Parallel resources 13.04.2019.

Slides:



Advertisements
Similar presentations
Scheduling Chapter 19.
Advertisements

22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
13 APS. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any.
16 Cost sheet. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Operational Research & ManagementOperations Scheduling Flow Shop Scheduling 1.Flexible Flow Shop 2.Flexible Assembly Systems (unpaced) 3.Paced Assembly.
Content Topic 4 Business Operations Production planning and Control.
WEB Apps Product Info. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
Chapter 4 Process Design.
Parallel resources. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
Templates. © beas2009 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way.
Event control. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Kaba B-Net terminal Functionality. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
19 Data import. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Inventory. © beas2009/Page 2 This documentation and training is provided to you by beas gmbh. The documents are neither approved nor in any way acknowledged.
Resource groups. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Activity Scheduling and Control
17 Personnel Time Recording A Tutorial for Advisers/Key Users.
Variants with be.as script. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither.
09 Calculation. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
08 MRP. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any.
 Tata consultancy services Production Planning WORK CENTERS.
PRODUCTION PLANNING AND CONTROL (PPC). PLANNING CONTROL CONTROL PRODUCTION.
Production Planning and control – ME 1009 Unit 1 Introduction.
Tutorial 2: Homework 1 and Project 1
TimeClock Plus Part Time Employees.
HR Operations-2.
Installation of virtual box
04 Master Data – Resources
MRP: Material Resource Planning
Time Entry.
The Front Office Management Simulation (FOMS)
16 Cost sheet
Microsoft dynamics ax production online training
22-INTEGRATION HUB
12a Product configurator Example and data flow
Factory calendar
17 Personnel Time Recording
Job Breakdown Example.
Maintenance module Martin Heigl CTO
Introduction to Materials Management
Texas Instruments Supplier Portal- Web Invoice Overview
Customization
13 APS
06 Master Data – Item
12 Product Configurator
09 Calculation
Agenda: Payroll Basics
07 Master Data – Tools
Event control
Variants with be.as script
Material Requirements Planning (MRP)
Campus for Counselors Jeanie Ponder Technology Trainer
Processor Fundamentals
Resource groups
be.as scheduling methods
TimeClock Plus v7 Manager Training.
How to Upload Exchange Hour Certificates in Eduphoria
14 Bin location management
Scrap factors
Incorporating lot sizing into MRP
20 Batch transfer
CONVERCENT INCIDENT REPORTING Employee Training
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
Manufacturing Planning and Control
and Forecasting Resources
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

Parallel resources 13.04.2019

This documentation and training is provided to you by beas group AG This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way. The official current SAP Business One documentation and training for SAP Business One is available at http://service.sap.com/sbocustomer/documentation and http://service.sap.com/sbocustomer/training. 4/13/2019

Requirements for this Tutorial What you should successfully master The basics of SAP and be.as Good knowledge of general manufacturing processes Gute Kenntnisse in allgemeine Fertigungsprozesse Gute Grundkenntnisse in be.as 07.10.2009

Learning Targets After working through the lesson, you will be able to: Create and manage parallel resources 07.10.2009

Agenda Parallel resources 1: Introduction 2: Tool with same start/end date 3: Parallel resource with the same start/end date 4: Alternative parallel resources 4: Overlapping operations 07.10.2009

Parallel resourcea Introduction What are parallel resources? Resources, that must be used at the same time.

Parallel resource Types of parallel resource be.as offers the following types of parallel resources: Tools with the same start and end date. Parallel resources with the same start and end date, with any degree of utilization. Alternative parallel resources. Overlapping work sequences. 13.04.2019

Parallel resource Tools Tools are always available 24 hours, there is no shift calendar To restrain availability use the switch „blocked until“ in the tools master sheet Tools are only taken into consideration, if capacity planning is activated

Parallel resource Tools : setup Insert tools in the routing in tab „tool“. Now the routing can be scheduled only at times when the tools are available.

Parallel resource Tools : setup a parallel alternative tool Insert a parallel alternative tool by enabling the switch : defines cycle time“. The expected time is deposited in the tool and transferred to the work sequence when activated. In the structure view as well as in the APS view you can switch between tools. Automated optimization or tool selection is not possible.

Agenda Parallel resources 1: Introduction 2: Tool with same start/end date 3: Parallel resource with the same start/end date 4: Alternative parallel resources 4: Overlapping operations 07.10.2009

Parallel resources general Setup the parallel resource in routing: tab “parallel” With a parallel resources, a work sequence can be processed on multiple resources in parallel. Example: machine and employee or a several machines. Parallel resources as well as the operation itself can be logged on and logged off. All parallel resources always have the same start and end date. Therefore no separate job time or setup time is possible. The degree of utilization is adjustable, if you set to 50%, with a lead time of 1 hour, the resource will be loaded with 30 minutes.

Parallel resources capacity check If the degree of utilization is set to 100% and the resource limits are checked according to resource master sheet, then the operation can only be dispatched at the time, when both the main resource and the parallel resource are available. If you set a degree of utilization different from 100% or there are more than 1 employe/machine available for this resource, then only the daily capacity is checked. (Check to prevent utilization of more than 100%)

Parallel resources APS view In the APS parallele resources are displayed in the lower domain. To activate: tab „Resource“ - switch „resource“

Parallel resources different shift schedule If for the main and the parallel resource different shift schedules are existing, the schedule with the later start date is used. Example: Main resource (machine) 0:00 Operator (employee): 8:00 Time is reserved from: 8:00

Agenda Parallel resources 1: Introduction 2: Tool with same start/end date 3: Parallel resource with the same start/end date 4: Alternative parallel resources 4: Overlapping operations 07.10.2009

Parallel resources Alternative parallel resources Parallel resourcen can also have alternative resources. Example: To the machine „1202“ employee group „INJ_INT“ as well as „INJ_EXT“ can be assigned. To do so, enable the switch „alternative“ at all concerning resources.

Parallel resources Alternative parallel resources In the work order, you can select the parallel resource. Restrictions: you can have an unlimited number of parallel resources and ONE alternative-parallel resource

Parallel resources Alternative parallel resources: optimization be.as scheduling function allows to optimize parallel-alternative resources. Enable „optimization“ in the work sequence. Under consideration of existing time reservations, the parallel resource with the shortest lead time is used. For further information see training unit „resource optimization“

Agenda Parallel resources 1: Introduction 2: Tool with same start/end date 3: Parallel resource with the same start/end date 4: Alternative parallel resources 4: Overlapping operations 07.10.2009

Parallel resources Overlapping operations Usually the following operation starts when the previous one is finished. The overlap limit determines how long after the start of the first operation, the second one can be started in parallel. In the given example, the second operation starts one hour after the first ended.

Parallel resources Overlapping operations: APS view In the APS view overlapping is displayed: one hour in this example. Overlapping operations may have different lead time. The following operation can start at the earliest: start date + overlap limit of the previous operation. If there is no time available for the overlapping operation, the overlapping limit is ignored and the next empty time frame is used.

Parallel resources Overlapping operations: restrictions Calculation of overlapping operations works only with forward scheduling If the lead time (overlapping operation + overlap limit) is shorter than the lead time of the main operation, a correct computation is not possible. If capacity limits are taken into account and there are not enough resources available, the overlap limit is ignored.

Summary You can now: Create and manage parallel resources 07.10.2009

Thank you for your cooperation! 07.10.2009