems

Rolls-Royce plc 3 PURCHASING PLANS Parametrics Should Costing LTA Negotiation CVP Supplier Cost Modelling Supplier Development Price Agreement Commodity Strategy Development Price Negotiation Value Improvement Strategy Flow Continuous Improvement Cost Improvement Contract Review Board ECR CVP = Customer Value Process ECR = Engineering Cost Reduction Supplier Development not part of VI

Rolls-Royce plc 4 Customers Commodity buyers Operation buyers Risk and Revenue Sharing Partners Project Executive Advance Propulsion Systems Design Engineering Cost excellence Aero Repair and Overhaul

Rolls-Royce plc 5 Component Electrical harness for Gas Turbine Engine Customer Requirement Current cost model is excel based Developing model in CAPPe

Rolls-Royce plc 6

7

8

9 Process Three main elements to cost model Bought out finished (BOF) materials Time generation Charge out rates and margins using RateMarker

Rolls-Royce plc 10 BOF Materials These include:- Connectors Backshells Cable Boots etc Approx 70% of Harness cost Using Sub-tier quotes Next steps engage with sub-tier

Rolls-Royce plc 11 Time Generation Points considered:- Standards Visited all suppliers Design implications Supplier Quality Which established Method of Manufacture populated with times

Rolls-Royce plc 12 Charge out rates and margins using Ratemarker Cost of Money - Purchased Parts and Manufacturing Op Costs Purchase handling fee (burden) Profit Margin Cost Rate Per Hour

Rolls-Royce plc 13 Estimated Recurring Piece Price Price Modelling Map Purchased Parts, Consumables and Material Cost Process Costs Logistics Cost paid by Supplier Margin/Profit Manuf. Cost Batch Lead-Time cost-of-money Tooling Costs & other NRC * SEE FURTHER SLIDES FOR BREAK-DOWN External spend Purchase Burden (if not in Indirect Costs) Cost of Money (due to stock burn-off) Process Related Scrap impact on lost purchases. Work-Center Specific cost rates * Process Operation Times (Cycle Run Times and Set-Up) Operation Scrap cost Operation Finance Costs (cost of money)

Rolls-Royce plc 14 Work-Centre specific Cost Rate Cost Rate Map Direct Labour Cost Rate Indirect Cost Rate Indirect – Shop Labour Indirect – Office Labour Indirect – Buildings & Other costs Recovering Fixed & Variable costsRates applied to Set-Up or Run Operations Work Station (i.e.Equipment) cost rate

Rolls-Royce plc 15 Cost Rate Map - elements Basic Pay (per hour) – work-centre skill level specific. Fringe costs (Holiday, Sick Pay & Training costs - as lost time to business) Shift premium Allowances Co. National Insurance contributions (Gov. / State Taxes) Pension Contributions Operator Quantity – normal operation (Work-Centre specific, can be 1). Direct Labour Cost Rate

Rolls-Royce plc 16 Cost Rate Map - elements Indirect Cost Rate Office Indirect Resources (rest of business) - Non specific to area or Work-Centre (e.g. S.G&A) Shop Indirect & Tech Support resources Shop Indirect Labour Office Indirect Labour Buildings – Indirect Other Indirect Operating Business Budgets (not Labour) including: Admin.; Marketing; Travel; Training; Insurance; Telephone & postage; Non- specific Transportation; Consultancy; etc. Equipment Costs including: Office Equipment; I.T.; Shop Equipment Misc.; Stores Equipment (if not recovered via separate purchasing overhead).

Rolls-Royce plc 17 Cost Rate Map - elements Work Station (i.e.Equipment) cost rate Variable Cost Rate p.Hr Shop-Floor Cost Rate p.Hr Cost of Money – shown as a rate p.Hr. Capital Depreciation & Maintenance Costs p. Hr

Rolls-Royce plc 18

Rolls-Royce plc 19

Rolls-Royce plc 20 Should costing of sample harness to be presented at Seminar