Proposals to be Reviewed

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Solar Hot Water Heater. Flat Plate Collector Problem A flat plate solar collector is used as a solar hot water heater. The collector area equals 20 square.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Mod Clarifications Transmission Workstream 6 August 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Mod 0428 Charge Impact October Affected Supply Point Population.
High Level Features of UK-Link Replacement 22nd November 2006.
Workgroup meeting October 2014
UNC Modification Proposal 0202 National Grid Distribution
Exit Capacity Release Methodology Statement
Ontario’s Bill 150 Green Energy and Green Economy Act
CMP Transparency Requirements
Options for Mod 640 Replacement
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
Transmission Workgroup – 1st December 2011
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
Discretionary Non Obligated Capacity release
NTS Entry Charging Review Update
Connected System Exit Points Administration Options
7th July 2011 Transmission Workgroup - Elexon
Modification Proposal 0283
Publication of Zonal Flex Data
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
Enduring NTS Exit Capacity Arrangements - Update
Connected System Exit Points Administration Options
Quantity Holders (COR2970) Presentation to UK Link Committee
Nexus Requirements To support the current business processes
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Flow Swap Scenarios – Agreed Logic
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
June 2019 Release Scope DSC Change Management Committee
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream – Partial Assignment
Wales & West Utilities Mod 0671 User Commitment
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
Reinstatement of NTS Interruption
Review Group 0334 User Pays update – Modifications 288, 289, 290.
Provision of Interruption Information by DNOs to Transco NTS
Modification Proposal 0133 – “Introduction of AMTSEC auction”
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Nexus Workgroup Mod 0473 Presentation
Information Provision for Transitional Exit Capacity
Workgroup meeting October 2014
Transmission Workstream 1st February 2007
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Stefan Leedham Transmission Workstream 2nd November 2006
Modification 0043 – Limitation on offering for sale unsold capacity
RG 175 – Encouraging Participation in the Elective Daily Metered Regime – Tactical Solution. (Indicative Costs) Joel Martin – 26 June 2008.
Transmission Workstream, 1 Mar 07
Modification 440 Project Nexus iGT Single Service Provision
Transmission Workstream 05 November 2009
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

Proposals to be Reviewed 0290 To facilitate the release of Additional NTS Exit (Flat) Capacity at National Grid NTS’s discretion 0289 To determine the amount of Annual NTS Exit (Flat) Capacity to be released where the quantity of unsold NTS Exit Capacity fluctuates within the Gas Year 0288 Facilitating the Reduction of Enduring Annual NTS Exit (Flat) Capacity by a value less than 100,000 kWh 0270 Aggregated Monthly Reconciliation for Smart Meters 0255 Publication of Objection Rates for LSP Supply Points 0248 Meter Reading Replacement 0224 Facilitating the use of AMR in the Daily Metered Elective Regime