Controlling time (seminar).

Slides:



Advertisements
Similar presentations
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
Advertisements

Critical Path and Gantt
Systems Analysis and Design 9th Edition
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Importance of Project Schedules
Project Time Management
Controlling cost ( lecture + seminar ). Why control cost? To satisfy financial auditors and support data for the government (obligatory). To satisfy the.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Resource analysis Project management (lecture + seminar)
WEEK 3 Project Planning.
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Forecasting Trend Analysis. Learning Outcomes You will be able to: Explain the value of trend analysis to a company Use moving averages to smooth the.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Project Management module
Project Management – PTM721S
Time Planning and Control Time-Scaled Network
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Procuring Professional Services
Examining the project (lecture).
Business Decision Making
Software Engineering Fall 2005
TOPIC-8A- PROJECT TIME CONTROL
Systems Analysis and Design
Problem solving.
Project Management 9. Performance Management
Activity Planning.
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Teaching slides Chapter 3.
Monitoring and Reporting Project Progress
Project Theory and Application
Problem solving.
In this tutorial you will:
Systems Analysis and Design Kendall and Kendall Fifth Edition
In this tutorial you will:
Controlling cost.
Time Planning and Control Time-Scaled Network
Software Project Management
Analysing the AoA network
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Combining Gantt charts and PNTs
Combining Gantt charts and PNTs
Analysing the AoA network
Project management (seminar)
Software Project Management 4th Edition
Examining the project.
Planning the project Project Management.
Project Planning By Phaik San Liew.
Chapter 6 Activity Planning.
Resource Planning, Cost Estimation and Budgeting
Controlling time.
Examining the project (seminar).
Fine-Tuning your plan and obtaining approval
LECTURE 3.
Teaching slides Chapter 13
Exercise – A small building.
Analysing the AoA network
Systems Analysis and Design Kendall and Kendall Fifth Edition
Importance of Project Schedules
Chapter 6 Activity Planning.
Systems Analysis and Design Kendall and Kendall Fifth Edition
Biological Science Applications in Agriculture
Chapter 3 Determining Feasibility and Managing Analysis and Design Activities 1.
CHAPTER 6 PROJECT TIME MANAGEMENT
Time Scheduling and Project management
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Scheduling.
Presentation transcript:

Controlling time (seminar)

Why to control? Monitoring and analysis of project data should enable the project manager to address problems at an early stage and take advantages of opportunities; prevent problems rather than responding to them; communicate quickly and effectively: thus project members will work with the same and up-to-date information, and can quickly deal with problems.

6 essential features of control systems A plan must be made This plan must be published Once working, the activity being controlled must be measured The measurements must then be compared with the plan Any deviations must be reported to the appropriate person A forecast of the results of any deviations must then be made, and corrective actions taken or a new plan must be made Bar chart PNTs

Measurement of activities The measurement should be appropriately precise The measurement should be pertinent The speed of collection of the information must be rapid compared with the timecycle of the system as a whole Measurements need to be accurate or of consistent inaccuracy The number of data processing points should be kept as small as possible

The measurement should be appropriately precise Precision is positively correlated with measurement costs PNT indicates the necessity of precision Critical activities Non-critical activities

The measurement should be pertinent What use the collected data can be made

The speed of data collection… Measurement must be taken frequently enough to allow useful action to be taken. The longer the time for corrective actions to be taken, the lower frequency of measurement is acceptible. Thus: the speed of data collection will increase toward the project’s ending.

Measurements need to be accurate or of consistent inaccuracy Accuracy can be bought with increased cost. Inaccurate but consistent measuring technique can be acceptable. PNT: where is the low accuracy tolerable. Accuracy and precision is NOT the same: Accuracy = degree of closeness to the true value (validity) Precision = degree to which repeated measurements leads to the same results (reliability).

The number of data processing points should be kept as small as possible Too much processing points would lead to: delay in information use distortions in the information

3 useful methods (the simplest is the best) The bar (Gantt) chart or the network itself Re-analysis Negative float

Gantt chart as a time control method (best for smaller projects) 6. 5. 4. 3. 2. 1. time Activities today

Example Marketing research (survey) project. Estimation of activity durations: Creating the SOW (framework for the research). = 7 days Collecting secondary information: models = 15 days empirics = 15 days Planning the research = 6 days Formulating the questionnaire = 14 days Collecting data in 3 destinations form 100-100 people = 10 days each Entering data = 2 days per one subsample Analysing data = 6 days Writing up the research report = 7 days Presenting the results = 1 day

Example After 30 days: SOW is made in 7 days Secondary research on models was finished in 14 days Secondary research on empirics was finished in 18 days Half of the research plan is written No other activities is started

Re-analysis with PNT (or Gantt chart) In large and/or complex projects. Taking the original network and inserting into the actual times instead of the expected durations. Sometimes new „delay activites” need to be built in. OR Re-drawing the network leaving out all those activities that are complete and re-analyse the others.

Example 2 (for networks) Manufacturing project: The firm have to purchase two types of raw materials (A & B; procurement is centralised thus it is a single activity), and produce two different product parts from these (P1 and P2). These can be done separately. P2 has to put through an obligatory test, P1 do not. After both P1 and P2 are ready, the firm will assemble them with an externally bought P3 part to the final product. Project done. Create the WBS and identify tasks.

Example 2 The duration times for the activities (with activity labels): (a) Raw materials procurement: 7 days (b) P1 production: 5 days (c) P2 production: 2 days (d) P2 test: 2 days (e) P3 procurement: 4 days (f) Assembly: 2 days Network? TPT? a 7 b 5 c 2 d f e 4 a-b-f = 14 a-c-d-f = 13 a-e-f = 13 = TPT

Example 2: problems arise After the project started, it became obvious that the testing facility will not be able to start the testing process in time, only two days later. The P3 procurement is expected to be 1 day longer, too. Re-analyse the project with the network. Identify the new TPT. b 5 a 7 c 2 delay 2 d 2 f 2 e 5 a-b-f = 14 a-c-(delay)-d-f = 15 a-e-f = 14 = TPT

Negative float If the network is too large and complex. Fix the end date, insert the actual durations and re-analyse the network (backward analysis). Late activities will appear with negative float. There must be corrective actions taken.

Example 2: calculate floats and negative floats 7 b 5 c 2 d f e 4 1 a 7 b 5 c 2 d f e delay -1 This will be discussed in a more sophisticated way on the following classes, after we learn more about the network diagrams.

Reporting rules Avoid recrimination (‘past is dead’). Take steps to avoid a recurrence of failure not to create a fuss. Progress should be reported in the form: not complete How much time is required to complete the activity? complete PNT helps to identify problematic areas and distinguishes areas of authority but not remove any responsibility.

Forecasting with PNT It enables predictions of resultant actions to be deduced from present or past actions.

Forecasting example with PNT Planned total project time (PTPT) of 1000 days. After 400 days (ATWP) the planned time for the work performed (PTWP) is 350 days. What is the estimated time to complete (ETC) the project? What is the estimated time slip for the whole project? Calculate the schedule performance index (SPI).

Solution Planned time to complete (PTC): PTPT – PTWP = 1000 - 350 = 650 days From the past activities we can calculate how these days have to be recalculated if the performance is not changing: ATWP/PTWP = 400/350=8/7 Current estimated time to complete (ETC): 650*(8/7)=743 Current estimated TPT: 400+743=1143 Total current estimated time slip: 1000-1143=-143 Current schedule performance index (SPI): PTWP/ATWP=350/400=0.875=87.5%

Plotting the limits of performance level

Problem solving There is a project with a planned Total Project Time (TPT) of 120 days. The project consist of three non-overlapping work packages with a duration of 40-40 days each. After 20 days only 37.5% of the first work package is completed. Calculate the following: current schedule performance index (SPI) total current estimated time slip planned time to complete current estimated time to complete (ETC) current estimated Total Project Time (TPT)

Reading Textbook chapter 9

Thank you for listening