Electronics and DAQ Summary

Slides:



Advertisements
Similar presentations
Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Advertisements

The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Performance Study of BESIII Trigger System Z.-A. Liu, D. Zhao, D. Jin, H. Xu, S. Wei, W. Gong, K. Wang, Q. Wang, N. Berge, K. Zhu, IHEP Q. An, USTC May.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
BESIII Electronics and On-Line BESIII Workshop in Beijing IHEP Zhao Jing-wei Sheng Hua-yi He Kang-ling October 13, 2001 Brief Measurement Tasks Technical.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
More design Works More simulation to study the physics reaches with BESIII. magnet? solid angle coverage ? Identify several important physics topics, and.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China University of Science and Technology.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
Time of Flight Detectors at RHIC Time of Flight Measurements at RHIC  TOF detector as a PID devices  PHENIX-TOF and BRAHMS-TOF PHENIX Time-of-Flight.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Trigger and DAQ System Zhao Jing Wei Sept. 2002, BESIII review, Beijing Outline Trigger system Event rate estimation Principle of design Scheme Monte Carlo.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CLAS12 Trigger System part1: Level1 EC Revision 1, Feb 7, 2007.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Trigger System LIU Zhen’an Inst. of High Energy Physics, Beijing Sep
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
BESIII offline software group Status of BESIII Event Reconstruction System.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
Trigger System of BES III LIU Zhen’an Inst. of High Energy Physics, Beijing June
Electronics for Range System Prototype Tests
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
Status of BESIII and upgrade of BESIII
Jean-Sebastien Graulich, Geneva
Future Hardware Development for discussion with JLU Giessen
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
DCH FEE 28 chs DCH prototype FEE &
CMS EMU TRIGGER ELECTRONICS
Hellenic Open University
GlueX Flash ADCs 3425 PMT channels Forward, Barrel Calorimeters
Special edition: Farewell for Valerie Halyo
Hellenic Open University
Conceptual design of TOF and beam test results
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Regional Cal. Trigger Milestone: Production & Testing Complete
Special edition: Farewell for Stephen Bailey
The time-of-flight reconstruction & calibration
CLAS12 Timing Calibration
BESIII EMC electronics
Performance of MDC during New Data Taking
Special edition: Farewell for Eunil Won
LHCb Trigger, Online and related Electronics
On behalf of MDC electronics group
RPC Front End Electronics
ENGR 1 Presentation Thomas Matthews.
Beam Beam electronics Block diagram disc gated disc gate disc gated
Hall D Front End Electronics
for BESIII MDC electronics Huayi Sheng
Presentation transcript:

Electronics and DAQ Summary M. V. Purohit for Jing Wei Zhao, Zepu Mao, Huayi Sheng, Ping Ping Zhao, Shudi Gu, Yong Zhao Zhou et al.

Vertex Chamber This device is small and will be considered later – after the workshop.

MDC: Choice of Design Schemes Based on《Q to T converter + HPTDC》 Wire signal trigger Online VMEbus Q to T based mainamp Cern HPTDC based TDC Preamp. Calibration

MDC Scheme 2: Based on FADC and HPTDC. Preamp Wire Signal Mainamp Vth Trigger VMEbus timing Clock online Preamp Wire Signal dE/dx Vth Q measurement T Calibration Mainamp

MDC Issues Decision needed on Scheme 1 vs 2 Rests partly on available budget per channel Many noise issues: Reflection from ends of cables Channels closer to beam: no room for preamps on end-plates Cross-talk; Low noise supplies

Block Diagram of the TOF electronics L-threshold H_threshold Start 10ns L0 trigger From Online To Trigger Pre-amp Splitter Stop PMT Signal Driver HL Calibration LL Delay From L1 Trigger ADC Read-out TAC + FADC

Barrel electromagnetic Calorimeter Electronics System block diagram Preamplifiers Trigger Post amplifier V M E L1 Trigger C Trigger CL1 CR (RC)2 ∑ calibration Fan - out Charge measurement controller Σ B G O

EMC issue Major issue is noise reduction Cost is not a serious problem here

Muon Chambers Number of channels needs to be determined from physics considerations

DAQ BESIII’s sub-detectors are: Electronics will consist of five Vertex Chamber Main Drift Chamber TOF plus CCT Counter Electromagnetic Calorimeter MUON Identifier Electronics will consist of five sub-systems correspondingly. Total channel amount is about 50K~77K.

DAQ Schedule Software people exist. It is assumed that sufficient number of students will be found as necessary. Testing of DAQ subsystems must be possible before completion of FEE subsystems. Will help with specifications. This must include diagnostics.

Schematic of BES III Trigger VC DISC Hit Count L0 trigger Logic FEE L0P TOF DISC Hit/Seg Count Global Trigger Logic MDC DISC Track Seg. Finder Track Finder DAQ EMC BTE Sum Tile Sum Tile Processor Total Ener Sum L1P MU DISC Mu track CLOCK RF TTC 2.4 s

Trigger Issue Can L0 be used for timing instead of L1? Should segmentation of of cells match MDC? Might make life simpler. Interface personnel need to be designated.

System-wide issues Manpower: perhaps sufficient, but experienced people (engineers!) needed. Visits from foreign experts? Detailed schedules need to be drawn up: 1.5 to 2 years estimate from most groups needs timelines. Interface with other groups. Fallback options.