AOA A style of project network diagram in which arrows AOA or AON or Gantt chart? AOA A style of project network diagram in which arrows represent tasks and their connections with nodes represent precedence relationships. Page 192 Click here for Hint
AON A style of project network diagram in which nodes AOA or AON or Gantt chart? AON A style of project network diagram in which nodes represent tasks and the connecting pathways represent precedence relationships. Page 192 Click here for Hint
backward scheduling or CPM or forward scheduling? backward scheduling Scheduling backward from a project’s deadline to its start time. Page 205 Click here for Hint
Central Limit Theorem The observation that sample values approximate standard normal distribution or PERT or Central Limit Theorem? Central Limit Theorem The observation that sample values approximate a normal distribution, regardless of the underlying distribution of the population being sampled. Page 212 Click here for Hint
CPM Critical Path Method, a project management PERT or CPM or WBS? CPM Critical Path Method, a project management methodology developed by DuPont Corporation. Page 191 Click here for Hint
path or precedence relationship or crashing? Expediting the completion of a task or group of tasks, to finish a project sooner. Page 206 Click here for Hint
critical path The longest path through a project network; critical path or milestone or expected value? critical path The longest path through a project network; determines the length of the entire project. Page 201 Click here for Hint
deterministic Fixed and known in advance, representing a critical path or deterministic or expected value? deterministic Fixed and known in advance, representing a high level of certainty when planning. Page 192 Click here for Hint
expected value The mathematical expectation of a random expected value or probabilistic or Central Limit Theorem? expected value The mathematical expectation of a random variable, calculated as the weighted average of all possible values that may occur. Page 210 Click here for Hint
forward scheduling or backward scheduling or critical path? forward scheduling Starting an activity as soon as possible, regardless of its deadline. Page 204 Click here for Hint
path or precedence relationship or Gantt chart? Gantt chart A scheduling diagram that illustrates activities across a horizontal time line. Page 204 Click here for Hint
precedence relationship? immediate predecessor or milestone or precedence relationship? immediate predecessor A task that must be completed before another task can start. Page 190 Click here for Hint
crashing or incident or AON? A project with no previously planned timing and a high degree of dependence on its immediate environment for successful resolution. Page 191 Click here for Hint
iterative planning Adjusting plans at short intervals, to reflect backward scheduling or PERT or iterative planning? iterative planning Adjusting plans at short intervals, to reflect emerging information. Page 191 Click here for Hint
milestone A point of significance in the time line of a project. milestone or slack or incident? milestone A point of significance in the time line of a project. Page 190 Click here for Hint
path Any sequence of linked PERT or precedence relationship or path? path Any sequence of linked activities that connect the beginning with the end of a project network. Page 195 Click here for Hint
PERT Program Evaluation and CPM or PERT or WBS? PERT Program Evaluation and Review Technique, a project management methodology developed by the US Navy. Page 191 Click here for Hint
precedence relationship PERT or precedence relationship or path? precedence relationship A dependency between two tasks, usually requiring that one task be completed before the other task is started. Page 193 Click here for Hint
probabilistic Variable or not well standard normal distribution or incident or probabilistic? probabilistic Variable or not well known in advance; subject to randomness. This represents uncertainty in planning. Page 209 Click here for Hint
project A unique collection of activities creating a project or path or PERT? project A unique collection of activities creating a particular outcome. Page 190 Click here for Hint
slack or incident or crashing? The degree to which a task may be delayed from its early start without delaying the project. Page 202 Click here for Hint
probabilistic or deterministic? standard normal distribution or probabilistic or deterministic? standard normal distribution A normal distribution with a mean of zero and a variance of 1. Page 214 Click here for Hint
AON or AOA or WBS? WBS Work Breakdown Structure, a document specifying the tasks required to finish a project. Page 190 Click here for Hint