Update on LIBSIP and TTCN-3.org

Slides:



Advertisements
Similar presentations
CTI UPDATE ON TTCN-3.ORG Silvia AlmagiaMTS#60 1 Oct 2013 © ETSI All rights reserved.
Advertisements

Perfect Service Software (PSS). This Software (PSS) takes care of the following activities like: Installation Details Warranty Details AMC Details Preventive.
Website Advertising Rates Appears in the “Sponsor’s Widget” in Left Column Appears on Home Page, & all Story Pages & Site Pages for maximum “impressions”.
Suzuki Kasami Example. Consider 5 Sites S1 S2 S4 S3 S5 n=1 n=2 n=5 n=4 n=
Adding and removing individual participants In this video, you will learn how to: edit site information display a site logo create a site home page Continue.
Blackboard 7 Student Tutorial Series How to Use the Task Feature.
Creating FrontPage Tasks The task view allows you to add information about what you want to accomplish when creating your Web site.
Request must be submitted a minimum of 5 working days prior to event. Do not promote event until confirmation is received. Any questions or assistance.
SCHOLARONE MANUSCRIPTS ORCID Outreach Meeting – 5/17/12 Chris Heid, Product Manager ScholarOne.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Web Site Steering Task Force Action Report Feb 2007.
1 Weekly Slippage Report Current (Start / Finish) vs. Last Week Comparison Microsoft Project Users Group  Introduction  Current (Start / Finish) vs.
Mobi Site Tutorial. Go To mobi.mytraceradmin.co.za.
Web-site Design Strategy.  Task 4  To achieve P6 learners need to produce a plan showing what actions they would take to launch a small website.  The.
Update Critical Elements - Employee 2. “Open your current Performance Plan by selecting ‘Update’ from the ‘Action’ drop down menu and select the ‘Go’ button.
ETSI TC ESI PRESENTATION TO CAB FORUM Iñigo Barreira /Arno FiedlerFebruary 2016 meeting, Scottsdale, AZ © ETSI All rights reserved.
HOW TO USE GOOGLE WEBMASTER TOOLS TO IMPROVE SEO ? GOOGLE WEBMASTEER.
MODULE 10 – PROJECT SERVER
PROJECT FLOW MANAGEMENT A guide for GBs, BBs and MBBs
CONFORMIQ DESIGNER 2012 MTS #55 Meeting.

Ariba Contracts: Amend a Contract Workspace
iShop Training Module Secured Browsing
ETSI related TTCN-3 activities and issues
TB/ISG <name> Management report to OCG#62 – 20/06/2017
MTS#59 - Input from CTI Silvia Almagia May 2013
ENGINEERING MANAGEMENT (GE 404)
Create TDL Promotion Team (TPT) – MTS#64
CheckINN Card Traveler Training
Automated Interoperability Testing
TTCN-3 Website Project Presented by ECT for MTS#57
New Client Guide.
TITLE - TITLE - TITLE Subtitle – Subtitle - Subtitle
Revision of EG CTI October 2013
dr György Réthy, Ericsson
CTI Update on LIBSIP and TTCN-3.org
ENGINEERING MANAGEMENT (GE 404)
Security SIG#5 in MTS 19th September 2012 Agenda
Batch Parties Changes.
ETSI TC MTS TDL SC meeting Reports
ServiceLink Training Video Managing Job Orders Pending Completion
You must log in using both you address and your Full name before proceeding
Release 3 Update November 2018.
PMI-SVC Scheduling Forum
TOP project – status update for mts#72
Marion Kelt, Research and Open Access Librarian
STF430 Final Report Summary
Hydro-Meteorological Equipment Industry MEMBER PRODUCT CATALOGUE
Update on LIBSIP and TTCN-3.org
UCAAT 2015, ready for the launch!
Marion Kelt, Research and Open Access Librarian
UCAAT 2015, ready for the launch!
UPDATE on SVN & MANTIS Upgrade
Expedite Project Updates Using a Custom Status View
UPDATE on PICS GUIDE (EG ) REVIEW
UPDATE on SVN & MANTIS Upgrade
Revision of EG CTI October 2013
UPDATE on SVN & MANTIS Upgrade
40TD11 STF276 – Status (including TPLan and T3Doc)
UPDATE on SVN & MANTIS Upgrade
UPDATE on how TDL-TO is used at ETSI
UPDATE on SVN & MANTIS Upgrade
UCAAT 2017 is hosted and organised by Fraunhofer FOKUS.
Discussion on TDL future
STF 491: TTCN-3 Evolution 2015 Final Report summary
Adding a Category (Categories are the second level of your organization’s offerings hierarchy: Program > Category > Class > Session) 1.) A Category can.
STF393 Final Report Summary TTCN-3 Language Maintenance
UPDATE on PICS GUIDE (EG ) REVIEW
TTCN-3 Editorial Team (TET) Status Summary
Parent Information Evening
Presentation transcript:

Update on LIBSIP and TTCN-3.org Dirk Tepelmann MTS#62, 14-15 May 2014 © ETSI 2014. All rights reserved

LibSip/LibIms v2.0 with reference table baseline at ttcn-3.org LIBSIP/LIBIMS/TTCN-3.org STF471 had two sessions Most of the tasks are completed almost all PIXITs are removed Reduced warnings to a minimum LibSip/LibIms v2.0 with reference table baseline at ttcn-3.org LipSip/LibIms v3.0.0 will be published at the end of STF471 Regularly synchronisation activities between STF160, STF471 and ttcn-3.org © ETSI 2012. All rights reserved

Maintenance phase entered TTCN-3 publication added to ETSI’s FB page TTCN-3.org Maintenance phase entered TTCN-3 publication added to ETSI’s FB page Action point adding references to OMA publications closed (waiting for major migration at OMA) Regularly tasks: Finishing the ongoing / pending APs Keeping the site up to date: Adding / removing news, projects, events... Promoting TTCN-3.org? The TET meet quarterly to track all that © ETSI 2014. All rights reserved

Thank you! Contact Details: tepelmann@testing.com © ETSI 2014. All rights reserved