PKL INVESTMENTS LTD Value of contract: Length of contract:

Slides:



Advertisements
Similar presentations
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
Advertisements

PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
FAÇADE RETENTION IN CITY-CENTRE DEVELOPMENT
January 2004Facilities Management Division, University of Saskatchewan College Building Restoration Project Impact of the C.I.S. Alliance of Saskatchewan’s.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Leaving Certificate Social and Scientific Home Design and Management Elective ©PDST Home Economics.
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
Technical boclair academy Building Drawings.
Meet the DBI Pros Summit October 11-12, 2007 Isam Hasenin, P.E., C.B.O., Director How To Obtain a Permit.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
FAMILY RESIDENTIAL Author of the slides: Dr. Robert Cvelbar +, Simon Brlek ++ Institute for Metal Constructions, Lokainvest Case study no. 2 Leonardo da.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 11 Improvement Analysis.
Underwriting a Development Loan and General Short Term Finance Eugene Esterkin and Gary Lederberg.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Operational Research (O.R.) case studies. What’s the problem?
Restoration is defined as the act or process of accurately depicting the form, features, and character of a property as it appeared at a particular period.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
1 Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
Bengal Shapoorji Housing Development Pvt. Ltd. Presents Shukhobrishti: Luxury Residential Flats.
Minor Works & Plant Hire Meet the Buyer Event Tyrone 21st June 2017
Construction Documents
Curriculum for Excellence
RIBA Plan of Work 2013.
Prepared by Frank Cooney B.Arch MRIA
TO LET (MAY SELL) Former HSS Hire Unit Wakefield Road Bradford BD4 7LX
Pre-Contract Cost Control
Decisions and considerations of choosing or building a new home.
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
20 Chestnut Drive, Mansfield
Hopewell Valley Regional School District
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
C.M. Scullion Associates Ltd
Building Drawings.
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
1 | P a g e SLABS Engineering Pvt. Ltd., World Trade Center, Level 9, Tower 2, Opp. EON Free Zone, Kharadi, Pune India. T /
HUD 203(k) Renovation Loan Program
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
Poswillow Suite, Children's Dental Unit
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
FAÇADE RETENTION IN CITY-CENTRE DEVELOPMENT
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
Earls Terrace, London W8 Clients core business
RIBA Plan of Work 2013.
EAST PENNSBORO AREA SCHOOL DISTRICT
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
Value of contract: Length of contract: Contract start date:
Presentation transcript:

63 / 64 Friar Gate, Derby Conversion of city centre offices into 17 residential apartments PKL INVESTMENTS LTD Value of contract: Length of contract: Contract start date: Completion date: £1.4 M 14 months March 2016 May 2017 Works/services provided: Extensive strip out and demolitions - by hand Replacement of Welsh slate roof Replacement of rotten structural timbers & installation of steel beams Removal of lath & plaster ceilings & rotten timber floors and complete replacement Works/services provided: Repair and replacement of timber sliding sash windows Complex mechanical and electrical design & installation Decorative plasterwork Installation of kitchens and bathrooms Floor & wall finishes, decoration.

63 / 64 Friar Gate, Derby Conversion of city centre offices into 17 residential apartments Detailed description of contract: Conversion of two three-storey 19th century ‘Listed’ commercial buildings within the Derby City conservation zone, to provide 17 Luxury city centre ‘serviced’ apartments. Administered through a JCT form of contract with elements contractors design; the scheme included a two-storey extension to the former coach house to provide a suitable space for self-contained duplex apartments. The design was developed with DCC conservation officer with a remit to retain period features, remove crude 20th century additions and return the premises to their former glory whilst incorporating 21st century technology. Particular challenges to be overcome: Contact details: Sympathetic restoration of the Victorian façade and repair of the sliding sash timber windows Coordinating an upgrade of the mains electrical supply and installing new foul drainage to service the increased demand Complicated temporary works installation to enable substantial removal and alteration of the structure Mr. Simon Rhodes Gaskell Construction Consultants Victoria House 104 Mansfield road Nottingham, NG1 3HD Tel: 01159 484744