A. Ibarra and The WPENS team

Slides:



Advertisements
Similar presentations
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
Advertisements

Current Status of IFMIF
Assessment of beam-target interaction of IFMIF A state of the art J. Knaster a, D. Bernardi b, A. García c, F. Groeschel h, R. Heidinger d, M. Ida e, A.
Institute for Nuclear and Energy Technologies 1 L. Stoppel, Th. Wetzel FAIR and IFMIF liquid metal free surface target experiments at KALLA KALLA KIT –
Development Processes UML just is a modeling technique, yet for using it we need to know: »what do we model in an analysis model? »what do we model in.
March 3-4, 2008/ARR 1 Power Management Technical Working Group: TRL for Heat and Particle Flux Handling A. René Raffray University of California, San Diego.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
IFMIF/ELAMAT initiative in Poland Adam Maj NUPECC Meeting, Athens, March 13-14, 2015.
Systems Engineering Management
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Activities and Strategy in Japan on Fusion Technology for DEMO Hiroshi Horiike Osaka University Graduate School of Engineering Fusion Power Associates.
Introduction to Computer Technology
PLM Business Case Supporting industry partners in decision making: – Why: the business case; – What: the processes and project which are going to use PLM.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Effective Methods for Software and Systems Integration
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
Software Engineering Management Lecture 1 The Software Process.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
1/9 Session III-B Special Liquid Lithium Technology Session Summary C. H. Skinner, session chair Princeton Plasma Physics Laboratory 2 nd International.
Parameter to be measured Proposed Diagnostic System Critical Components Relevant Radiation fields Potential radiation effects Li temperatureIR camera Lens20-50.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Scope and Project Plan of IFMIF/EVEDA Presented by Masayoshi SUGIMOTO (IFMIF/EVEDA Project Team, Deputy Leader/ JAEA) IAEA’s Technical Meeting on Nuclear.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Study on IFMIF Beam-Target Interface
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Implementing SMS in Civil Aviation: the Canadian Perspective
Software Engineering Management
News and brief overview of Beamline plans for the next few months
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
LIPAc Control System Reliability improvements
Workshop on Advanced Neutron Source and its Application
Advanced-Fusion Neutron Source
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
Summary of session 5: Innovative Ideas and New R&D
DONES: DEMO-Oriented Neutron Source Workshop on Advanced Neutron Sources and its Applications. Aomori (Japan) November 4-5, 2017 A. Ibarra (CIEMAT) representing.
1st Workshop on Advanced Neutron Source and its Application
Fernando Mota, Christophe J. Ortiz, Rafael Vila
Complementary Experiments at DONES
Electrical Engineering
Raytheon Parts Management
Engineering Processes
Superbeam Horn-Target Integration
Engineering Processes
PSS verification and validation
DOE Review of the LCLS Project October 2006
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
IFMIF/DONES Project: opportunities for the industry
Presentation transcript:

A. Ibarra and The WPENS team The European approach to the fusion-like neutron source: The IFMIF-DONES Project     FEC 2018, Gandhinagar (India), October 22-27th 2018 A. Ibarra and The WPENS team

The WPENS Team F. Arbeiter, D. Bernardi, A. García, W. Krolas, M. Capelli, U. Fischer, R. Heidinger, D. Jiménez, F. Martin-Fuerte, G. Micciché, A. Muñoz, F. S. Nitti, T. Pinna, K. Tian + Many other people from different institutions and companies A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 2

Outline The IFMIF-DONES project IFMIF-DONES description Summary A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 3

Outline The IFMIF-DONES project IFMIF-DONES description Summary A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 4

Neutron source requirements Along the time, it has been widely recognized that a fusion-like neutron source is needed for fusion materials qualification both for DEMO and the power plant development The requirements are to produce fusion-like neutrons Intensity large enough to allow accelerated testing, Damage level above the expected operational lifetime, Irradiation volume large enough to allow the characterization of the macroscopic properties of the materials of interest required for the engineering design The most feasible approach based on Li(d,xn) sources The IFMIF project since 90´s A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 5

Neutron source requirements Along the time, it has been widely recognized that a fusion-like neutron source is needed for fusion materials qualification both for DEMO and the power plant development Requirements based on EU DEMO needs The requirements are to produce fusion-like neutrons Intensity large enough to allow accelerated testing, Damage level above the expected operational lifetime, Irradiation volume large enough to allow the characterization of the macroscopic properties of the materials of interest required for the engineering design > 10 dpa(Fe)/fpy 20 dpa(Fe) in 1.5 y 50 dpa(Fe) in 3.5 y 300 cm3 The most feasible approach based on Li(d,xn) sources The IFMIF-DONES project!!! The IFMIF project since 90´s A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 6

What is IFMIF-DONES? IFMIF-DONES (Demo-Oriented Neutron Source) It is the minimum neutron source required to fulfill the materials fusion-like irradiations needs of DEMO IFMIF-DONES (Demo-Oriented Neutron Source) Main technical characteristics: Based on IFMIF Preliminary Engineering Design simplified as much as possible Objective of the work presently under development: to be ready for start of the construction phase in the early 20´s Still no formal decision is made!!! A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 7

IFMIF-DONES Timeline Project timeline IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline IFMIF-DONES Conceptual Design Report 2014 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 8

IFMIF-DONES Timeline Project timeline IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline Plant and systems requirements definition Design guidelines Boundaries and interfaces identification Implementation of design choices Systems design Integrated analysis IFMIF-DONES Conceptual Design Report 2014 Reference Design Second half 2016 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 9

IFMIF-DONES Timeline Project timeline IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline Plant and systems requirements definition Design guidelines Boundaries and interfaces identification Implementation of design choices Systems design Integrated analysis IFMIF-DONES Conceptual Design Report 2014 Reference Design Second half 2016 Preliminary Engineering Design report end 2017 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 10

PEDR content Executive Summary Plant Design Description Document (PDD): Main body + Annexes (incl. Desing Guidelines, PBS and Interfaces, RAMI, Safety, Operation and Maintenance, Integrated Modelling, 3D CAD,…) Design Description Documents (DDDs) (one per system) A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 11

IFMIF-DONES Timeline Project timeline IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline Plant and systems requirements definition Design guidelines Boundaries and interfaces identification Implementation of design choices Systems design Integrated analysis EU site proposal: Granada (Spain) End 2017 IFMIF-DONES Conceptual Design Report 2014 Reference Design Second half 2016 Preliminary Engineering Design report end 2017 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 12

DONES EU Site Location It is located in the Granada province (Andalusia region – southern Spain), 18 km southwest from Granada city in the Granada Metropolitan park (Escúzar ). A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 13

IFMIF-DONES Timeline Project timeline IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline Plant and systems requirements definition Design guidelines Boundaries and interfaces identification Implementation of design choices Systems design Integrated analysis EU site proposal: Granada (Spain) End 2017 IFMIF-DONES Conceptual Design Report 2014 Reference Design Second half 2016 Preliminary Engineering Design report end 2017 DONES in EU ESFRI Roadmap 2018 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 14

Outline The IFMIF-DONES project IFMIF-DONES description Summary A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 15

Accelerator systems summary SRF cryomodule RFQ 175 MHz, 5MW, 125 mA, CW, high availability: One of the more powerful accelerators in the world. Waiting for validation results from LIPAc (Rokkasho) Very similar to the IFMIF one but some changes implemented…. A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 16

Test Systems summary Irradiation module Cooled shielding plug Design driven by the presence of neutrons and Li Internal components cooling by He Remote Maintenance required HFTM: it is feasible different temperatures of irradiation with active controlled temperature stability Similar to the IFMIF one but some changes implemented (or to be implemented)… Duct penetration A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 17

Li systems summary Target assembly Oil-Oil secondary HX Support structure Lithium inlet pipe Inlet nozzle Back-Plate FDS Outlet nozzle Target chamber Beam duct Quench Tank Lithium outlet pipe IISP Inlet pipe fixed point TC floor level Oil-Oil secondary HX Li-Oil primary HX LI main loop Target assembly Oil-Water tertiary HX Li monitoring Li purification loop A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 18

Li systems summary Support structure Lithium inlet pipe Inlet nozzle Back-Plate FDS Outlet nozzle Target chamber Beam duct Quench Tank Lithium outlet pipe IISP Inlet pipe fixed point TC floor level Oil-Oil secondary HX 5 MW power handling, 15 m/s Li velocity, remote handling Main requirements: Li flow stability and Li impurities control Main challenges to be considered: Target Assembly lifetime Risk of cavitation, Li evaporation T (and other radioactive ions) inventory Very relevant results from IFMIF/EVEDA validation activities Very similar to the IFMIF one but some changes implemented… Li-Oil primary HX LI main loop Target assembly Oil-Water tertiary HX Li monitoring Li purification loop A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 19

Remote Handling System Key and complex system It requires evaluation of maintenance needs and dose maps, identification of all the required operations, design of common and specific tools, evaluation of the operations,… A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 20

Outline The IFMIF-DONES project IFMIF-DONES description Summary A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 21

Available Irradiation Volume vs DPA IFMIF 20x5 cm2 beam IFMIF-DONES 10x5 cm2 beam IFMIF-DONES 20x5 cm2 beam A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 22

Summary A fusion-like neutron source is needed as soon as possible for DEMO design and IFMIF-DONES is the proposed European alternative to be implemented in the near future IFMIF-DONES design is based on IFMIF design evolved to take into account a reduced scope and results obtained during the prototyping phase Preliminary Engineering Design Report were released early 2018. Present design activities are site specific (Granada-Spain-) A “Start of construction” decision should be taken as soon as possible A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 23

End A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 24