Presented by Eduard Porosnicu, EUROCONTROL

Slides:



Advertisements
Similar presentations
First ICAO Global Symposium on TEM and NOSS Luxembourg November TEM & NOSS The EUROCONTROL Perspective Alexander Skoniezki Head of Business.
Advertisements

ADQ IMPLEMENTATION WORKSHOP Summary, Conclusions
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Progress of Digital NOTAM Development and Implementation
Introduction to Digital NOTAM
Delivering Digital Services Aeronautical Information Services in Europe Presented By: Eduard Porosnicu, EUROCONTROL Date:August 26, 2014.
1 Topics raised Implementation of the Digital NOTAM system Mapping the information to AIXM how to generate a minimum subset of the aixm model to generate.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
RITMechanical Engineering PLEASE TAKE A SEAT, BUT NOT WITH YOUR TEAM:
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
7 June 2012 Guidelines for the Compilation of Water Accounts and Statistics Guidelines for the Compilation of Water Accounts and Statistics UN Statistics.
The European Organisation for the Safety of Air Navigation EAD AIXM 5.1 Implementation Razvan Guleac DNM/COO/NOM/ADM AIXM 5.1 Seminar.
Examination Feedback Maximum Impact, Minimum Cost? Paul L. Latreille Seminar January 24 th 2011.
The European Organisation for the Safety of Air Navigation OGC Aviation DWG - Bonn Hubert LEPORI EUROCONTROL – DSR/CMN/IM 01-March-2011.
EUROSAI Professional Standards – Goal Team 2 Brief introduction Cristina Breden Mária Kysucká Vilnius, September 2012.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
Summary and Next Steps. Summary Web site –Forum –Design Documents, UML and XSD Collaborating on Digital NOTAM –Continuing the trial –AIXM 5 Wiki –Lessons.
The European Organisation for the Safety of Air Navigation AIXM 5.1 Seminar Introduction.
The European Organisation for the Safety of Air Navigation AIXM Procedure Modelling/Encoding seminar Brussels – 01/02 Sept 2010.
Overview and Logistics. Administrative information Cell Phones Registration and Nametags Handouts CDs All materials will be published on
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Introduction and Welcome. Objectives Present AIXM 5 goals Explain AIXM 5 design concepts –Temporality –GML – Geography Markup Language –Metadata –Identification.
Query Health Operations Workgroup Standards & Interoperability (S&I) Framework October 13, :00am – 12:00pm ET.
AIS-AIMSG/12 Briefing to ANC 23 October 2015
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
Introduction to Digital NOTAM
AIXM Procedure Modelling/Encoding seminar
5-7 DEC 2016, EUROCONTROL HQ, Brussels
AIXM 5.1 – Metadata AIXM CCB – Webex 18 JULY 2017.
AIXM 5.1 – Interoperability issues
Welcome and Introduction
19th GRI Coordination Group meeting
Introduction and Welcome
4 - 8 November 2013 AIM relevant - Assembly conclusions
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
AIXM 5.2 – WIP AIXM CCB – Webex 20 nov 2017.
AIXM 5.2 – WIP AIXM CCB – Webex 09 MaY 2017.
RST Support Resources Session 5 Presentation 3.
Riding the Wave of Innovation
AIXM 5.1 – Interoperability issues
ICAO AISAIMSG #8 - Intro 4-8 November 2013
Introduction.
Presented by Eduard Porosnicu, EUROCONTROL
Training for developers of X-Road interfaces
Riding the Wave of Innovation
Advancing Digital NOTAM implementation
09/12/2018.
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
Introduction and Welcome
AIXM 5.1 – Interoperability issues
SAM Regional Seminar/Workshop
Eddy Porosnicu EUROCONTROL
ET-WISC structure and work plan
Welcome and Introductions
Introduction to Digital NOTAM
AIXM CCB – Webex 24 January 2017
AIXM 5.1 – Interoperability issues
Eddy Porosnicu EUROCONTROL
Summary and Discussion
AIXM 5.2 – WIP AIXM CCB – Webex 29 March 2017.
Welcome.
AIXM 5.2 – WIP AIXM CCB – Webex 10 OCT 2017.
AIXM CCB – Webex 28 FEBRUARY 2017
Thames Valley Chamber / Claire Logic
Digital AIM Training - Introduction Introduction – day 2
AIXM 5.1 – Interoperability issues
Presentation transcript:

Presented by Eduard Porosnicu, EUROCONTROL Conclusions Presented by Eduard Porosnicu, EUROCONTROL

Proposed actions Make the presentations available on www.aixm.aero Please send feedback about this session to eduard.porosnicu@eurocontrol.int Good idea / waste of time… Ideas / questions for future sessions Develop an “AIXM awareness” training for operational people Including a Digital NOTAM module Find a test (AIXM 5.1 data!) user for all implementations Use the Digital NOTAM (AIXM 5.1 data) provided by the existing implementations for a test user implementation

Possible actions Recommend a common solution for the interfaces that are available to access the Digital NOTAM service (REST, etc.) Directly related to the SWIM developments in ICAO Start with an inventory maybe… Develop guidance for users of Digital NOTAM Explain how the data is coded Work on graphical presentation of Digital NOTAM for STATE provided briefing keep in mind that end users (airlines, service providers) have their own standards for graphical presentations Schedule another “implementations” Webex in Q2 2019

Conclusions  Provide a platform for States / organisations involved in a Digital NOTAM implementation to share their experience Thanks for the 4 implementation presentations! Collect feed-back Identify areas for improvement in the Digital NOTAM Specifications Understand expectations for training material Encourage data user Clarify how to access the digital NOTAM data source Present applications that benefit from Digital NOTAM Encourage further implementations Regulatory – evolution of ICAO SARPS/guidance and regional rules Voluntary – awareness on Digital NOTAM benefits   

Closing remarks All presentations will be published at www.aixm.aero/library Reminder (for the FG members) Next Digital NOTAM Specification 2.0 – working session 02 October, 14:30 CEST (12:30 UTC, 8:30 EDT) Any other questions / comments?