Interruptible to Firm – NTS Supply Point Transition

Slides:



Advertisements
Similar presentations
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Advertisements

Implementation of Non Effective Days Nexus Workgroup – March
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Transmission Workstream February 2009
Proposer: Matthew Hatch Panel Date: 20/10/16
MIPI Changes October 2012.
Manifest Errors for Entry Capacity Overruns Workgroup 364
Transmission Workgroup 7th July 2011
Transmission Workstream, 01 October 2009
Review of UNC Section Q “Emergencies”
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
PN UNC Workgroup Invoicing 4th October 2011.
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Proposer: National Grid NTS Panel Date: 17th April 2014
Review of System Alerts
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Confirmation Notice Period for Certain ‘Unique’ Sites
Amendment to NEA & NExA Measurement Provisions Change Process
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
7th July 2011 Transmission Workgroup - Elexon
Publication of Zonal Flex Data
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Modification 0333A – implementation info
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
UNC Modification Proposal 0362
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
DN Interruption & Charging
Flow Swap Scenarios – Agreed Logic
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Transmission Workstream – Partial Assignment
Transmission Workstream 1st September 2005
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
Richard Fairholme Transmission Workstream 4th September 2008
Mark Freeman 29th January 2007
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Information Provision for Transitional Exit Capacity
DN Interruption Phase II
Stefan Leedham Transmission Workstream 2nd November 2006
Topic Register October 2009
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Proposer: Tracey Saunders, Northern Gas Networks
Presentation transcript:

Interruptible to Firm – NTS Supply Point Transition Transmission Workgroup 7th July 2011

Background UNC modification 195 AV introduced exit reform. From 1 October 2012 all NTS Exit Points will be “Firm”. All existing Interruptible NTS Exit Points will need to be withdrawn or the status changed to Firm. Applies to Supply Points, CSEPs, Interconnectors, Storage. CSEPs (inc. Interconnectors & Storage) to be considered separately. All current Interruptible logical meters require end dating in Gemini and, where necessary, new Firm logical meters created.

To facilitate this…. National Grid will be raising a UNC modification proposal to: create an obligation on Users, before 1st September 2012, to reconfirm their Interruptible Supply Points with firm status, except where a User….. has both Firm and Interruptible logical meters, or no longer wants to be registered at a Supply Point, then a withdrawal from the Interruptible Supply Point will suffice. changes to be effective 1st October 2012. current Supply Point Administration processes to be used; so costs likely to be limited to minimal administration costs. permit National Grid NTS, where the above steps are not carried out by the User, to complete these steps on behalf of the User.

Approach Proposal to be raised at July mods panel with recommendation for: Development at Workgroup. Self governance. Proposal will: where practicable, be consistent with proposal 367 (Interruptible to Firm – [DN] Supply Point Transition). Not be User Pays.