Secondary Spectrometer, Motion Control, Infrastructure

Slides:



Advertisements
Similar presentations
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Advertisements

NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Date Instrument Systems ORNL SEQUOIA Overview Garrett Granroth (Instrument Scientist) David Vandergriff (Lead Engineer) ARCS/SEQUOIA IDT meeting March.
Hardware Progress Doug Abernathy ARCS Instrument Scientist ARCS IDT Meeting Lujan Center, LANL September 30, 2002 SNS Instrument SystemsArgonne/Oak Ridge.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Mitglied der Helmholtz-Gemeinschaft ZEA-1 | Technology for Excellent Science SKADI - Report FZJ Meeting Lund Romuald Hanslik FZJ/ZEA-1 1.
R2D2 fast overview Sept version This document is a short description of the R2D2 test beam line at the JEEPII reactor at IFE, Norway. (Contact: Isabel.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
HYSPEC HYSPEC INSTRUMENT DESIGN – OUTLINE  The two “models” considered for HYSPEC – inside & outside (Mark)  A breakdown of the components of the two.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
SAXS/WAXS Conversion for Beamline Engineering Review.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
A New High Intensity Cold Neutron Spectrometer at NIST J. A. Rodriguez 1,3, P. Brand 3, C. Broholm 2,3, J.C. Cook 3, Z. Huang 3, P. Hundertmark 3, J. Lynn.
NMX Instrument Layout and End-station Giuseppe Aprigliano Lead Instrument Engineer NMX IKON 7 September 15 th, 2014.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Installation of the T600 at Fermilab CSN2, September 22,
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
ESS Vacuum Standardization
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
October, 2001 Hybrid Spectrometer for Single Crystal Studies at the Pulsed SNS: an update. n Principal features of the proposed hybrid spectrometer. n.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
Straw man layout for ATLAS ID for SLHC
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
St. George Infrastructure
Review on collimator movement with stepping motors
LumiCal mechanical design, integration with LDC and laser alignment
A very first look at siting issues
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Review on collimator movement with stepping motors
XFEL Collimation and Beam Switchyard Vacuum Issues
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
LHCb VErtex LOcator ENGINEERING DEPARTMENT
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
MIRACLES budget: Summary of the 3 configurations
Monte Carlo simulations for the ODIN shielding at ESS
Rad safety and activation
Primary Spectrometer & Sample Environment
BEER – General Update Nuclear Physics Institute CAS Přemysl Beran
Actions List.
Bunker Wall Design Wall ESS
Rack Placement Chopper Workshop
NSS integrated installation plan workshop Introduction
Motion Control on ESS Test Beam Line
Scope Setting Meeting MIRACLES
Four Jaw Collimator.
Test Beamline System Requirements and Charge to PDR Committee
Michail Anastasopoulos Lead Detector – Design Engineer
BEER cave design and shielding
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Secondary Spectrometer, Motion Control, Infrastructure MIRACLES SCOPE (2/2) Secondary Spectrometer, Motion Control, Infrastructure

Index Secondary Spectrometer Analyzer Radial Collimator Beryllium filter Secondary cave, vacuum tank and beam stop Detectors and beam monitors Motion Control Infrastructure

Analyzer Components Si-111 hexagonal crystal wafers: dimensions: 2mm thick, 12 cm diagonal. Single analyzer panel (aluminum): 15 º horizontal coverage, 22º vertical coverage. B4C coating backside of the Silicon wafers. Si-111 wafers B4C, neutron absorber Aluminum plate Analyzer layout Configurations 3: 150 º horizontal coverage and 44 º vertical coverage. 20 panels, 1890 wafer. Analyzer area = 12.60 m². 2: 120 º horizontal coverage and 44 º vertical coverage. 16 panels, 1512 wafer. Analyzer area = 10.08 m². 1: 30 º horizontal coverage and 44 º vertical coverange. 4 panels, 378 wafer. Analyzer area = 2.52 m².

Analyzer Components

Analyzer QUOTATION AND SOURCES OF INFORMATION Waffers: 200 $/waffer. Source: BASIS. 340 k€ configuration 3. 272 k€ configuration 2. 68 k€ configuration 1. B4C coating. 7.93 k€/m². Source: IN16B. 100 k€ configuration 3. 80 k€ configuration 2. 20 k€ configuration 1. Aluminum support structure 22.5 k€/panel. Source: IN16B. 450 k€ configuration 3. 360 k€ configuration 2. 90 k€ configuration 1.

Radial collimator Detailed design of our radial collimator not done yet. Preliminary concept: Foils: Mylar 0.036mm. Absorber: Gd2O3. Coated foil thickness:0.085mm/0.090mm. Foil Height: 600mm. Inside Radius: 348mm. Outside Radius: 780mm. Angular Spacing: 2°. Bottom Aluminium Support Plate: 40mm. Top Aluminium Support Plate: 40mm. Radial Beam Scan:160°. Quotation: 105k€. Reference: Source: JJ-Xray. Responsible of the radial collimator of ARCS (Spectrometer at the SNS).

Beryllium filter Detailed design of our Be filter not done yet. Our quotation is 450 k€: 300 Be blocks. 383 €/block: Be cost: 114.8K€. Housing and shielding of the filter: 155 k€. Electronics, cooling and installation: 182 k€. We can find an example of BSS using Be filter in OSIRIS (ISIS). During a conversation with the OSIRIS team, the suggested us a full economic cost of £400k, including overhead, electronics, installation…

Secondary cave, vacuum tank & shielding, beam stop Vaccum tank Estimation based on IN16B vacuum tank, made by Cadinox. Extrapolation with volume difference. Configurations 2 and 3 include vacuum tank with full covering (940 k€). Configuration 1 includes vacuum tank with half covering (600 k€).

Secondary cave, vacuum tank & shielding, beam stop Estimation based on IN16B, considering the area difference. HDPE + ¹⁰B rubber + structure. 660 k€ in configurations 3 and 2. 400 k€ in configuration 1. Secondary cave: Concrete volume: 10x10 m inner surface, 6 m height, 0.5 m thickness. This means an estimation of ca 186 m³ of concrete. Assuming 800 €/m³ this would mean ca 150 k€. In order to include labyrinth and door, we assume 200 k€. Beam stop: Design not ready yet. Assumed 150 k€, based on BIFROST estimation. The sum of these 3 items gives us 1.08 M€, whereas P. Benley suggested us 1.5 M€ for the secondary shielding. Necessary to clarify if something is missing.

Detectors and beam monitors Spectrometer detectors: ³He tubes. Source: Toshiba. 326.7 k€ in configuration 3 (150 tubes). 275.2 k€ in configuration 2 (120 tubes). 117.8 k€ in configuration 1 (30 tubes). Power supplies and cables. Source: CAEN quotation. 50.26 k€ in configuration 3. 40.4 k€ in configuration 2. 13.8 k€ in configuration 1. Difractometer detectors. 90 k€ for 30 ³He tubes. Source: Toshiba. 7.96 k€ for power supplies and cables. Source: CAEN quotation + cables. Detector electronics. Source: ESS. 160 k€ for back end electronics. Assumed a fixed cost for the 3 configurations. Front end electronics not considered in our budget. Necessary to discuss what is missing regarding detector electronics (the quotation for BASIS spectrometer detectors is 273.2k€).

Detectors and beam monitors PSD Beam monitors. 7 in configuration 3. Quotation: 30 k€ each. Source: ESS After the PWD chopper pair. After the PS chopper pair. After Chopper 5. After Chopper 6. After Chopper 7. Between the guide exit and the sample. After the sample.

Precision / Repeatability (mm/°) Synch' with signals / sensors Motion Control Preliminary elaboration of Table of Motion. 21 axis in configuration 3; 16 axis in configuration 2; 12 axis in configuration 1. Sent to Federico Rojas for quotation. Added 1k€/axis for motor and encoder (not MC budget). Modifications came after the scope setting report was uploaded. Axis Number Device Description WBS Element Custom / Off The Shelf Axis description Motion Type Actuator Type Range (mm/°) Accuracy (mm/°) Precision / Repeatability (mm/°) Encoder Type Synch' with other axis Synch' with signals / sensors Load (Kg) Force / Torque Speed Acceleration Brake Required Fixed or Removable 1 Slit 13.6.16.X.X.X-   Z1 Linear Electrical 50 0,1 Absolute 5 Low Fixed 2 Z2 3 Y1 4 Y2 Sample Positioner X1 Medium Removable 6 7 8 Rotary 90 9 10 360 11 Upper detector array 30 0,001 100 12 Lower detector array 13 Be filter 3000 14 Radial Collimator 300 15 Beam monitor 1 1000 16 Beam monitor 2 17 Beam monitor 3 18 Beam monitor 4 19 Beam monitor 5 20 Beam monitor 6 21 Beam monitor 7

Motion Control Configuration 3 = 138.573 k€ according to Feredico Rojas. Currently 209.158 k€. 17.4 k€ of Project Management and Integration. 41.7 k€ of Design. Currently 59.952 k€. 39.494 k€ of Procurement and Fabrication. Currently 90.409 k€. 5.995 k€ of Installation. Currently 6.263 k€. 33.984 k€ of Cold Commissioning. Currently 35.134 k€. Configuration 2 = 116.313 k€ according to Feredico Rojas. Currently 185.279 k€. 17.4 k€ of Project Management and Integration. 36.312 k€ of Design. Currently 53.95 k€. 29.373 k€ of Procurement and Fabrication. Currently 80.046 k€. 4.65 k€ of Installation. Currently 4.768 k€. 28.578 k€ of Cold Commissioning. Currently 29.115 k€. Configuration 1 = 103.193 k€ according to Feredico Rojas. Currently 125.696 k€. 17.4 k€ of Project Management and Integration. 31.357 k€ of Design. Currently 37.057 k€. 27.424 k€ of Procurement and Fabrication. Currently 44.244 k€. 3.413 k€ of Installation. Currently 3.396 k€. 23.599 k€ of Cold Commissioning.

Infrastructure Already estimated items: Cabling: 5 k€. Source: Gábor László. Personal Safety System Design: 120 k€. From BIFROST. Crane outside cave: 30 k€. From BIFROST. Crane in cave: 10 k€. From BIFROST. Media distribution: 80 k€. From BIFROST. False floor: 20 k€. From BIFROST. Helium recovery. 20 k€. From BIFROST. Control hutch. 150 k€. From BIFROST. Infrastructure installation. 172 k€. From BIFROST. Instrument cabin. 30 k€. From TREX. Items not estimated yet: Cooling installation. ESS-0063538: is provided by ESS and paid by the instrument. Fiber connection from the instrument to the galleries: ESS-0063538: is provided by ESS and paid by the instrument. Domestic and waste water: ESS-0063538: is provided by ESS and paid by the instrument.