Drawings taken from: L.Bartoszek and C. Daurer

Slides:



Advertisements
Similar presentations
Module design for B-layer replacement V.1. Bare Module dimensions mm Active area mm mm Footprint mm stack 200um chip 20um bumps.
Advertisements

Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Bias routing of short strip on large area detectors G. Casse, University of Liverpool.
Volume.
Volume.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Sensor and ladder and dimensions dateChangeVersionwho 3/26/2013Updated with U2 fid positions 1.1LG.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
January, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm =
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
PHOBOS Silicon Sensors Production W.T. Lin Dept. of Physics, National Central University Chung-Li, Taiwan Introduction Design and Production of Si-Sensors.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
February, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm.
More Practice / Review Return to table of contents.
Estimates of GEM chamber costs for the Solenoid spectrometer.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Silicon sensors for LumiCal Two possible options Wojciech Wierba Institute of Nuclear Physics PAN Cracow.
Maximum Areas in HPK Rule (ATLAS internal only) Y. Unno (KEK) 2015/1/13, 2015/4/8 updated, Y. Unno1.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
MAMUD Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, March 29, 2005 Purpose:  Provide pion – muon separation.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
October 19, 2007Heavy Ion Meeting1 RPC Upgrade for PHENIX Byungsik Hong Korea University.
Squared and Cubed Conversion Factors
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
EC: 7 DISK concept Preliminary considerations
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Surface area of a cylinder Imagine a cylinder opened out Rectangle Circle.
GEM Integrated PCB readout and cooling
Objective: Be able to work out the volume of a prism.
Status of BESIII and upgrade of BESIII
T980 STATUS AND CHANGES FOR
Available detectors in Liverpool
RPC with strip readout Last results from test of timing glass
Evidence for Strongly Interacting Opaque Plasma
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
RPC built a new plastic (peek doped with CB)
News on second coordinate readout
HPL DG d=1.4mm/e= mm.
The CBC microstrip readout chip for CMS at LHC Phase II
SIT AND FTD DESIGN FOR ILD
More Practice / Review Return to table of contents.
Objective - To identify how perimeter and area relate.
Use the substitution method to find all solutions of the system of equations {image} Choose the answer from the following: (10, 2) (2, 10) (5, - 2) ( -
Muon Detector Jiawen ZHANG 16 September 2002.
Lesson Quizzes Standard Lesson Quiz
Objective - To measure length in metric units.
Tolerances.
Page 6 Original Expression: Step 1: Step 2: Step 3:
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
2-D Representations of Solids
PHENIX forward trigger review
Area Of Composite Shapes
Volume.
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Circles
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Drawings taken from: L.Bartoszek and C. Daurer Update of the mechanical design and integration of RPC1-3 and redesign of the readout strips Drawings taken from: L.Bartoszek and C. Daurer 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update Exploed (IKEA) view 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update RPC2N 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update RPC2S 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 15 April 2019 R.Seidl, RPC design update

Sideview of all detectors 15 April 2019 R.Seidl, RPC design update

PART II: Strip redesign CMS FEE chips contain 32 channels Arrange strip counts accordingly Exact matching between RPC1, 2 and 3 RPC1ab:32,32,64,64 RPC23 :8(6) x 64 15 April 2019 R.Seidl, RPC design update

R.Seidl, RPC design update 60mm and 41 mm as inactive areas according to design, CMS chip size: 220 mm x 136 mm, with adapter ~ 220 mm x 176 mm 15 April 2019 R.Seidl, RPC design update

split gaps: ring 2 and 3 + ring 6.and 7 RPC dimensions all units in mm (except theta) RPC1a RPC1b RPC2 RPC3 theta (deg) Radius width radius possible 5280.2 5231.7 34.36 933.2 773.1 1016.8 842.3 4675.4 3873.2 ring 8 strips: 181.4 x 12.1 (64) strips: 197.7 x 13.2 (64) strips: 467.9 x 60.5 (64) 31.60 4207.5 3485.6 ring 7 strips: 441.0 x 60.5 (58) 28.84 751.8 622.8 819.1 678.6 3766.5 2120.3 4991.4 4135.0 ring 6 strips: 164.3 x 9.7 (64) strips: 177.7 x 10.6 (64) strips: 418.2 x 48.8 (64) strips: 554.2 x 64.6 (64) 26.09 3348.3 2773.9 4437.2 3675.9 ring 5 strips: 298.9 x 48.8 (57) strips: 528.6 x 64.6 (57) 23.33 588.7 487.7 641.4 531.4 2949.4 2443.4 3908.6 3238.0 ring 4 strips: 151.1 x 15.2 (32) strips: 163.5 x 16.6 (32) strips: 382.7 x 38.2 (64) strips: 507.1 x 50.6 (64) 20.57 22566.8 2126.4 3401.5 2817.9 ring 3 strips: 369.1 x 38.2 (56) strips: 493.3 x 50.6 (56) 17.81 438.7 363.4 477.9 395.9 2197.7 1820.6 2912.3 2412.7 ring2 strips: 141.0 x 11.4 (32) strips: 153.6 x 12.4 (32) strips: 357.8 x 28.4 (64) strips: 474.2 x 37.7 (64) 15.06 1839.8 1524.2 2438.1 2019.8 ring1 strips: 348.7 x 28.4 (54) strips: 462.1 x 37.7 (54) 12.30 297.6 246.6 324.3 268.6 1491.1 1235.3 1976.1 1637.0 1468.4 1926.4 split gap: ring 4 and 5 split gaps: ring 2 and 3 + ring 6.and 7 no split gaps strip length and width consider full acceptance in theta and phi in the octants (i.e. no loss due to readout and boxes) strip widths are determined at the outer radius of two paired rings

R.Seidl, RPC design update RPCs 2 and 3 15 April 2019 R.Seidl, RPC design update