1 Summary Slides on FNST Top-level Technical Issues and on FNSF objectives, requirements and R&D Presented at FNST Meeting, UCLA August 18-20, 2009 Mohamed.
Advertisements

Tritium Supply Considerations Scott Willms Los Alamos National Laboratory ITER Test Blanket Module Meeting UCLA February 23-25, 2004.
PPPL ST-FNSF Engineering Design Details Tom Brown TOFE Conference November 10, 2014.
B.Q. DENG, J.H. HUANG, K.M. FENG, C.H. PAN Southwestern Institute of Physics, P.O.Box 432, Chengdu, , P.R. China contact of main author:
Implications of tritium burn fraction on fuel cycle Dai-Kai Sze, UCSD FNST Meeting August 18-20, 2009 UCLA, LA, Ca.
SABR REACTOR CORE & TRITIUM BREEDING BLKT W. M. Stacey Georgia Tech September, 2009.
Need for Fusion Nuclear Science and Technology Program Mohamed Abdou Distinguished Professor of Engineering and Applied Science (UCLA) Director, Center.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
FNST Issue 1 Tritium Self Sufficiency -Technical Issues and Conditions for Attaining tritium self sufficiency in a practical DT fusion system -Requirements.
Briefing to DOE Office of Science on Fusion Chamber Technology Washington, D.C., June 3, 2003 Prepared on behalf of the US Fusion Chamber Technology Community.
FNST / PFC / Materials / FNSF Meeting (s) August 2-6, 2010 at UCLA Welcome All Participants to UCLA If there is anything we can do to make the meeting.
US TBM Activities and Collaboration Discussion Mohamed Abdou FNST Meeting held at UCLA, August 18-20, 2009.
FNSF Blanket Testing Mission and Strategy Summary of previous workshops 1 Conclusions Derived Primarily from Previous FNST Workshop, August 12-14, 2008.
Status of Fusion Nuclear Data Development Mohamed Sawan Tim Bohm U. Wisconsin-Madison Fusion Neutronics Team.
Prior FNST Studies and Perspective on FNST Pathway Mohamed Abdou With major input from many experts and colleagues over many years FNST/PFC/Materials/FNSF.
Licensing ITER Reference Marbach et al. Fusion Science and Technology 44 (2003) p. 251 Rodriguez-Rodrigo et al. Fusion Engineering and Design.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
The Tokamak "тороидальная камера в магнитных катушках" Invented in the 1950s Leading candidate for fusion energy production Startup Plasma heating –Ohmic.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
ARIES Meeting April 22-23, 2002 U. Wisconsin, Madison Work performed under the auspices of the U. S. Department of Energy by University of California Lawrence.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
1 Radiation Environment at Final Optics of HAPL Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI HAPL GIMM Conference Call.
1 Lecture #24 Fusion ENGR 303I. 2 Outline Fusion →Definition →Atoms usually used Previous attempts at fusion Current attempts at fusion →International.
Inventory Management. Inventory Inventory or stock are the materials and goods required to allow for the production of supply of products to the customer.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
ITER Tritium Fuel Cycle Modeling
Briefings to the Materials Community on ITER Test Blanket Module (TBM) Mohamed Abdou August 11, 2003 Outline 1.What is going on with ITER and TBWG 2.Other.
The Fission-Fusion Hybrid At last! A solution that has found a problem Jeff Freidberg MIT.
Fusion Blanket Technology
Neutronics Parameters for Preferred Chamber Configuration with Magnetic Intervention Mohamed Sawan Ed Marriott, Carol Aplin UW Fusion Technology Inst.
An Expanded View of RAMI Issues 02 March 2009 RAMI Panel Members: Mohamed Abdou (UCLA), Tom Burgess (ORNL), Lee Cadwallader (INL), Wayne Reiersen (PPPL),
1 Mohamed Abdou With input from M. Sawan (UW), D. Sze (UCSD), N. Morley (UCLA), C. Wong (GA), S. Willms (LANL), A.Ying (UCLA), R. Nygren (SNL), P. Fogarty.
Managed by UT-Battelle for the Department of Energy Stan Milora, ORNL Director Virtual Laboratory for Technology 20 th ANS Topical Meeting on the Technology.
The energy of future. World’s reserves of fuel are going to be exhausted in about 50 years. It’s also predicted that the gas and the coal resources will.
1 1 by Dr. John Parmentola Senior Vice President Energy and Advanced Concepts Presented at the American Security Project Fusion Event June 5, 2012 The.
IFETritium Collection, and Purification System IFE Tritium Collection, and Purification System Abstract In support of The High Average Power Laser (HAPL)
Fusion Test Facilities Catalyzed D-D with T-removal John Sheffield ISSE - University of Tennessee ReNeW Meeting UCLA March 3, 2009 With thanks to Mohamed.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
1 Neutronics Parameters for the Reference HAPL Chamber Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
Base Breeding Blanket and Testing Strategy In FNF Conclusions Derived from Previous FNST Workshop, August 12-14, 2008.
Fusion Nuclear Technology Development and the Role of CTF toward DEMO
An ITER-TBM Experimental Thrust for ReNeW Themes III and IV Neil B. Morley, Mohamed Abdou, Alice Ying (UCLA); Mohamed Sawan, Jake Blanchard (UW); Clement.
Introductory Remarks to APEX/TBM* Meeting November 3-5, 2003 Mohamed Abdou *ITER Test Blanket Module.
Tritium Fuel Cycle System Modeling with ASPEN -ISS and FCU
Required Dimensions of HAPL Core System with Magnetic Intervention Mohamed Sawan Carol Aplin UW Fusion Technology Inst. Rene Raffray UCSD HAPL Project.
The mass of the nuclei produced is less than the mass of the original two nuclei The mass deficit is changed into energy We can calculate the energy released.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
1 FNST Issues, Development, and Role of Next Step Fusion Nuclear Facility FNF (VNS/CTF/FDF, etc.) and ITER TBM Presented at FNST Meeting, UCLA August 12-14,
1 Radiation Environment at Final Optics of HAPL Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI HAPL Meeting ORNL March.
US Participation in the
Reactor Kinetics and Neutron Sources
Pilot Plant Study Hutch Neilson Princeton Plasma Physics Laboratory ARIES Project Meeting 19 May 2010.
Reactor Kinetics and Neutron Sources
Debriefing/New Results of ReNeW Themes III/IV (HFP) Workshop
Can We achieve the TBR Needed in FNF?
Trade-Off Studies and Engineering Input to System Code
Chapter 20 Costs of Production.
Fusion Nuclear Technology Development and the Role of CTF toward DEMO
VLT Meeting, Washington DC, August 25, 2005
Martin Peng, ORNL FNST Meeting August 18-20, 2009
Presented at FNST Meeting, UCLA August 12-14, 2008
Introductory Remarks to APEX/TBM* Meeting November 3-5, 2003
Updated DCLL TBM Neutronics Analysis
«FC-FNS» simulation code
An ITER-TBM Experimental Thrust for ReNeW Themes III and IV
Can you fully describe the working of a nuclear reactor?
University of Wisconsin-Madison
TWG goals, approach and outputs
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

University of Wisconsin-Madison Updated Tritium Breeding Requirement in Fusion Nuclear Science Facility (FNSF) Mohamed Sawan University of Wisconsin-Madison Mohamed Abdou UCLA With input from Scott Willms-LANL FNST Meeting at UCLA August 18-20, 2009

Objective Determine the required TBR in the FNSF as a function of fusion power and available external tritium supply TBR determined for three options Required FNSF TBR to ensure it does not run out of tritium fuel during its lifetime Required FNSF TBR to ensure that 5 kg of tritium is available at end of ITER and FNSF operation for startup of DEMO Required FNSF TBR to ensure that 10 kg of tritium is available at end of ITER and FNSF operation for startup of DEMO Assume that ITER has priority over FNSF for using external tritium supply from CANDU reactors

Projected World-Wide CANDU Tritium (from Scott Willms, LANL)

Initial ITER Schedule Assumptions: 2016 ITER start with 2020 D-T 2 kg working inventory that builds up over 2 years beginning 2018 At end of 20 ITER operation half of working inventory lost to waste

External Tritium Supply Available for FNSF (from Scott Willms, LANL) Assumptions: 2016 ITER start with 2021 DT 2 kg working inventory that builds up over 2 years prior to DT At end of 20 ITER operation half of working inventory lost to waste

FNSF Assumptions 2021 FNSF start (same time as DT start in ITER) 1 year HH followed by 1 year DD operation 3 years DT operation at 10% availability followed by 10 years DT operation at 30% availability Fusion power in the range 50-400 MW considered A tritium inventory is maintained at all time during DT operation to cover hold-up in chamber components, tritium processing system, and needed reserve This working inventory is assumed to be 0.4 kg at 100 MW fusion power (scaling from ITER) Working inventory scales linearly with fusion power and builds up over the 2 years preceding DT operation At end of 15 year FNSF operation half of the working inventory is lost to waste with the rest added to supply available for DEMO Tritium burn rate is 55.6 kg/GWy Tritium decays at rate of 5.5% per year

Total External Tritium Supply Required by FNSF (to cover burn, inventory, decay) Has Strong Dependence on TBR and Pf

Tritium Inventory Available for DEMO at End of ITER and FNSF Operation Depends Strongly on TBR in FNSF

Required TBR in FNSF TBR required to ensure that FNSF does not run out of tritium supply during its operation increases as fusion power increases Incremental TBR required to provide a given additional tritium for DEMO is larger for lower fusion power FNSF

Current ITER Schedule Start of DT operation delayed by 5 years

Expected External Tritium Supply Available for FNSF with Current ITER Schedule With the current ITER start delay almost all tritium supply will be used by ITER and FNSF has to be self-sufficient in tritium in addition to providing initial startup inventory for DEMO TBR required in FNSF will be higher than with previous ITER schedule

Tritium Inventory Available for DEMO at End of ITER and FNSF Operation Reduced with Delayed ITER and FNSF

Required TBR in FNSF is Higher with Delayed ITER and FNSF

Conclusions With the limited external supply and taking into account the initial ITER operating schedule (2016 start), any next step FNSF should provide significant part of its tritium need With available external tritium supply, a small fusion power and a modest TBR are required for FNSF to have enough tritium for its operation Another part of FNSF mission is to provide the initial tritium inventory needed for startup of DEMO. This increases the required TBR in FNSF. Incremental TBR required to provide a startup tritium inventory for DEMO is larger for low fusion power FNSF and large initial startup inventory for DEMO (significantly greater than 5 kg) To achieve this mission, FNSF can have a TBR that increases with time with possible extension of its operation at a higher TBR With the current ITER start delay almost all tritium supply will be used by ITER and FNSF has to be self-sufficient in tritium in addition to providing initial startup inventory for DEMO