Voyage into Validation

Slides:



Advertisements
Similar presentations
Calculating Quality Reporting Service
Advertisements

MOSS 2007 Document Management Adam McCarthy 1 st April 2009.
SAM 2007 v4 The Student Experience Including SAM Projects, SAM Exams and SAM Training.
Patient Charges in Meditech 6.1
Orchard Harvest™ LIS Review Results Training
SEVOCITY WELCOMES 1. AGENDA Introductions Key Responsibilities Review of Key Information Major Project Steps – Review 2.
U.S. Bank Fleet Virtual Pay
System Implementation
RPMS Package Optimizations
9/10/20151 Hyperion Enterprise 6.5 New Features & Functionality Robert Cybulski, CPA Finit Solutions.
Presenter name. Ryan Brandon Exan Group What’s New with axiUm New Features in axiUm Patient Self-Service Options Future Plans axiUmSupport.com.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Class Instructor Name Date. Classroom Tips Class Roster – Please Sign In Class Roster – Please Sign In Internet Usage Internet Usage –Breaks and Lunch.
Mount Auburn & MACIPA OneIS Staffing Summit
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
NORTH AMERICAN HEALTH CARE, INC. DOCUMENTATION–DOCUMENTATION– DOCUMENTATION DOCUMENTATION.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
CUG Request from 2010 and 2011 User Group Meetings Cortex User Group Meeting Portland, OR – 2012.
School of Health Sciences Week 4! AHIMA Practice Brief Fundamentals of Health Information HI 140 Instructor: Alisa Hayes, MSA, RHIA, CCRC.
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
Getting Useful Reviews
The VVSG 2005 Revision Overview EAC Standards Board Meeting February 26-27, 2009 John P. Wack NIST Voting Program National Institute.
Up-lementation to v4.5 Sue Hughes Director, SCC Implementation/Upgrades.
4.0.7 New Features Presented by Nicholas Felts. What version are you on? A or lower B C D.Live on E.Going to
SoftTotalQC® : Sporting New Features and Taking the Gold with Stronger Standards and Higher Performance! Presented by: Isis Smith, MLS(ASCP) SCC SoftTotalQC.
SoftReports – Ad hoc Reports Presented by Shireen Lakhan SoftReports LIS Trainer.
CLINIC-LAB COMMUNICATION Configuring 3Shape Communicate™
Foreign Barcode.
Presented by: University of Rochester Medical Center
Presented by Donnice Picart and Jolene Massey
Archie Dennis New Features Archie Dennis
Laboratory Information Management Systems (LIMS)
Baylor Scott and White Health, NTD Melinda Doherty, Director LIS
A Software Installation Duet
Orchestra Pits Common and Not –So-Common SCC LIS Problems
Here’s an overview of the three-part setup process.
SoftBank Enhancements
Claudia Harrier The Vancouver Clinic
The Triathlon (Planning, Execution and Validation)
Short Guide to SoftMic Supplemental Billing
Fast Draw Techniques SoftTotalQC Reports Showdown: Bang! Bang! Bang!
SoftReports - Patient Reports
Test Around the Clock Testing Revolutionized
Benefits of Keeping Best of Breed vs Replacement with Single Vendor
SoftLab 4.5 Overview Archie Dennis.
NEW FEATURES SoftMic Version x Randy Carter SoftMic Specialist
System Development Life Cycle (SDLC)
Teaming With Your AE Fantastic Voyage
Piecing Together a Soft Upgrade (4.0 line)
Lessons Learned Interfacing SoftBank to Foreign LIS
Engineering Processes
‘CORRAL’ Your New Instrument Build
Project Accounting in Microsoft Dynamics SL | Time & Expense.
Product Development Scenario Overview
CMAST Update March 25, 2014.
SoftPath: Patch to Success Without Stress
The Pathologist Review Process by Gerald M
BB instrument interfaces - setup - workflow - troubleshooting
Centre name Project Kick Off.
Executive Steering Committee Meeting May 6, 2009
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Upgrading from SoftPath to SoftPathDx “Passing of the Torch” Presented by: Christine Comella SoftPathDx Implementation Specialist.
New Product Line SoftMic
Upgrading to SoftLab Version X
Configuration Management
ePerformance: A Process Crosswalk May 2010
Future enhancements, integration and new development
OU BATTLECARD: WebLogic Server 12c
Presentation transcript:

Voyage into Validation Launch into Validation with Confidence Claudia Harrier The Vancouver Clinic Vancouver, Washington

1. Have a Plan 2. Benefits of Templates 3. Pre-Validation Voyage Overview 1. Have a Plan 2. Benefits of Templates 3. Pre-Validation 4. Validation 5. Post-Validation 6. Validation Summary

Voyage into Validation HAVE A PLAN

Have a Plan Understand the Validation Project Major Upgrade for SCC or HIS/EMR Minor Upgrade(Hot Fix)--SCC or HIS Change of Reference Lab New Tests New Instruments New Sites

Have a Plan What is changing? Check Release Notes Check Related Star Tasks What systems are involved? EMR HIS Reference Lab Billing System

Have a Plan Identify Resources and Staffing Determine Time Requirements Dedicate Time for Validation Identify “Show-Stoppers” Set a Tentative Go-Live Date

Voyage into Validation BENEFITS OF TEMPLATES

Benefits of Templates Identifies important validation points/steps Is ready when you are Can be easily amended Makes you look organized

Voyage into Validation PRE-VALIDATION

Pre-Validation Assessment Assures access to applications Assures that basic functionality has not been compromised Assures interface messages are flowing as anticipated

Pre-Validation Assessment Form Pre-Assessment Functionality Check Software/Version:________________ Date Test Epic Order # Ordered in Epic SCC Order # Results in Epic Initials   CBC RA with Reflex TSH-Referred Comments: The above Upgrade/Change has passed pre-assesment functionality check. Validation testing may commence. Date _____________________ Approved by:________________________

Voyage into Validation

Choose tests that validate: Validation Choose tests that validate: All departments All sites Instrument-interfaced tests Manually resulted tests In-house tests Group/Individual tests Reference Lab tests Tests that reflex Amended tests Tests with panic levels Variety of microbiology tests

Functions to Validate Order entry Faxing Call List Keypads RBS Label Formats Report Formats Query Print Scheduler Autoreporting Scanners Reports Faxing Keypads Security QC Worklists Audit Trail Canned Messages Calculations Multi-site/Redirection

Validation Form SCC Test ID Epic ID Test Name Scenario Epic # Name Integrated SCC Test ID Epic ID Test Name Scenario Epic # Name Order Date SCC SoftPath VP # Tech completed Professional Completed Results in Epic? Expected Cpts to charge CPTs charged in Epic Validate Date Validate Initials 1   2430 % IRON SATURATION PANEL 2 * 2505 17 OH CORTICOSTEROIDS, 24 H URINE-REF Commercial Ins

Voyage into Validation POST-VALIDATION

Post-Validation Finalize Go-Live date Inform all invested parties: SCC Lab Departments Reference Lab HIS Staff Hospital Staff Outreach Clients

Post-Validation (Post- Go Live) Form Post-Live Functionality Check Software/Version:______________________________ Date EPIC ID In-House Tests Performed at Epic Order # SCC Order # Results in Epic Initials   LAB293 CBC-manual result-high & low values-Smear Review MHEMA CBC-run on analyzer LAB239 URC-run on analyzer MMICR LAB9980 PTINR-manual result MCOAG

Voyage into Validation VALIDATION SUMMARY

Post-Validation Summary Purpose A record of dates A record of issues for future reference Overview Keep notes throughout validation Write summary of process Date & sign

SUMMAry exAMPLE SOFTPATH UPGRADE 4.3.08.12 (Including ASCII Base 4.02.22.3, HIS 4.02.59.1, INST 4.02.48.2, COMMONS 4.1.1.13.5, & SOFT REPORTS 1.1.7.5.1 ) The Vancouver Clinic SoftPath Upgrade was installed in SCC UPG environment on 8-31-09. The version in LIVE was 4.2.3.4.9. At the same time the following were also installed in SCC UPG: PRODUCT                    LIVE                 UPG AIX                              5.3.0.8.2           5.3.0.8.2           ASCII BASE                 4.0.2.21.4          4.02.22.3 HIS                               4.0.2.50.1          4.0.2.59.1 INST                             4.0.2.41.3          4.0.2.48.2 COMMONS                  4.1.1.12.4         4.1.1.13.5 PATH                            4.2.3.4.9           4.3.0.8.12 SOFTREPORTS           1.1.7.0.24          1.1.7.5.1 The following were unchanged in the upgrade project: PRODUCT                    LIVE                 UPG LAB                              4.0.3.13.2          4.0.3.13.2 ORACLE                       10.2.0.4.0          10.2.0.4.0 Release notes were reviewed for applicable functionality and changes. Pre-validation testing was completed on 10-07-09. The testing of the validation scenarios began on 10-09-09 and was completed on 11-30-09. A hot fix for the assigning of specimen source was installed and validated. Other problems encountered were fixed or were suspended to future releases. The LIVE SoftPath back-up was completed by The Vancouver Clinic’s IT department at 12:15 am 12-14-09. SCC began the install of the upgrade into LIVE at 03:00 12-14-09 and completed at 06:29. The testing of SoftPath and SoftLab was completed by SCC technical specialists at 6:44 am. A tissue was ordered on a Test Patient to test functionality in LIVE environment. Validation of SoftLab functionality and interface check in LIVE environment was completed at TVC at 7:02 am. The applicable TMS items were updated. Claudia Harrier MLT(ASCP)QLI Software Analyst, LIS 12-14-09

I am pleased to attempt to answer your questions. During the question time, you may download template examples to your jump drive.

Thank you for joining me on the Voyage into Validation! Thanks a Bundle! Thank you for joining me on the Voyage into Validation!