Mod Proposal 0268 : AQ Backstop Date

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Implementation of Non Effective Days Nexus Workgroup – March
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Customer Charge On behalf of all DNs 25 October 2010.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Trades and Transfers Workshop, 6 th November 2007.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 Modification 0152V Implementation Matters 25 October 2007.
Customer Charge On behalf of all DNs 19 November 2010.
Rolling AQ – Initial Calculation
Distribution workstream 29th January 2009
UNC Modification Proposal 0202 National Grid Distribution
Transmission Workstream February 2009
Distribution Workgroup 24/11/16
Code Governance Review UNC Modification Proposals
Allocation of Unidentified Gas Statement - Update
NTS Entry Charging Review Update
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Project Nexus Workgroup
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
DSC Change Committee Summary – 11th July
Consideration of issues raised by UNC Modification Proposal 0244
Impacts of Project Nexus Implementation Date to AQ17
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Topic raised at July 2009 Distribution Workstream
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
AUG Query Responses 21st November 2013.
Modification proposal 330
Consideration of issues raised by UNC Modification Proposal 0244
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Proposer: Debbie Brace Panel Date: 20th March 2014
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Project Nexus Workgroup
MOD 640 INVOICING VALIDATION RULES
Information Provision for Transitional Exit Capacity
AQ Review System Calculation Overview
Development Work Group 0209 Straw Man Update
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Mod 209 – Rolling AQ.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
Further Considerations
Enabling Large Scale Utilisation of Class 3
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Mod Proposal 0268 : AQ Backstop Date Phil Lucas (22 October 2009, Solihull)

Background AQ is derived from historic consumption to represent a view of expected consumption in the next 12 months AQs revised on 1 October each year Historic consumption adjusted by a Weather Adjusted Annual Load profile (WAALP) to a Seasonal Normal value UNC defines which periods are able to be utilised to quantify historic consumption - the ‘Relevant Metered Period’ (UNC H3.2)

Relevant Metered Period Metered between two reads: Ending Meter Read (last valid reading prior to 10 August) Target Opening Date (42/50 weeks prior to ending Meter Read for Annual/Monthly Read) Earliest possible ‘starting Meter Read’ specified as last valid meter read prior to the Target Opening Date (up to 3 years preceding such Date), or If no valid reading in this 3 year period, the first valid reading after the Target Opening date, provided that the starting Meter Read is no earlier than 1 October 2002 (the ‘AQ backstop Date’)

Existing Backstop Date UNC Modification 0018 (2005) Impact At that point - period that could be used in AQ Calculation (1 October 2002 to March 2005) was 2 years 5 months Number of Meter Points that did not calculate as a result was 446 (11 SSP, 435 LSP) Representing 0.01% of 4.5 million total that did not calculate

Treatment of Un-calculated AQs For AQs that are not calculated (i.e. Carry Forward AQs) A multiplicative factor per EUC is applied to the current AQ value to adjust from the old SN basis to the new SN basis Defined in UNC H3.4.4 (AQ = (Current AQ x (A/B)) e.g. An AQ of 20,000 kWh in EUC Band 1 Adjusted by multiplying difference between the old aggregate WAALP (eg: 356) and the new aggregate WAALP (eg: 352) Result 0.9888 AQ to be effective from 01/10/10 on the new basis is 19,776 kWh

Issue As the ‘AQ Backstop Date’ is currently static, it becomes increasingly irrelevant Cyclic reading and associated must read provisions effectively move the earliest potential starting Meter Read date forwards Maximum gap between readings for Annual Read meter is 2 years Maximum gap between readings for Monthly Read meter is 4 months Revised WAALPs will apply for 2010 AQ Review as a consequence of the 2010 SN review Need to be applied to any retrospective consumption periods that could be utilised within the 2010 AQ Review. Under current terms this is notionally 1 October 2002 WAALPs will be recalculated using new SN basis back to 1st October 2006

Requirements Replacement of the existing ‘hard coded’ date with an enduring solution A backstop date which rolls forward upon the implementation of revised SN values (as required by H1.4.2) This would be 1 October in the 4th year prior to the start of the Gas Year in which a SN Review becomes effective, and the new ‘Backstop Date’ would become effective from 1st February of the preceding Gas Year (enables the provisional AQs to be calculated using the revised SN values) Examples For a SN Review which becomes effective from 1 October 2010, from 1 February 2010 the backstop date will be 1 October 2006 For a SN Review which becomes effective from 1 October 2015, from 1 February 2015 the backstop date will be 1 October 2011

Consequences of Implementation On a normal 5 yearly SN Review cycle, the backstop date would be at its shortest point (February prior to SN change effective year) 3 years 4 months at its longest point (January prior to SN change effective year) 8 years 4 months The impact of this option in regards to AQs not being calculated is anticipated to be small: Full detailed impact analysis available on presentation given to DESC in early October Seasonal Normal Review 2005: Backstop date change Shortest period that could be used (01/10/02 to March 2005) was 2 years 5 months Shortest period in this proposal (01/10/2006 to 01/02/2010) will be 3 years 4 months (additional year)

Effect of Implementation

Timetable 2nd October Topic raised & discussed at DESC 15th October UNC Mod raised at UNC Mod Panel – referred to Workstream 22nd October Discuss at Distribution Workstream 10th November Discuss at DESC 26th November Discuss at Distribution Workstream – finalise Workstream Report 17th December Modification Panel consider Workstream Report – issued for consultation Mid January Representations close out 21st January Modification Panel make recommendation – Final Modification Report issued to Ofgem 11th February (max) Ofgem determination & Implementation 12th February UK Link system update of backstop begins March UK Link system update complete