Bus. Hwy. 13 and Hawthorne Blvd. roundabout project March 28, 2019

Slides:



Advertisements
Similar presentations
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Advertisements

Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
FNB Housing Affordability Review 2014 could be the year when residential affordability starts to deteriorate once more 3 April 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Triskett Road Rehabilitation Lorain Avenue to West 117 th Street March 18, 2014.
City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.
Remediation Demolition Landscaping Infrastructure Construction Main Traffic Route Remediated Staging Area Update 3.1 Archaeological Study Traffic Signal.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Waheed Uddin, PhD., P.E. Professor and Director, CAIT Center for Advanced Infrastructure Technology Department of Civil Engineering The University of Mississippi.
Mecca Roundabout Project Mecca, CA September 28, 2011.
City of Evansville and Vanderburgh County Intersection Crash Analysis.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
~~~~EVAS~~~~ EMERGENCY VEHICLE ALERT SYSTEM
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Odd Fellows Road Interchange and Roadway Improvements Citizen Information Meeting April 15, 2015.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
I-394 MnPASS Technical Evaluation Preliminary Findings March 23, 2006 Doug Sallman – Cambridge Systematics, Inc.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Downtown Project Scope Downtown Project Reality.
Avoiding accidents by limiting distractions and driving defensively.
Increasing Safety – Decreasing delays Marketing/Education Campaign.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
TITLE Tease text NORTH VANCOUVER AVENUE & COOK STREET Local Improvement District Resolution of Intent Hearing April 9, Agenda Item #324 Portland.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Madison Avenue Reconstruction Department of Planning and Development.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Lessons Learned from Intersection Improvements on U.S. Highway 280 PMI Central Alabama Chapter Darrell B. Skipper, P.E.
June 2016 Using Naturalistic Driving Data to Examine Teen Driver Behaviors Present in Motor Vehicle Crashes,
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Pedestrian Facility Improvement Program
Intersection Design Spring 2017.
All About the County Road 22 Roundabout
ROUNDABOUTING WHAT YOU NEED TO KNOW
Major Projects - An Accessible City (AAC)
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Arterial Loop+Racetrack No-Incident Model
I-280 Corridor Study and I-280/Winchester Blvd Project
Roundabouts in Massachusetts
Highway 110 Project Update
Intersection Crash Analysis in the State of Oregon
I-5/SR 18/SR 161 Interchange Interchange Improvements Hung Huynh
Florida Department of Transportation
Public Information Meeting NW 100th Street Reconstruction Project
Project Overview Roundabout proposed at US 41 and Gulfstream Ave
Malibu Canyon Pole Replacement Project Information
D Line TAC Meeting #1: D Line Rapid Bus Project Planning City of Richfield Transportation Commission July 12, 2017 Katie Roth, Project Manager.
Increasing Safety – Decreasing delays Marketing/Education Campaign
Irvine Traffic Research & Control Center (ITRAC)
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
SIMULATION RESULTS.
Pine cove pit time lapse drone photos
ROUNDABOUTS Improving Safety and Efficiency
Transit Signal Priority: The Importance of AVL Data
Grade one First term Second term Learning unit Learning unit
26th CARSP Conference, Halifax, June 5-8, 2016
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
M14A/D Select Bus Service
St. Andrews Agenda Item 11.A & 11.B
Bus Network Analysis for Potential Transit Priority
Metropolitan District | mndot.gov
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Calendar Overview – Phase II – REVISED April 2019
2015 January February March April May June July August September
Module 6 A 21st Century Transportation Network
Presentation transcript:

Bus. Hwy. 13 and Hawthorne Blvd. roundabout project March 28, 2019

Area Map Project Hawthorne Blvd.

Bus. Hwy 13 / Hawthorne Blvd. Project Location Bus. Hwy 13 / Hawthorne Blvd. Hawthorne Blvd.

Estimated Future Traffic Volumes Why Improvements? 13 (28) 9 (33) 17 (62) 7 (40) 4 (19) 6 (3) 364 (284) 60 (10) 23 (32) 4 (32) 130 (359) 14 (45) A recently completed traffic study found that existing delays on westbound Hawthorne are high during peak periods. Development / redevelopment in the area will soon make those delays much worse. The City thought it would be prudent to proactively make improvements before operations and safety become a significant problem. Hawthorne Blvd. Estimated Future Traffic Volumes 53 (140) 9 (33) 97 (156) 7 (40) 4 (19) 6 (3) 428 (314) 60 (10) 63 (94) 4 (32) 179 (412) 60 (211) Hawthorne Blvd.

Signal vs. Roundabout Roundabouts offer better operations since drivers only yield and are not required to stop. Signals require drivers to stop all the time, which increases delays and emissions. Roundabouts have been shown to reduce severe/fatal crashes dramatically compared to signals – drivers are forced to slow down through the intersection and less fixed objects to run into. Roundabout is primarily a one time investment, traffic signals have ongoing operating costs

Construction Overview Start Construction April 2019 1st Traffic Shift April 2019 2nd Traffic Shift June 2019 3rd Traffic Shift July 2019 Anticipated Completion August 2019 (New Roundabout Opens!!) Major Construction Phases Four (4) Closures/Detours Hawthorne Blvd.……........................................................................................…DETOUR via Cooper NW 21 Rd. at Hawthorne Blvd……….........................….DETOUR via Temp. Access off Bus. Hwy 13 Large Truck Detour in final phase of construction………………………….......DETOUR via Cooper Bus. Hwy 13 Remains Open to passenger traffic throughout construction

Construction Phases 1 and 2

Construction Phases 3 and 4

Detours